The Prospector News

Prospector News Podcast – Guy Goulet “We Own the Mineral Rights on 200 Million Tonnes of Tailings in Peru”

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Prospector News Podcast – Guy Goulet “We Own the Mineral Rights on 200 Million Tonnes of Tailings in Peru”

 

 

 

 

 

Michael Fox of the prospector News is joined by Guy Goulet the President and CEO of Cerro de Pasco Resources (CSE:CDPR) (OTC Pink:GPPRF). We discuss the history of the Cerro de Pasco region as the premier mining district in Peru for over 400 years then move to the history of the actual Cerro de Pasco Mine. Operations that mined more quickly than they processed the ore has led to opportunity for vast amounts of leftover ore in the massive above ground tailings on site.

 

On May 28th the company was granted its long-awaited access permit for its site. (Press Release Here) This was the starting gun that the company was waiting for. They will now move very quickly to prove a NI43101 resource in the tailings (Drills turning in the next few weeks) followed up by a new PEA and Feasibility Study. Drilling is to determine not only the amount of silver that was left behind, but the presence and amounts of several Rare Earth Critical Minerals also shunted off in the past as waste.

 

Production on the tailings is anticipated to begin in 2026

 

About Cerro de Pasco Resources

 

Cerro de Pasco Resources is a mining company, with the goal to become the next mid-tier producer in Peru. CDPR is focused on the development of its principal 100% owned asset, the El Metalurgista mining concession, comprising mineral tailings and stockpiles extracted from the Cerro de Pasco open pit mine in Central Peru. The company’s approach at El Metalurgista entails the reprocessing and environmental remediation of mining waste and the creation of numerous opportunities in a circular economy. CDPR is also focused on mining, development, and exploration of its wholly owned 6,000-hectare Santander Mine in the highly prospective Antamina-Yauricocha Skarn Corridor, located 215 km from Lima. CDPR is founded on clear objectives, to engender long-term economic sustainability and benefit for the local population, from an economic, social and health point of view.

 

Cerro de Pasco Resources 

Posted June 17, 2024

Share this news article

MORE or "UNCATEGORIZED"


NorthWest Reports Results from Two Holes at Its Kwanika Property Highlighted by 26 Metres of 0.72% Copper and 1.30 g/t Gold (1.91% CuEq) from 268 Metres

NorthWest Copper Corp. (TSX-V: NWST) is pleased to announce addit... READ MORE

November 27, 2025

GoGold Announces Closing of C$144 Million Bought Deal Financing

GoGold Resources Inc. (TSX: GGD) is pleased to announce that it h... READ MORE

November 27, 2025

GFG Drills 1.05 g/t Au over 71.0 m including 7.51 g/t Au over 3.0 m at Aljo and Initiates Aggressive Regional Exploration Program at Goldarm

GFG Resources Inc. (TSX-V: GFG) (OTCQB: GFGSF) reports initial as... READ MORE

November 27, 2025

SILVER MOUNTAIN REPORTS HIGH GRADE SILVER IN UNDERGROUND CHANNEL SAMPLING PROGRAM AND PROVIDES UPDATE ON STOCKPILING AT ITS RELIQUIAS PROJECT, PERU

Key Highlights – Channel sampling at Reliquias Ayayay ve... READ MORE

November 27, 2025

Arizona Copper and Gold Ltd. and Core Nickel Corp. Announce Closing of Concurrent Financings

Arizona Copper and Gold Ltd. and Core Nickel Corp. (TSX-V: CNCO) ... READ MORE

November 27, 2025

Copyright 2025 The Prospector News