The Prospector News

Power Nickel Announces Broad Nickel Intercepts From Remaining Drill Holes at Nisk

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Power Nickel Announces Broad Nickel Intercepts From Remaining Drill Holes at Nisk

 

 

 

 

 

Highlights

  • 0.60% Ni, 0.39% Cu, 0.50 g/t Pd, and 0.11 g/t Pt over 31.86m in PN-23-035, including
    • 1.18 % Ni, 0.8 % Cu, 1.14 g/t Pd, and 0.28 g/t Pt over 8.82m
  • 0.71% Ni, 0.37% Cu, and 0.85 g/t Pd over 10.05m in PN-23-033, including
    • 1.25 % Ni, 0.36 % Cu, 1.41 g/t Pd, and 0.12 g/t Pt over 2.95m
  • 0.49% Ni, 0.13% Cu, and 0.46 g/t Pd over 8.08m in PN-23-034A, including

 

Power Nickel Inc. (TSX-V:PNPN), (OTCBB:PNPNF), (Frankfurt:IVVI) is pleased to announce the latest results from drill holes PN-23-029 to 035. These eight holes (Table 1) were drilled to test distal targets east (PN-23-030/-031) and west (PN-23-029) of the Main Nisk deposit as well as to expand on high-grade intersections at Nisk Main (PN-23-032, -033, -034/034A, and -035; Figures 1-3).

 

Table 1: Significant results for PN-23-029 to PN-23-035.

  1.  UTM NAD83, Zone 18N.
  2. True widths are estimated to be 70% of the Interval Length.

 

*Hole abandoned due to technical issues, re-drilled as PN-23-031A see NR from May 10th

 

**Hole abandoned due to technical issues, re-drilled as PN-23-034A

 

Commented Power Nickel CEO Terry Lynch,

 

“Another strong result from our Nisk main deposit, these holes will be valuable additions to the resource calculation. This concludes an amazing drill season for us at Nisk.

 

We are very excited now to get the drill results from over 15,000 metres of drilling incorporated into our much anticipated inaugural NI 43-101 mineral resource estimate which we expect to deliver in late Q3.

 

As you read this release, we are readying the Geodes for the Ambient Noise Tomography program. This program will be conducted to assist in the identification of the next prime targets for our Nisk Project (as released earlier this year). Preliminary surveys will be conducted over our core ore zones at Nisk Main where there is a wealth of scientific data. This will enable us to correlate this exciting, advanced technology to reveal what we hope will be the identification of the next Nickel PGM Pods at Nisk.”

 

Next steps at Nisk include deploying the Ambient Noise Tomography program, completing the analysis of the recent Airborne MAG/EM survey, readying the drilling team for the July start of the funded 15,000 metre drill program, receipt of the metallurgical studies report and the publication of the inaugural NI 43-101 mineral resource estimate at Nisk.

 

Figure 1 – Long section view of Nisk Main Zone showing DDH PN-23-032 through -035.

 

Figure 2 – Vertical cross section showing DDH PN-23-033.

 

Figure 3 – Vertical cross section showing DDH PN-23-035

 

As part of its review of management and board performance a grant of 1,600,000 options has been approved according to the Company option plan. Strike price is at $.25. Options vest upon grant and expire five years from date of grant.

 

About the Nisk Project

 

The Nisk Project is in the southern portion of the Eeyo Istchee James Bay territory, Québec, the site of several mining projects improving infrastructure (Figure 4).

 

 

Figure 4 – Location of the Nisk Project with respect to the current infrastructure available in the area.

 

Power Nickel completed the acquisition of its option to acquire up to 80% of the Nisk Project from Critical Elements Lithium Corp. (TSX-V:CRE). The Nisk Project comprises a large land position (20 kilometres of strike length) with numerous high-grade Nickel intercepts (Figure 5 & 6) from completed drill programs.

 

Figure 5 – Pathway highlighting mineralized intercepts of the Main Nisk Deposit.

 

Figure 6 – Overhead view highlighting significant mineralized intercepts of the Main Nisk Deposit.

 

In addition to a successful campaign to extend and expand the resources at Nisk Main, Power Nickel has successfully tested extensions both east and west of the main zone in what could be whole new pods of mineralization. Perhaps most critical was the announcement on May 10th where Power Nickel stepped out 5 km from the main Nisk resource (Figure 7) intercepting 1 Oz/Tonne Combined Platinum and Palladium over 7.75 Metres in Wildcat hole PN-23-031A.

 

Figure 7 – Location of the Wildcat Target relative to the main Nisk deposit.

 

The existing resource estimates at the Nisk project are of historic nature and the Company’s geology team has not completed sufficient work to confirm a NI 43-101 compliant mineral resource. Therefore, caution is appropriate since these historic estimates cannot, and should not be relied on. For merely informational purposes see Table 2.

 

Table ‑2: Historical Resource Estimate figures for respective confidence categories at the NISK-1 deposit, After RSW Inc 2009: Resource Estimate for the NISK-1 Deposit, Lac Levac Property, Nemiscau, Québec.

 

 

The information regarding the NISK-1 deposit was derived from the technical report titled “Resource Estimate for the NISK-1 Deposit, Lac Levac Property, Nemiscau, Québec” dated December 2009. The key assumptions, parameters and methods used to prepare the mineral resource estimates described above are set out in the technical report.

 

Power Nickel expects to take the results from the historic drilling programs, its initial program in late 2021, the current drill program and a new metallurgical study and prepare a new 43-101 which we would expect to deliver in Q3 2023.

 

Power Nickel posts its drilling information and azimuths on www.PowerNickel.com to enable independent modeling of the ore body.

 

QAQC and SAMPLING

 

GeoVector Management Inc is the Consulting Company retained to oversee the drilling program, which includes core logging and sampling of the drill core.

 

All samples were submitted to and analyzed at ALS Global and Actlabs, independent commercial laboratories located in Val-d’Or, Québec and Ancaster, Ontario for both the sample preparation and assaying. ALS and Actlabs are commercial laboratories independent of Power Nickel with no interest in the Nisk Project. ALS and Actlabs are ISO 9001 and 17025 certified and accredited laboratories.

 

Samples submitted through ALS are run through thePREP-31 package where samples are crushed to 70% less than 2mm, riffle split off 250g, plus pulverize split to better than 85% passing 75 microns.Following this,samples are analysed using ME-ICP61a (33 element Suite; 0.4g sample; Intermediate Level Four Acid Digestion) and PGM-ICP27 (Pt, Pd, and Au; 30g fire assay and ICP-AES Finish) methods. ALS also undertake their own internal coarse and pulp duplicate analysis to ensure proper sample preparation and equipment calibration.

 

At Actlabs, samples are prepared using code RX1 whereby samples are dried, crushed (<7 kg) up to 80% passing 2mm, riffle split (250g) and pulverized to 95% passing 105 microns. Following this, samples are analyzed using 1F2 (4-acid “near total” digestion) and 1C-OES (Au-Pt-Pd; 30g fire assay + ICP-OES finish). Actlabs runs their own internal QAQC program prior to the release of results.

 

GeoVector’s QAQC program includes regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results.

 

The results presented in the current Press Release are complete. QAQC and data validation was performed on these holes and no material errors were observed.

 

Qualified Person

 

Eric Hébert, P. Geo, Ph.D. from GeoVector Management Inc, and consultant to Power Nickel, is the independent qualified person who has reviewed and approved the technical disclosure contained in this news release.

 

About Power Nickel Inc.

 

Power Nickel is a Canadian junior exploration company focusing on developing the High Grade Nisk project into Canada’s first Carbon Neutral Nickel mine.

 

On February 1, 2021, Power Nickel (then called Chilean Metals) completed the acquisition of its option to acquire up to 80% of the Nisk project from Critical Elements Lithium Corp. (CRE: TSXV)

 

The NISK property comprises a large land position (20 kilometres of strike length) with numerous high-grade intercepts. Power Nickel is focused on expanding the historical high-grade nickel-copper PGE mineralization with a series of drill programs designed to test the initial Nisk discovery zone and to explore the land package for adjacent potential Nickel deposits.[1]

 

In addition to the Nisk project Power Nickel owns significant land packages in British Colombia and Chile. Power Nickel is expected to reorganize these assets in a related public vehicle through a plan of arrangement.

 

Power Nickel announced on June 8th, 2021, that an agreement has been made to complete the 100% acquisition of its Golden Ivan project in the heart of the Golden Triangle. The Golden Triangle has reported mineral resources (past production and current resources) in total of 130 million ounces of gold, 800 million ounces of silver and 40 billion pounds of copper (Resource World). This property hosts two known mineral showings (gold ore and magee), and a portion of the past-producing Silverado mine, which was reportedly exploited between 1921 and 1939.

 

[1] The resource estimates at Nisk are historical in nature and the Company’s geology team has not completed sufficient work to confirm an NI 43-101 mineral resource. Mineral resource information is derived from the technical report titled “Resource Estimate for the NISK-1 Deposit, Lac Levac Property, Nemiscau, Québec” dated December 2009. The key assumptions, parameters, and methods used to prepare the mineral resource estimates are set out in the technical report. This report, prepared by RSW Inc in 2009, can be found on the SEDAR website.

 

These mineral showings are described to be Polymetallic veins that contain quantities of silver, lead, zinc, plus/minus gold, and plus/minus copper.

 

Power Nickel is also 100-per-cent owner of five properties comprising over 50,000 acres strategically located in the prolific iron-oxide-copper-gold belt of northern Chile. It also owns a 3-per-cent NSR royalty interest on any future production from the Copaquire copper-molybdenum deposit, that was sold to a subsidiary of Teck Resources Inc. Under the terms of the sale agreement, Teck has the right to acquire one-third of the 3-per-cent NSR for $3 million at any time. The Copaquire property borders Teck’s producing Quebrada Blanca copper mine in Chile’s first region.

 

Posted June 16, 2023

Share this news article

MORE or "UNCATEGORIZED"


Critical Metals Corp Achieves Breakthrough Tanbreez Heavy Rare Earth Results: >99% Dissolution of Eudialyte Concentrate Into 19 Ultra-High-Purity Rare Earth Products; Refinery Study Projects US$1.8–2.2b in Annual Refinery Revenue

Critical Metals Corp. (Nasdaq: CRML) a leading critical minerals ... READ MORE

September 16, 2026

Metalsource Mining Extends High Grade Mineralization at Depth as Silver Hill Exploration Enters Major Expansion Phase

Holes SH26-22 and SH26-23 return up to 930 g/t AgEq within broade... READ MORE

September 16, 2026

Pasinex Completes Sale of High-Grade Zinc Sulphide Material and Provides Pinargozu Operations Update

Pasinex Resources Limited (CSE: PSE) (FSE: PNX) a growing zinc-fo... READ MORE

September 16, 2026

Aya Gold & Silver Reports High-Grade Silver Exploration Results Near Pit and at Depth at Zgounder

Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) is pleased to... READ MORE

September 16, 2026

New Break Resources Ltd. (CSE: NBRK) (OTCQB: NBRKF) (FSE: O91) has received results from the last four holes of a ten-hole, 1,996 metre summer drilling program in the Zavitz gold zone at the Company's 100% owned Moray gold project. In total, New Break has completed 5,372 metres of drilling in 32 drillholes in 2026. Moray is located 49 km southeast of Timmins, Ontario and 32 km northwest of the Young-Davidson gold mine operated by Alamos Gold Inc. Select results from the final four of ten holes drilled in the summer drilling program are presented below in Table 1, while drillhole collar locations are detailed in Table 2 in Appendix A. Table 1 – Moray Summer 2026 Final Drill Results Hole ID Length (m) From (m) To (m) Width (1) (m) Au Grade (2) (g/t) NBR-26-29 322.0 77.3 78.8 1.5 0.42 and 138.0 139.1 1.1 0.38 and 162.5 173.3 10.8 (3) 1.61 and 227.4 229.0 1.6 1.21 and 231.5 232.1 0.6 1.72 NBR-26-30 250.0 37.0 38.0 1.0 0.30 and 102.8 103.5 0.7 0.60 and 121.5 122.5 1.0 0.36 and 124.5 125.5 1.0 0.33 and 128.5 129.0 0.5 0.90 and 131.0 132.0 1.0 0.36 and 169.8 174.0 4.2 2.65 and 178.0 179.5 1.5 0.77 and 183.5 186.6 3.1 1.22 and 190.0 190.5 0.5 1.06 and 191.5 192.5 1.0 1.48 and 196.0 200.5 4.5 2.53 and 203.5 204.0 0.5 2.15 and 206.5 212.0 5.5 1.57 NBR-26-31 274.0 169.0 170.5 1.5 0.37 and 184.5 186.0 1.5 0.51 and 197.0 200.0 3.0 0.94 and 201.5 202.0 0.5 0.50 and 203.5 210.0 6.5 (3) 3.12 NBR-26-32 352.0 73.5 74.0 0.5 0.44 and 174.0 174.6 0.6 0.52 and 194.0 195.0 1.0 0.66 and 199.8 203.3 3.5 2.29 and 227.3 228.0 0.7 0.97 (1) Intervals are drill intersections and do not necessarily represent true widths. (2) All intervals are presented using a cut-off grade of 0.3 g/t Au and internal dilution of no more than 1.0 metres at grades less than 0.3 g/t Au and assays are not capped (see QA/QC Procedures). (3) Drill core photos shown in Appendix B. Figure 1 – Newly Reported Drillholes NBR-26-29, 30 Figure 2 – Newly Reported Drillholes NBR-26-30, 31, 32 Note: The bottom of NBR-26-30 deviated southeast and is represented in both sections. Figure 1: Section B-B1 incorporates drillholes NBR-26-06, 07, 08, 25, 26, 27, 28, 29 and part of 30. Gold mineralization extends southeast into the syenite as exhibited in NBR-26-29. NBR-26-30 is identified in both sections A-A1 and B-B1 as the drillhole was collared along section A-A1 but deviated southeast, intersecting gold mineralization in the mafic volcanics in section B-B1. Figure 2: A-A1 incorporates drillholes NBR-26-03, 04, 05, 23, 24, 30, 31 and 32. NBR-26-31 exhibits gold mineralization both within the syenite (at the contact) and within a "flow breccia" within the hematite altered mafic volcanic at the contact. NBR-26-32 is typified by blocky faulted ground with lamprophyre dykes and gold mineralization in the hematite altered mafic volcanics in a brecciated quartz vein with angular syenitic fragments. William Love, Chief Executive Officer of New Break commented, "Ongoing drilling this summer in the Zavitz gold zone continues to deliver significant gold values, with gold mineralization intercepted in every drillhole. As depicted in Figures 1 and 2, gold mineralization has been encountered predominantly within the mafic volcanics. Importantly, drillholes NR-26-29 and NR-26-32, the deepest drilled to date, demonstrate that gold mineralization extends into the syenite to the southeast at the contact with the mafic volcanics." He further noted, "The intrusive-mafic volcanic contact in the Zavitz gold zone has a distinctive magnetic high. This could be reflective of the higher proportion of iron in these mafic volcanics, which is associated with the higher gold values. This same magnetic and IP signature has been identified elsewhere in areas also believed to be along the intrusive-mafic volcanic contact. Drilling these never before tested targets with the goal of identifying gold mineralization similar to that encountered in the Zavitz zone represents the potential for significantly expanding the Moray gold discovery. There is also the belief that the Zavitz zone could represent the first of a series of stacked mineralized gold zones, which would point to the potential for a much larger gold system at depth. We plan to test this through deeper drilling directly into the Zavitz zone." About the Moray Gold Project The Moray property is located in the heart of the Ontario Abitibi greenstone belt, 49 km southeast of Timmins surrounded by a number of significant gold producing companies and existing mills (see Figure 3). The Young-Davidson gold mine operated by Alamos Gold Inc., with its 8,000 tonne per day mill is the closest and within a short trucking distance of approximately 45 km by road from Moray. The understanding of gold mineralization at Moray continues to evolve with each round of drilling. The occurrence of gold mineralization extending into the syenite to the southeast of the Zavitz zone and in the deepest drillholes is noteworthy given the presence of syenite-hosted mineralization at Young-Davidison. More recent examination of the drill core also suggests that the gold mineralization discovered to date may resemble an intrusion related style of deposit like Agnico Eagle's Upper Beaver gold deposit east of Kirkland Lake, as opposed to a structurally hosted gold system. Both Young-Davidson and Upper Beaver host multi-million ounce gold deposits. Figure 3 – Moray Location Map: Surrounding Gold Producers and Upper Beaver Gold Project Technical Content and Qualified Person The scientific and technical information contained in this news release has been reviewed and approved by Peter C. Hubacheck, P. Geo, consulting geologist to New Break, and an independent Qualified Person as defined by National Instrument 43-101. Mr. Hubacheck certifies that this news release fairly and accurately reflects the technical information and data presented. New Break conducts its exploration activities in accordance with CIM Best Practices Guidelines. QA/QC Procedures QA/QC procedures were executed to ensure all work is conducted in accordance with best practices. All drill core was sawn in half with one half of the core prepared for shipment and the other half retained for future verification. All core is under watch from the drill site to the core processing facility. Drill core is BQTK size and sample intervals range from 0.5 metres to 1.0 metres in length. Commercially prepared certified reference material ("CRM") standards and blanks were inserted with each shipment at a rate of 1 QAQC sample in every 12 core samples. Samples from New Break's 2026 Moray drilling program were analyzed at Activation Laboratories in Timmins, Ontario, which is ISO 17025 certified, by 30-gram fire assay with atomic absorption finish. Any sample assaying greater than 10.0 g/t Au was re-assayed with fire assay gravimetric analysis. Grade composite intervals over core lengths are calculated using a weighted average grade with a cut-off grade of 0.3 g/t Au. Up to 1.0 m of internal dilution (consecutive interval below cut-off grade) are included within specific geologic domains and alteration assemblages, except as otherwise noted. The composites are constrained geologically by metasomatic alteration processes sourcing from the Fiset syenite intrusion and contact mafic volcanic rocks. Elevated gold values are coincident with hematite, silica, sericite and pyrite mineralization within structurally prepared brecciated corridors flanking the intrusion. Intervals are not true widths and no top cutting has been applied to the higher gold values. About New Break Resources Ltd. New Break is a Canadian mineral exploration company focused on its Moray gold project located 49 km southeast of Timmins, Ontario, in a well-established mining camp within proximity to existing infrastructure, and 32 km northwest of the Young-Davidson gold mine, operated by Alamos Gold Inc. Shareholders are also leveraged to exploration success in Nunavut, Canada, through New Break's 20% carried interest in the Sundog gold project and ownership of 6.0 million shares of Guardian Exploration Inc. (TSXV: GX). The Company is supported by a highly experienced team of mining professionals. Appendix A – Drillhole Data and Locations Table 2 – Moray Summer 2026 Drillhole Collar Locations Hole ID Length (m) UTM Easting UTM Northing UTM Elevation Azimuth (degrees) Dip (degrees) NBR-26-29 322.0 492703 5320285 363 220 -70 NBR-26-30 250.0 492708 5320329 363 220 -47 NBR-26-31 274.0 492708 5320329 363 220 -60 NBR-26-32 352.0 492708 5320329 363 220 -70 Total 1,198.0 Coordinates are reported in UTM Zone 17 North, with units in metres. Figure 4 – Zavitz Gold Zone – Surface Traces of 2025 and 2026 Drillholes. All of the drilling at Moray has been completed by Enviro North Exploration Inc. out of Sturgeon Falls, Ontario. Drilling in the Zavitz gold zone is shown in figure 4, with the 1,996 metres in 10 holes drilled this summer depicted in red, the 2,807 metres in 20 holes drilled from January to April 2026 shown in blue and the 1,817 metres in 8 holes drilled in 2025 shown in black. In total, 6,620 metres in 38 drillholes have been completed in the Zavitz gold zone, while New Break has completed a total of 5,372 metres in 32 drillholes of our planned 2026, 10,000 metre drilling program. Appendix B – Drill Core Photos From NBR-26-29 and NBR-26-31

New Break Resources Ltd. (CSE: NBRK) (OTCQB: NBRKF) (FSE: O91) ha... READ MORE

September 16, 2026

Copyright 2026 The Prospector News