The Prospector News

Power Ore Intersects 2.5% Copper Equivalent Over 74 Metres

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Power Ore Intersects 2.5% Copper Equivalent Over 74 Metres

 

 

 

 

 

PowerOre Inc. (TSX-V: PORE) is pleased to announce the latest results from its spring 2019 drill program at the Opemiska Copper Mine Complex in the Chibougamau District of Quebec, including hole OPM-19-18 which intersected 2.54% copper equivalent over 74 metres beginning at 28 metres downhole. Included in this intersection is 4.15% copper equivalent over 25 metres and 5.4% copper equivalent over 14.5 metres.

 

Click here for Map of Drill Hole Locations. Full details with a breakdown of Copper Equivalent inputs and formula is listed in the table.

 

 

Hole ID Grade Interval

(m)

From

(m)

To

(m)

Copper

Eq* (%)

Copper

(%)

Gold

(gpt)

Silver

(gpt)

Cobalt

(%)

Zinc

(%)

OPM-19-18 2.54 2.13 0.41 7.61 0.006 0.013 74.0 28.0 102.0
Including 4.15 3.25 0.96 11.3 0.01 0.02 25.0 38.0 63.0
and 5.40 4.95 0.33 18.0 0.008 0.024 14.5 73.0 87.5
                   
OPM-19-16 0.56 0.35 0.21 2.48 0.004 0.009 97.0 55.0 152.0
Including 0.72 0.41 0.34 3.05 0.004 0.011 50.0 55.00 105.0
and 1.39 1.13 0.24 6.48 0.003 0.008 10.0 141.0 151.0
                   
OPM-19-15 0.39 0.28 0.10 0.78 0.004 0.007 16.0 19.0 35.0
                   
OPM-19-17 1.13 0.81 0.34 3.20 0.004 0.008 2.00 18.00 20.00
 
*Copper Equivalent (“Cu Eq.”) grade including copper, gold, silver, cobalt and zinc based on 100% recoveries is calculated using the following equation: Cu Eq. = [(Cu % x 20 x Cu price) + (Au grade / 34.2857 x Au price) + (Ag grade / 34.2857 x Ag price) + (Co % x 20 x Co price) + (Zn % x 20 x Zn price)] / (20 x Cu price). We used Cu, Au, Ag, Co and Zn price of US$2.65, US$1,400 and US$14.75, US$15.00 and US$1.19 respectively. Note we have adjusted the gold price to $1,400 from $1,325 previously, to reflect recent Gold price activity.

 

 

Hole 18 yielded the richest intersection of Power Ore’s Spring 2019 drill program and yielded 2.54% CuEq over 74 metres including 4.15% CuEq over 25 metres and 5.40% over 14.5 metres. Hole 18 was drilled to 104 metres, and while intersecting Vein #20 towards the end of the hole, was mineralized almost throughout, starting from 28 metres. and was drilled towards Vein #20 located north of Vein #3 and the Glory Hole. 

 

Hole 16 was drilled to 152 metres in between Vein #3 and the Glory Hole and Vein #2. The hole was drilled towards the hinge of the anticline of the rhyolite-pyroxenite/gabbro contact and yielded 0.56% CuEq over 97 metres, including 0.72% CuEq over 50 metres, and 1.39% CuEq over 10 metres.

 

Hole 15 is a 38 metre hole which was drilled towards Vein #1 and ended in a stope. Drilling intersected 0.39% CuEq over 16 metres.

 

Hole 17 was drilled 80 metres west of Hole 18 towards the Rhyolite-Pyroxenite/Gabbro contact to a depth of 95.3 metres. A single sample composite yielded 1.13% CuEq over 2 metres starting at 18 metres.

 

The above holes are the fifth batch of results encompassing drill holes 15 to 18 of a 23 drill hole, 3,364 metre drill campaign. Power Ore will report subsequent results as it receives them.

 

Orientation of Drilling and True Widths of Mineralization

 

Field based and drill hole evidence clearly indicate that several orientations of veins are present on the Opemiska Property but that around the Springer Mine the veins are predominantly EW with a steep dip to the north.  South directed drill holes are intersecting those veins near perpendicular.  However in the disseminated mineralization we find veins with various core angles suggesting that other directions may be important.  As such, in the disseminated mineralization the true width of mineralized intersections is estimated to be the same as the drill core width even though the mineralization may have an overall envelope that is different.

 

QP Statement

 

The technical information contained in this news release has been reviewed and approved by Charles Beaudry, P.Geo and géo., Director and Vice President Exploration for Power Ore, who is a Qualified Person as defined in “National Instrument 43-101, Standards of Disclosure for Mineral Projects.”  For the exploration undertaken by Power Ore all assay batches are accompanied by rigorous Quality Assurance procedures that include insertion of standards and blanks and verification assays in a secondary laboratory.  Quality Control results, including the laboratory’s own control samples, are evaluated immediately on reception of batch results and corrections implemented immediately if necessary.  All drill collars are surveyed and positioned in UTM  coordinates.  Downhole deviations surveys are done with a Reflex instrument at 30m intervals.  A systematic density measurement program using two methods was implemented to measure density of all rock types.  A specific susceptibility measurement protocol was also implemented to better estimate the relative abundance of magnetite in the variably magnetic rocks of the Ventures Sill.

 

About Opemiska Copper Mine Complex

 

The Opemiska Copper Complex is located adjacent to the town of Chapais, Quebec within the Chibougamau region. Opemiska is also within the Abitibi Greenstone belt and within the boundaries of the Province of Quebec’s Plan Nord which promotes and funds infrastructure and development of natural resource projects. The project consists of 11 mining claims and covers the past producing Springer & Perry mines which were owned and operated by Falconbridge. The project has excellent in place infrastructure including a powerstation and direct access to Highway 113 and the Canadian National Railway.

 

Opemiska was mined by Falconbridge as a high-grade underground mining operation and was in production for over 35 years prior to Ex-In acquiring the property in 1993.

 

 

Table 1:  Summary statistics of spring 2019 diamond drilling program on Opemiska Project.  Note that collars have not yet been surveyed.

 

 

 
                   
HOLE_ID UTEM_EAST UTM_NORTH AZIMUTH DIP DATE_STARTED DATE_ENDED OVERBURDEN LENGTH_M CUMULATIVE_M
                   
OPM-19-01 509620.0 5515006.0 180 -48 May 16/2019 May17/2019 1.3 139.1 139.1
OPM-19-02 509668.0 5515069.0 180 -50 May 17/2019 May 18/2019 2.0 107.5 246.6
OPM-19-03 509510.0 5514950.0 180 -60 May 18/2019 May 19/2019 2.6 115.4 362.0
OPM-19-04 509880.0 5514959.0 180 -47 May 19/2019 May 20/2019 3.0 193.7 555.7
OPM-19-05 509805.0 5514939.0 180 -46 May 20/2019 May 21/2019 2.5 98.5 654.2
OPM-19-06 509830.0 5515009.0 180 -50 May 21/ 2019 May 23/2019 2.5 226.5 880.7
OPM-19-07 509778.0 5514820.0 180 -48 May 23/ 2019 May 24/ 2019 2.3 139.6 1020.3
OPM-19-08 509957.0 5514963.0 180 -45 May 24/ 2019 May 25/2019 2.0 188.0 1208.3
OPM-19-09 510066.0 5514786.0 180 -65 May 24/ 2019 May 28 /2019 8.0 320.6 1528.9
OPM-19-10 509975.0 5514896.0 180 -49 May 28/ 2019 May 28/2019 3.0 51.1 1580.0
OPM-19-11 509592.0 5514808.0 360 -60 May 29/2019 May 29/2019 12.5 37.9 1617.9
OPM-19-12 509592.0 5514808.0 225 -45 May 29/2019 May 31/2019 11.5 122.6 1740.5
OPM-19-13 509592.0 5514808.0 300 -45 May 31/2019 June 01/ 2019 11.8 195.7 1936.2
OPM-19-14 509620.5 5515005.8 230 -45 June 01/2019 June 03/ 2016 2.7 173.0 2109.2
OPM-19-15 509620.5 5515005.8 315 -45 June 03/ 2019 June 03/ 2019 17.7 38.0 2147.2
OPM-19-16 509640.0 5514904.0 315 -45 June 04/ 2019 June 05/2019 2.5 160.5 2307.7
OPM-19-17 509668.0 5515068.8 315 -45 June 05/2019 June 05/2019 2.3 100.9 2408.6
OPM-19-18 509753.1 5515065.4 315 -45 June 06/2019 June 07/2019 2.8 146.9 2555.5
OPM-19-19 509753.0 5515040.0 180 -45 June 07/ 2019 June 08/2019 1.2 158.3 2713.8
OPM-19-20 509790.0 5515124.0 315 -45 June 08/2019 June 09/ 2019 6.7 149.0 2862.8
OPM-19-21 509671.0 5514936.0 180 -60 June 09/2019 June 10/2019 1.4 113.6 2976.4
OPM-19-22 509835.0 5515145.0 315 -45 June 10/2019 June 11/2019 1.7 150.0 3126.4
OPM-19-23 509974.0 5515286.0 315 -45 June 11/2019 June 13/2019 5.7 223.6 3363.9

 

 

Posted August 12, 2019

Share this news article

MORE or "UNCATEGORIZED"


Elevation Gold Reports Financial Results for Year Ended December 31, 2023, including $66.4M in Total Revenue

Elevation Gold Mining Corporation (TSX-V: ELVT) (OTCQB: EVGDF) i... READ MORE

April 18, 2024

Reunion Gold Announces the Signing of a Mineral Agreement With the Government of Guyana for Its Oko West Project

Reunion Gold Corporation (TSX-V: RGD; OTCQX: RGDFF) is pleased to announ... READ MORE

April 18, 2024

Drilling Confirms 4 km of Favourable Corridor at Lynx Gold Trend

Puma Exploration Inc. (TSX-V: PUMA) (OTCQB: PUMXF) is thrilled to... READ MORE

April 18, 2024

Grid Metals Intersects 7 m at 1.28% Li2O at over 125 m Below the Previously Deepest Drill Holes at Donner Lake; Provides Project Update

Grid Metals Corp. (TSX-V:GRDM) (OTCQB:MSMGF) is pleased to announ... READ MORE

April 18, 2024

Azimut and SOQUEM Cut Thick Spodumene Pegmatites at Galinée, James Bay Region, Quebec

Azimut Exploration Inc. (TSX-V: AZM) (OTCQX: AZMTF) is pleased ... READ MORE

April 18, 2024

Copyright 2024 The Prospector News