Scottie Resources Corp. (TSX-V: SCOT) (OTCQB: SCTSF) (FSE: SR80) is pleased to report additional high-grade gold intercepts from its 2026 drilling at the Blueberry Contact Zone within the Scottie Gold Mine Project. The road-accessible Scottie Gold Mine Project, which includes the 100% owned historic mine and adjacent Blueberry Contact Zone, is located 35 kilometres north of Stewart, British Columbia.
This latest 2026 drill results reinforce the strength and growth potential of Scottie’s gold system confirming broad high-grade mineralisation across the Lemoffe, Blueberry, Fifi, and Road vein systems. High-grade infill intercepts at Lemoffe 1 and Lemoffe 4 strengthen confidence in the existing Preliminary Economic Assessment mine plan, while extensions Blueberry 5 and Fifi 2 highlight significant resource expansion potential beyond the currently defined mineralized envelope.
The 2026 drilling program at the Scottie Gold Mine Project has concluded, with 61,578 metres drilled across 227 holes and most of assay results still outstanding. Results from the program will inform the Company’s updated Mineral Resource Estimate and Feasibility Study, both planned for the early first half of 2027. Figures 1-8 illustrate the reported drilling relative to the modelled vein zones.
Investors are encouraged to visit our website www.scottieresources.com to view the interactive 3D model showing the distribution of these released holes relative to modeled geology and prior drilling results.
Highlights
“These latest results demonstrate the strong combination of grade, width and continuity at Lemoffe, reinforcing confidence in the existing mine plan and supporting conversion of Inferred resources ahead of the Feasibility study,” commented Dr. Thomas Mumford, President and CEO. “Equally encouraging are high-potential grade intercepts beyond the current mine design, highlighting further resource growth potential. With a substantial portion of our 2026 drill results still pending, we see significant opportunity to further enhance the mine’s economics in the Feasibility study.”
Table 1: Selected drill assay results (uncut) from the Blueberry Contact Zone
| Drill Hole | From (m) | To (m) | Length (m)1 | Gold (g/t) | Silver (g/t) | Sub Zone |
| SR26-495 | 301.00 | 310.00 | 9.00 | 9.8 | 49 | Blueberry 5 |
| incl. | 309.00 | 310.00 | 1.00 | 62.8 | 6 | Blueberry 5 |
| and | 321.00 | 325.00 | 4.00 | 1.7 | 1 | Blueberry 5 |
| and | 401.10 | 403.10 | 2.00 | 11.6 | 14 | Fifi 2 |
| SR26-499 | 353.35 | 357.00 | 3.65 | 11.7 | 4 | Fifi 2 |
| incl. | 353.35 | 355.05 | 1.70 | 20.3 | 6 | Fifi 2 |
| SR26-502 | 20.00 | 24.00 | 4.00 | 7.3 | 7 | Road 1 |
| incl. | 20.00 | 21.00 | 1.00 | 12.0 | 13 | Road 1 |
| and | 238.00 | 241.00 | 3.00 | 1.3 | – | Road 1 |
| and | 250.00 | 253.00 | 3.00 | 19.9 | – | Blueberry 5 |
| SR26-513 | 96.00 | 104.00 | 8.00 | 14.4 | 30 | Lemoffe 1 |
| incl. | 99.00 | 102.75 | 3.75 | 24.1 | 48 | Lemoffe 1 |
| and | 174.00 | 180.00 | 6.00 | 2.1 | 2 | Lemoffe 4 |
| SR26-518 | 51.90 | 58.95 | 7.05 | 2.2 | 9 | Lemoffe 1 |
| and | 129.00 | 130.00 | 1.00 | 1.3 | 3 | ‘Orphan’ |
| and | 135.00 | 136.00 | 1.00 | 2.5 | 6 | Lemoffe 1 |
| and | 230.85 | 232.30 | 1.45 | 1.3 | 1 | ‘Orphan’ |
| and | 263.00 | 264.00 | 1.00 | 5.0 | 23 | ‘Orphan’ |
| SR26-521 | 48.25 | 49.65 | 1.40 | 2.2 | 60 | Bend |
| SR26-539 | 244.70 | 246.80 | 2.10 | 2.5 | 52 | Lemoffe 4 |
| and | 271.00 | 292.20 | 21.20 | 6.0 | 2 | Lemoffe 4 |
| incl. | 274.00 | 277.35 | 3.35 | 18.9 | 3 | Lemoffe 4 |
| incl. | 284.80 | 292.20 | 7.40 | 6.4 | 5 | Lemoffe 4 |
| SR26-548 | 50.90 | 56.00 | 5.1 | 9.3 | 5 | Blueberry 2 |
| incl. | 50.90 | 52.00 | 1.1 | 31.2 | 16 | Blueberry 2 |
| SR26-549 | 94.35 | 95.35 | 1.00 | 1.3 | 30 | ‘Orphan’ |
| and | 171.00 | 176.85 | 5.85 | 5.7 | 8 | Lemoffe 3 |
| incl. | 173.40 | 174.85 | 1.45 | 11.3 | 13 | Lemoffe 3 |
| SR26-558 | 58.00 | 59.25 | 1.25 | 6.9 | 3 | ‘Orphan’ |
| and | 67.00 | 68.25 | 1.25 | 6.3 | 8 | ‘Orphan’ |
| and | 78.00 | 80.00 | 2.00 | 8.5 | 4 | Lemoffe 1 |
| 1Core Length; true width of the intervals has not yet been established by drilling but are estimated to be 70% to 100% of core length based on core angle intercepts (Figure 1) | ||||||
The project’s current Mineral Resource Estimate, announced on May 7, 2025, comprises an Inferred Mineral Resource of 3.6 million tonnes grading 6.1 g/t gold, containing 703,000 ounces of gold (see NR dated May 7, 2025; Bird, S., June 20, 2025, Scottie Gold Mine Project, SEDAR+). The current MRE does not incorporate approximately 27,000 metres of diamond drilling completed in 2025 or the more than 60,000 metres completed during the 2026 program. Results from these programs will inform an updated Mineral Resource Estimate and Feasibility Study, both planned for the first half of 2027.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11118/322451_86ed1ca91456a946_002full.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11118/322451_86ed1ca91456a946_003full.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11118/322451_86ed1ca91456a946_004full.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11118/322451_86ed1ca91456a946_005full.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11118/322451_86ed1ca91456a946_006full.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11118/322451_86ed1ca91456a946_007full.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11118/322451_86ed1ca91456a946_008full.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11118/322451_86ed1ca91456a946_009full.jpg
Quality Assurance and Control
Results from samples taken during the 2026 field season were analyzed at SGS Minerals in Burnaby, BC. The sampling program is undertaken under the direction of Lyle Hansen. The majority of drill core is NQ in diameter, with select holes of HQ size primarily taken for geomechanical purposes. Prior to sampling drill core is cut in half lengthwise, with half sent for assay and the remaining half kept in Stewart, BC. Standards, blanks, and duplicate samples were taken at intervals and frequencies that meet or exceed industry best practices. A secure chain of custody is maintained in transporting and storing all samples. Gold is assayed using a fire assay with atomic absorption spectrometry and gravimetric finish when required (+9 g/t gold). Analysis by four acid digestion with multi-element ICP-AES analysis is conducted on all samples with silver and base metal over-limits being re-analyzed by emission spectrometry.
Lyle Hansen, P.Geo., Resource Geologist for Scottie Resources Corp., is non-independent and a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects and has reviewed and approved the scientific and technical information contained in this news release.
ABOUT SCOTTIE RESOURCES CORP.
Scottie Resources holds 100% interest in the Scottie Gold Mine Property, which includes the high-grade, past-producing Scottie Gold Mine and the adjacent Blueberry Contact Zone. The Company also owns a 100% interest in the Georgia Project, host to the past-producing Georgia River Mine, as well as the Cambria, Sulu, and Tide North properties. In total, Scottie controls approximately 58,500 hectares of highly prospective mineral claims within the Stewart Mining Camp in British Columbia’s Golden Triangle-one of the world’s most prolific mineralised districts.
Scottie’s current resource estimate on the Scottie Gold Mine Project includes a total of 703,000 gold ounces at an average grade of 6.1 g/t (Inferred category) in 3.6 million tonnes, highlighting the development potential for a significant near-surface, high-grade deposit. The Company’s strategy is to continue expanding this resource and to define additional mineralisation around past-producing mines through systematic drilling and surface exploration.
The Company has recently completed a PEA for the Scottie Gold Mine (Bird et al., October 28, 2025, Scottie Gold Mine Project, SEDAR+). The PEA outlines a robust ore sorting and Direct-Ship Ore development scenario with strong economics and significant upside through a potential toll-milling option utilizing excess capacity at the nearby Premier mill. The base case DSO project delivers an after-tax NPV(5%) of $215.8-$668.3 million at gold prices of US$2,600-$4,200/oz, respectively. Under the toll-milling scenario, project economics improve substantially, with an after-tax NPV(5%) of $380-$832 million (no agreement currently in place). The PEA estimates initial capital costs of $129 million, average annual production of ~65,400 oz gold over seven years, and a payback period of 1.7 years for the after-tax DSO case-reduced to just 0.9 years under the toll-milling opportunity at US$2,600/oz.
Additional Information
Brad Rourke
Executive Chairman
+1 250 877 9902
brad@scottieresources.com
PMET Resources Inc. (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (FSE: R9GA) is pleased to announce an upda... READ MORE
West Red Lake Gold Mines Ltd. (TSX-V: WRLG) (OTCQX: WRLGF) is pleased to announce the results of an ... READ MORE
Independence Gold Corp. (TSX-V: IGO) (OTCQB: IEGCF) (FSE: 625) is pleased to announce additional gol... READ MORE
Lodestar Metals Corp. (TSX-V: LSTR) (OTCQB: SVTNF) (FSE: PR90), an exploration company focused on go... READ MORE
Northmin Corporation (TSX-V: NMB) is pleased to announce additional assay results from three drill h... READ MORE