The Prospector News

Quiulacocha Tailings 40-Hole Drill Campaign: Full Speed Ahead !

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Quiulacocha Tailings 40-Hole Drill Campaign: Full Speed Ahead !

 

 

 

 

 

We are excited to report that Cerro de Pasco Resources Inc. (CDPR) is making significant progress in our Quiulacocha Tailings 40-Hole Drill Campaign. The first batch of drill samples has been safely transported to Lima for geochemical testing. Initial results expected soon will reveal metal concentrations and for the first time involve sampling at foundation depth using 60-element geochemical assays.

 

First drill samples from Quiulacocha Tailings ready for shipment to Bureau Veritas

 

To support our drilling program, we are pleased to introduce a Sonic Drill, which provides continuous, high-quality samples with minimal disturbance and no water usage, reducing environmental impact, enhancing resource recovery, and improving data quality.

 

We remain on track to complete the 40-hole campaign during this dry season, lasting until the end of October, with spirits high as we advance towards our goal!

 

In the upcoming phase, to prevent oxidation and preserve microstructural integrity, samples will be stored and transported to Lima in freezer containers, preventing lab delays and maintaining momentum.

 

 

Upon arrival in Lima, samples will be dried and assayed at the Inspectorate Services Lab (Bureau Veritas). Once geochemical and mineralogical testing is completed, select samples will be blended into representative composites and sent to Bureau Veritas Antofagasta (Chile) for advanced metallurgical testing.

 

 

Meanwhile, CDPR has successfully concluded Phase 1 of our geophysical studies, covering the dry area of the Quiulacocha Tailings, with exciting findings: depth readings range from 20 to over 40 meters in certain areas.

 

3D view of the Quiulacocha TSF, the drilling locations (red dots), the El Metalurgista concession (magenta line), and the geophysical profiles acquired and interpreted to build the 3D solid of the TSF foundation

 

Our aim is to collect over 1,000 samples offering a detailed overview of the project’s potential. We look forward to keeping you in the loop as we progress!

Posted September 27, 2024

Share this news article

MORE or "UNCATEGORIZED"


Mayfair Completes Strategic Investment with Macquarie

Mayfair Gold Corp. (TSX-V: MFG) (NYSE American: MINE) is pleased... READ MORE

October 15, 2026

Silver North Intersects 4.41 metres of 1,669 g/t Silver, 0.34 g/t Gold, 3.33% Lead and 2.00% Zinc in Step Out Drilling at the Haldane Silver Property, Yukon

Hosted within 12.16 m (10.67 m estimated true width) intersection... READ MORE

October 15, 2026

Brutus Mining Announces Closing of $3.0 Million Private Placement Financings

Brutus Mining Inc. (CSE: BRU) (FSE: ZI3) is pleased to announce that it has closed its non-brokered ... READ MORE

October 14, 2026

Jaguar Uranium Announces Maiden Mineral Resource Estimate at Laguna Salada in Argentina

Jaguar Uranium Corp. (NYSE American: JAGU) is pleased to announce an independent Mineral Resource E... READ MORE

October 14, 2026

Auro Intersects 572m Grading 0.60 g/t Gold and 0.1% Copper at the Santa Barbara Gold-Copper Project, Ecuador

Auro Metals Inc. (TSX-V: AURO) (OTCQB: AURFF), is pleased to announce the assay results of the fina... READ MORE

October 14, 2026

Copyright 2026 The Prospector News