The Prospector News

StrikePoint Acquires Hercules Gold Project in Nevada’s Walker Lane

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

StrikePoint Acquires Hercules Gold Project in Nevada’s Walker Lane

 

 

 

 

 

StrikePoint Gold Inc. (TSX-V: SKP) (OTCQB: STKXF) is pleased to announce that it has acquired the Hercules Gold Project by way of the acquisition agreement signed August 30, 2024 of all of the issued and outstanding common shares of Alcmene Mining Inc., a wholly-owned subsidiary of Elevation Gold Mining Corporation in consideration for $250,000, plus a re-imbursement of reasonable legal expenses. The transaction was arms length, and no finder’s fees were paid.

 

“This acquisition represents our second district scale land package in the Walker Lane,” said CEO Michael G. Allen. “Multiple operators have drilled showings across a property and encountered significant mineralization, giving the possibility of a generational mine being discovered on the property.”

 

The Hercules Gold Project consists of 1,323 unpatented mining claims and four patented mining claims covering approximately 100 square kilometers of prospective Walker Lane geology located approximately one hour from Reno, Nevada. The property is just 20 kilometers East of the Comstock Gold Mine where historically 14 million gold ounces have been recovered(Wikipedia).

 

Figure 1: Hercules Project Location Map

 

Hercules Gold Project Highlights:

 

The Hercules Gold Project is a low sulphidation epithermal gold target. Potentially economically significant gold grades/thicknesses have been drilled by multiple operators over a large area suggesting a strong gold mineralizing system. Drilling has largely been focussed on the northern portion of the property focussed on 5 target areas, Hercules, Cliffs, Loaves, Northeast and Rattlesnakes. The property has a Plan of Operations drill permit in place on the northern portion of the property, and two Notice of Intent drill permits on the southern portion of the property. Historically, ownership of the property was divided between multiple operators, hindering exploration. StrikePoint Gold will be able to explore the property without boundary constraints.

 

Figure 2: Hercules Gold Project Select Drillholes

 

 

Table 1, Highlight Drill Intervals

 

Eclipse Gold, Hercules Gold Project, Nevada,  Drill Highlights
Hole ID Target From (m) To (m) Length Au g/t Ag g/t Date of Release
H20010 Hercules 27.43 117.35 89.92 0.65 12.51 6/10/2020
including Hercules 51.82 82.30 30.48 1.10 26.17 6/10/2020
H20031 Hercules 0.00 30.48 30.48 1.63 18.27 3/22/2021
including Hercules 6.10 9.14 3.05 5.55 47.9 3/22/2021
H20040* Cliffs 184.40 224.03 39.62 1.12 5.38 3/22/2021
including Cliffs 185.93 192.02 6.1 5.04 14.93 3/22/2021
H20002 Northeast 1.52 47.24 45.72 0.33 1.87 6/10/2020
H20003 Loaves 71.63 85.34 13.72 0.40 6.01 6/10/2020
H20006 Rattlesnakes 15.24 38.10 22.86 0.32 1.93 6/10/2020​

 

 

Length is sample length; true thickness was estimated in the above news releases between 60% and 90% of sample length.

 

Certain claims have reserved royalties to a maximum of 3%, with associated buy downs. A portion of the claims are under option with an annual payment of $50,000 per year to be made between 2025 and 2032.

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release

 

Qualified Person Statement

 

All technical data, as disclosed in this press release, has been verified by Michael G. Allen, P. Geo, President and CEO of the Company. Mr. Allen is a qualified person as defined under the terms of National Instrument 43-101.

 

About StrikePoint

 

StrikePoint Gold is a gold exploration company focused on building precious metals resources in Canada and the Western United States.

 

The Cuprite Gold Project consists of approximately 574 unpatented claims covering approximately 44-square kilometers, located 15-kilometers south of Goldfield Nevada, and 85-kilometers northwest of Beatty. The project is easily accessible by Highway 95 on the western margin of the property. The project is located within the Walker Lane Gold Trend, which hosts AngloGold’s exciting Silicon Gold and Merlin discoveries approximately 75-kilometers southeast of Cuprite. In addition, the Walker Lane hosts Tier 1 gold mines including Kinross’s Round Mountain Mine located approximately 130-kilometers North of Cuprite Gold Project.

 

In addition to Cuprite Gold Project, the Company controls two advanced-stage exploration assets in British Columbia’s Golden Triangle: the past-producing high-grade silver Porter-Idaho Project and the high-grade gold Willoughby Project.

 

Posted September 3, 2024

Share this news article

MORE or "UNCATEGORIZED"


ATEX Announces Closing of Strategic Investment by Agnico Eagle and Final Settlement of Credit Facility

ATEX Resources Inc. (TSX-V: ATX) is pleased to announce the closi... READ MORE

November 4, 2024

Summa Silver Announces Closing of $6.5 Million Brokered Financing

Summa Silver Corp. (TSX-V: SSVR) (OTCQX: SSVRF) (FSE: 48X) is ple... READ MORE

November 4, 2024

Search Minerals Inc. Completes $1M Convertible Note Financing with Closing of Second Tranche in the Amount of $700,000

Search Minerals Inc. (TSX-V: SMY)  is pleased to announce that i... READ MORE

November 1, 2024

NEW FOUND REPORTS POSITIVE PHASE II METALLURGICAL TEST RESULTS DEMONSTRATING 97% GOLD EXTRACTION AT ICEBERG AND ICEBERG EAST

New Found Gold Corp. (TSX-V: NFG) (NYSE-A: NFGC) is pleased to re... READ MORE

November 1, 2024

GoldHaven Enters into Definitive Agreement to Acquire BC Gold & Copper Assets

GoldHaven Resources Corp. (CSE: GOH) (OTCQB: GHVNF) (FSE: 4QS0) ... READ MORE

November 1, 2024

Copyright 2024 The Prospector News