The Prospector News

Silver Tiger Metals – Visually Unpacking The El Tigre Project Underground PEA

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Silver Tiger Metals – Visually Unpacking The El Tigre Project Underground PEA

 

 

Glenn Jessome, President & CEO of Silver Tiger Metals (TSX-V:SLVR) (OTCQX:SLVTF), joins me for a special video segment which visually unpacks the key metrics, maps, and forward-looking plan for the Preliminary Economic Assessment for the underground mining second phase of the El Tigre Project. We also review what the combined El Tigre Silver-Gold Project in Sonora, Mexico looks like on a valuation standpoint, when one sees the first phase surface mining stockwork zone in tandem with the underground second phase.

 

The bolt-on PEA is centered on the underground mining economics of the high-grade El Tigre, Sulphide, Black Shale and Seitz Kelly zones. The PEA mine design can be constructed independently of the Stockwork Zone development and is focused on the underground Mineral Resource. Prospective areas exist outside of the areas defined by the PEA and PFS with the historic “El Tigre North Mine” Mineral Resource located 700 metres to the North.

 

Highlights of the PEA , with a base case silver price of $38/oz and gold price of $3,200/oz are as follows (all figures in US dollars unless otherwise stated):

• After-Tax net present value (using a discount rate of 5%) of $304 million with an After-Tax IRR of 42.8% and Payback Period of 2.6 years (Base Case);

• 15-year UG mine life with 3-year historical tailings processing recovering a total of 38 million payable silver equivalent ounces or 453 thousand gold equivalent ounces, consisting of 34 million silver ounces and 130 thousand gold ounces;

• Total Project undiscounted after-tax cash flow of $496 million;

• Initial capital costs of $83.5 million, including $10.9 million in contingency costs, over an expected 18-month build, and sustaining capital costs of $213 million over the life of mine;

• The 2026 PEA mine plan is designed as stand-alone to the PFS, with a potential overlap of initial capital cost of $17M (e.g., grid power, offices);

• Average LOM operating cash costs of $1,351/oz AuEq, and all in sustaining costs of $2,019/oz AuEq or Average LOM operating cash costs of $16.05/oz AgEq, and AISC of $23.98/oz AgEq;

• Average annual production of approximately 2.3 million AgEq oz or 27.8 thousand AuEq oz, consisting of 2.1 million silver ounces and 8.0 thousand gold ounces (refer to Table 10 footnotes for conversion to Eq ozs); and

• PEA Study of the Southern Veins does not include the 38 million ounces AgEq contained in the Northern Veins (see details in updated Mineral Resource Estimate).

 

We also go on to unpack all the #exploration upside still at surface, in the underground, and along the district-scale mineralized trend of a number of historic past-producing mines that will have drill programs for many years into the future.

If you have any follow up questions for Glenn regarding Silver Tiger Metals, then please email them into me at Shad@kereport.com.

 

• In full disclosure, Shad is a shareholder of Silver Tiger Metals at the time of this recording, and may choose to buy or sell shares at any time.

 

Click below to follow the latest news from Silver Tiger Metals: https://silvertigermetals.com/news/2026/

Posted January 23, 2026

Share this news article

MORE or "UNCATEGORIZED"


Brutus Mining Announces Closing of $3.0 Million Private Placement Financings

Brutus Mining Inc. (CSE: BRU) (FSE: ZI3) is pleased to announce that it has closed its non-brokered ... READ MORE

October 14, 2026

Jaguar Uranium Announces Maiden Mineral Resource Estimate at Laguna Salada in Argentina

Jaguar Uranium Corp. (NYSE American: JAGU) is pleased to announce an independent Mineral Resource E... READ MORE

October 14, 2026

Auro Intersects 572m Grading 0.60 g/t Gold and 0.1% Copper at the Santa Barbara Gold-Copper Project, Ecuador

Auro Metals Inc. (TSX-V: AURO) (OTCQB: AURFF), is pleased to announce the assay results of the fina... READ MORE

October 14, 2026

Endeavour Silver Restores Guanaceví Mill to Full Capacity Following Trunnion Replacement

Endeavour Silver Corp. (NYSE: EXK) (TSX: EDR) is pleased to announce that repairs to the primary bal... READ MORE

October 14, 2026

Scorpio Gold Drills 2.94 g/t Gold over 36.42 Metres from 169.62 Metres at the Goldwedge Target at Manhattan

Scorpio Gold Corp. (NASDAQ: SGLD) (TSX-V: SGLD) (OTCQB: SRCRF) (FSE: RY9) is pleased to announce re... READ MORE

October 14, 2026

Copyright 2026 The Prospector News