The Prospector News

Sabre Gold Drills 74.1 g/t Gold

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Sabre Gold Drills 74.1 g/t Gold

 

 

 

 

Sabre Gold Mines Corp. (TSX: SGLD) (OTCQB: SGLDF) is pleased to announce continued positive underground drilling results at its 100% owned Copperstone gold project located in Arizona, United States.

 

Mike Maslowski, Vice President of Technical Services and Exploration of Sabre Gold stated: “Results from what was known as the northern edge of the D zone continue to return high grade gold intercepts. The gold grades and continuity of the intercepts indicates the D Zone may extend further north. We are planning future underground development to establish additional drill stations to the north to test for the extension of this zone.”

 

Drilling Highlights Include:

  • RC P2F95                10.7 m at 14.3 g/t includes 1.5 m at 74.1 g/t
  • RC P2F61                3.0 m at 12.0 g/t includes 1.5 m at 19.6 g/t
  • RC P2E50                1.5 m at 17.1 g/t
  • RC P2F64                1.5 m at 9.5 g/t

 

Assay results for the underground reverse circulation (“RC”) drill program have been received on 80 out of the 83 RC holes sampled and submitted with further assays results pending. Holes were drilled from eight drill stations targeting the D zone and two stations targeting the C Zone.

 

Results reported in this release are from holes drilled along the known northern edge of the D Zone. Intercept values from this round of assays match the earlier results and continue to be high grade and carry across the modeled geologic zone. Drill station location and drill cross sections showing the drill holes follow in this release.

 

Table 1: Underground RC Drilling

 

Drill Hole From
(meters)
To
(meters)
Length
Interval
Au
Gram/tonne
True
Thickness
2
P2F95
includes
15.2
22.9
25.9
24.4
10.7
1.5
14.3
74.1
5.5
0.8
P2F61
includes
7.6
9.1
10.6
10.6
3.0
1.5
12.0
19.6
2.9
1.4
P2E50 15.2 16.7 1.5 17.1 1.2
P2F64 9.1 10.6 1.5 9.5 1.2

 

(1) Au grades herein are reported as uncapped values.
(2) Estimated perpendicular distance between footwall and hanging wall of the mineralized interval.

 

A photo accompanying this announcement is available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/4ca68fba-35b4-4058-ae35-0f92f5546d7c

 

The technical information in this news release has been reviewed and approved by Michael Maslowski, CPG, a qualified person as defined by National Instrument 43-101 and is employed by the company as its Vice President, Technical Services & Exploration.

 

Quality Assurance and Quality Control Statement

 

Procedures have been implemented to assure Quality Assurance Quality Control of drill hole assaying being done at an ISO Accredited assay laboratory.  Drill hole samples to be assayed are securely stored for shipment, with chain of custody documentation through delivery. Mineralized commercial reference standards or blank standards are inserted approximately every 20th sample in sequence and results are assessed to ascertain acceptable limits for analytical variance.  Duplicate samples will also be taken as a further check in lab precision and accuracy. All results will be analyzed for consistency and corrective actions taken, if needed.

 

ABOUT SABRE GOLD MINES CORP

 

Sabre Gold is a diversified, multi-asset near-term gold producer in North America which holds 100-per-cent ownership of both the fully permitted Copperstone gold mine located in Arizona, United States, and the Brewery Creek gold mine located in Yukon, Canada, both of which are former producers. Management intends to restart production at Copperstone followed by Brewery Creek in the near term. Sabre Gold also holds other investments and projects at varying stages of development.

 

Sabre Gold’s two advanced projects have approximately 1.5 million ounces gold in the Measured and Indicated categories, and approximately 1.2 million ounces gold in the Inferred category. Additionally, both Copperstone and Brewery Creek have considerable exploration upside with a combined land package of over 230 square kilometers that will be further drill tested with high-priority targets currently identified. Sabre Gold is led by an experienced team of mining professionals with backgrounds in exploration, mine building and operations.

 

Posted March 24, 2022

Share this news article

MORE or "UNCATEGORIZED"


Ascot Announces Closing of C$34 Million Bought Deal Financing

Ascot Resources Ltd. (TSX: AOT) (OTCQX: AOTVF) is pleased to anno... READ MORE

July 25, 2024

RUA GOLD Closes C$8 Million Brokered Offering and Announces Commencement of Trading on the TSX Venture Exchange

Highlights Closing the fully subscribed brokered offering for C$8... READ MORE

July 25, 2024

Mosaic Acquires 100% of the Amanda Project

Mosaic Minerals Corporation (CSE: MOC) announces that it has sign... READ MORE

July 25, 2024

First Phosphate Confirms Significant High-Quality Igneous Phosphate Deposit at Its Bégin-Lamarche Project in the Saguenay-Lac-St-Jean Region, Quebec au Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is ple... READ MORE

July 25, 2024

PROSPECT RIDGE ANNOUNCES FINAL CLOSING OF ITS OVERSUBSCRIBED PRIVATE PLACEMENT

Prospect Ridge Resources Corp.  (CSE: PRR) (OTC: PRRSF) (FRA: OE... READ MORE

July 25, 2024

Copyright 2024 The Prospector News