The Prospector News

Power Metallic Mines – Fully Funded 100,000m Drill Program Underway at NISK Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Power Metallic Mines – Fully Funded 100,000m Drill Program Underway at NISK Project

 

 

 

 

 

Listen to the Podcast here

 

In this KE Report Company Update, we’re joined by Terry Lynch, CEO of Power Nickel Mines (TSX-V:PNPN) (OTC:PNPNF) (FRA:1VV), to discuss the company’s aggressive and fully funded 100,000-meter drill program at the polymetallic NISK Project in Quebec.

 

 

Key Highlights from the Interview:

  • Exploration Strategy: A six-rig program focused on expanding the Lion Zone at depth, exploring new polymetallic targets, and connecting a 5+ km corridor between Lion and NISK East.
  • Resource Growth Path: Early-stage modeling efforts are enabling analysts and investors to build their own interpretations of scale, while metallurgical studies are underway to confirm high recovery rates.
  • Financing & Market Volatility: Terry explains the timing behind the capital raise, recent market headwinds triggered by tariff fears, and how investor sentiment impacted the stock despite strong news flow.
  • Name Change Rationale: Rebranding from Power Nickel to Power Metallic better reflects the polymetallic nature of the discovery, which includes high grades of copper, nickel, PGEs, gold, and silver.

 

Courtesy of Power Metallic Mines via the KE Report

 

Posted May 26, 2025

Share this news article

MORE or "UNCATEGORIZED"


Falco Resources Announces Updated Feasibility Study for Horne 5 Project, Delivering After-Tax NPV5% C$3.35 Billion, IRR of 28.2% and Cash Flow of C$6.4 Billion at Base Case Gold Price of US$3,600/Oz

Falco Resources Ltd. (TSX-V:FPC) is pleased to announce the resul... READ MORE

June 17, 2026

TDG Announces Positive Results from Ongoing Metallurgical Test Work - Conventional Processing Achieves >90% Gold and Silver Recoveries At Shasta, Toodoggone District

TDG Gold Corp. (TSX-V: TDG) (OTCQX: TDGGF) is pleased to provide ... READ MORE

June 17, 2026

Talamore announces initial high grade-drill results from Supremo Extension in its 40,000-metre 2026 drill program at Coffee Gold

Extension drilling extended mineralization beyond the current pit... READ MORE

June 17, 2026

Abcourt intersects 170.9 g/t Au over 0.8 m at Sleeping Giant

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) continues its work... READ MORE

June 17, 2026

Premier American Uranium Expands and Further Defines Uranium Mineralization at Kaycee Project, Wyoming with Initial 2026 Drill Results

Premier American Uranium Inc. (TSX-V: PUR) (OTCQB: PAUIF) is plea... READ MORE

June 17, 2026

Copyright 2026 The Prospector News