The Prospector News

Power Metallic Expands the Tiger Zone – First Indications of Lion Style Copper Dominant Mineralization at Tiger

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Power Metallic Expands the Tiger Zone – First Indications of Lion Style Copper Dominant Mineralization at Tiger

 

 

 

 

 

Power Metallic Mines Inc(TSX-V: PNPN) (OTCBB: PNPNF) (Frankfurt: IVV) is pleased to announce the return of 4 holes from the winter 2025 drilling campaign focused on the Tiger Zone. The four holes (PN-25-098, 099, 101, 102) were testing off-hole EM (BHEM) anomalies generated from previously reported drill holes PN-24-090 and 094 (news release March 25, 2025). All holes hit Lion style polymetallic mineralization (copper dominant) at shallow vertical depths from 50-100 meters below surface (Table 1).

 

Power Metallic has been exploring multiple zones during the winter 2025 campaign, including the Lion Zone, Nisk Zone, Nisk East Zone, and Tiger Zone (Figure 1). The targets of the winter drilling extends over approximately 8km of strike of favorable stratigraphy. Assay results are beginning to come in on all zones, and this news release is focused on the Tiger Zone located approximately 700m east of the Lion Zone (Figure 1).

 

TIGER ZONE DRILL RESULTS

 

The discovery of the Tiger Zone (PN-24-094) was followed up in the winter 2025 campaign with BHEM surveying on the drill holes then available in the Tiger area (PN-24-088, 089, 090, 094). The resulting off-hole EM anomalies were drilled and all hit mineralization (Figure 2).

 

Tiger currently remains the smallest mineralized zone along the Nisk trend but retains good potential for a significant polymetallic discovery. For the drill holes reported here weak mineralization consistent with Lion style polymetallic mineralization was intersected in holes PN-25-098 and 101, but significant Lion style mineralization was intersected in holes PN-25-099 and 102 (Table 1).

 

Hole PN-25-099 is the first indication at Tiger of broader widths of a Lion style polymetallic zone (14.3 meters @ 0.96% CuEqRec1 including 6.0 meters @ 1.84% CuEqRec1). This intersection appears to be an up plunge extension of mineralization in hole PN-24-094. Hole PN-25-102 had a narrow Lion style zone, but the high grade tenor of the Cu dominant mineralization (1.00 meter at 6.37% CuEqRec1) in this hole is similar to the high grade Lion Zone.

 

The very shallow depths of these intersections (40-60 meters below surface), and the +300m distance along strike between the holes provides a large untested area for additional exploration. BHEM completed on these four holes has defined multiple off-hole EM anomalies (Figure 3) that will help direct future exploration in this area when Power Metallic returns following spring breakup.

 

UPCOMING EXPLORATION RESULTS

 

Commenting on the results to-date at Tiger, CEO Terry Lynch stated “As a stand-alone prospect, Tiger is becoming increasingly compelling. It’s not yet at Lion’s level, but recent results show clear promise. With operations paused for the annual goose hunt, we’re reviewing new drill data, re-evaluating geophysics, and preparing Tiger, Lion, and our other zones for a major ramp-up this summer with six rigs.”

 

In the coming weeks drilling results from the remaining 20 drill holes completed in the winter 2025 program will be logged, sampled and assayed. It is anticipated that assay for 4 holes from the Lion Zone (holes PN-25-096, 097, 100, and PML-25-001) will be available for release by next week. This will be followed by further Lion drill results in the coming weeks, and results from Nisk and Nisk East drill holes as well as two additional exploration holes in the Tiger area.

 

The winter 2025 drilling campaign has ended for the season, with expected restart of drilling in late May. This shutdown is to transition from winter drilling conditions to summer, allowing the land to dry out prior to restart. During the shutdown, the core facility at Nisk will be doubled to accommodate up to six drills.

 

The shutdown also coincides with respecting the annual goose hunt held every spring by the indigenous Cree nations. In support of the Cree hunting culture Power Metallic participated with 15 other mining and exploration companies in providing a financial contribution totalling $750,000 for the Reconstruction Initiative Forest Fires Fund 2023 (“RIFFF”). In 2024, 50 cabins damaged in the 2023 forest fires were rebuilt, and a further $200,000 will be used to continue the cabin rebuild process in 2025.

 

Table 1: Significant assay results from this news release – Tiger Zone

 

Significant assay from Tiger Area – Holes PN25-098, 099, 101, 102
Hole From To Length Au Ag Cu Ni Pd Pt Co CuEq
Rec1
(m) (m) (m) (g/t) (g/t) ( %) ( %) (g/t) (g/t) ( %) ( %)
PN-25-098 89.00 91.00 2.00 0.03 2.20 0.33 0.13 0.28 0.13 0.02 0.77
and 123.50 124.70 1.20 0.01 3.70 0.21 0.12 0.12 0.03 0.01 0.53
PN-25-099 73.90 75.90 2.00 0.02 1.35 0.20 0.34 0.55 0.04 0.02 1.16
and 88.70 103.00 14.30 0.05 4.38 0.54 0.15 0.26 0.06 0.01 0.96
Including 88.70 94.70 6.00 0.12 8.53 1.11 0.26 0.46 0.12 0.02 1.84
PN-25-101 68.85 70.85 2.00 0.02 1.40 0.22 0.28 1.40 0.16 0.02 1.38
PN-25-102 40.50 41.50 1.00 0.26 22.70 4.45 0.47 3.66 0.24 0.03 6.37
Note: Reported length is downhole distance; true width based on model projections is estimated as 85% of downhole length

 

Previously released drill results are available in a public database accessible as a download on Power Metallic’s website. Currently this database contains hole assay and collar information up to hole PN-24-75 but will be updated soon with all remaining publicly released holes.

 

1Copper Equivalent Rec Calculation (CUEqRec1)
CuEqRec represents CuEq calculated based on the following metal prices (USD) : 2,360.15 $/oz Au, 27.98 $/oz Ag, 1,215.00 $/oz Pd, 1000.00 $/oz Pt, 4.00 $/lb Cu, 10.00 $/lb Ni and 22.50 $/lb Co., and a recovery grade of 80% for all commodities, consistent with comparable peers.

 

Qualified Person

 

Joseph Campbell, P.Geo, VP Exploration at Power Metallic, is the qualified person who has reviewed and approved the technical disclosure contained in this news release.

 

About Power Metallic Mines Inc.

 

Power Metallic is a Canadian exploration company focusing on developing the High-Grade Nickel Copper PGM, Gold and Silver Nisk project into Canada’s next polymetallic mine.

 

On February 1, 2021, Power Metallic (then called Chilean Metals) completed the acquisition of its option to acquire up to 80% of the Nisk project from Critical Elements Lithium Corp. (TSXV: CRE).

 

The NISK property comprises a large land position (20 kilometres of strike length) with numerous high-grade intercepts. Power Metallic is focused on expanding the high-grade nickel-copper PGM, Gold and Silver mineralization with a series of drill programs designed to evaluate the initial Nisk discovery zone, the Lion discovery zone and to explore the land package for adjacent potential poly metallic deposits.

 

QAQC and Sampling

 

GeoVector Management Inc. is the Consulting company retained to perform the actual drilling program, which includes core logging and sampling of the drill core.

 

All samples were submitted to and analyzed at Activation Laboratories Ltd, an independent commercial laboratory for both the sample preparation and assaying. Actlabs is a commercial laboratory independent of Power Metallic with no interest in the Project. Actlabs is an ISO 9001 and 17025 certified and accredited laboratories. Samples submitted through Actlabs are run through standard preparation methods and analysed using RX-1 (Dry, crush (< 7 kg) up to 80% passing 2 mm, riffle split (250 g) and pulverize (mild steel) to 95% passing 105 μm) preparation methods, and using 1F2 (ICP-OES) and 1C-OES – 4-Acid near total digestion + Gold-Platinum-Palladium analysis and 8-Peroxide ICP-OES, for regular and over detection limit analysis. Pegmatite samples are analyzed using UT7 – Li up to 5%, Rb up to 2% method. Actlabs also undertake their own internal coarse and pulp duplicate analysis to ensure proper sample preparation and equipment calibration.

 

GeoVector’s QAQC program includes regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results. QAQC and data validation was performed and no material errors were observed.

 

 


Figure 1: Location map of 2025 target areas highlighting the Tiger Zone area with drill results reported in this news release (CNW Group/Power Metallic Mines Inc.)

 

 


Figure 2: Long section of drilling in the Tiger area highlighting the holes referred to in this news release for Tiger Zones (CNW Group/Power Metallic Mines Inc.)

 

 


Figure 3: BHEM off-hole anomalies in the Tiger area for testing when drilling resumes in May (spring, summer campaign) (CNW Group/Power Metallic Mines Inc.)

 

Posted April 17, 2025

Share this news article

MORE or "UNCATEGORIZED"


Critical Metals Corp Achieves Breakthrough Tanbreez Heavy Rare Earth Results: >99% Dissolution of Eudialyte Concentrate Into 19 Ultra-High-Purity Rare Earth Products; Refinery Study Projects US$1.8–2.2b in Annual Refinery Revenue

Critical Metals Corp. (Nasdaq: CRML) a leading critical minerals ... READ MORE

September 16, 2026

Metalsource Mining Extends High Grade Mineralization at Depth as Silver Hill Exploration Enters Major Expansion Phase

Holes SH26-22 and SH26-23 return up to 930 g/t AgEq within broade... READ MORE

September 16, 2026

Pasinex Completes Sale of High-Grade Zinc Sulphide Material and Provides Pinargozu Operations Update

Pasinex Resources Limited (CSE: PSE) (FSE: PNX) a growing zinc-fo... READ MORE

September 16, 2026

Aya Gold & Silver Reports High-Grade Silver Exploration Results Near Pit and at Depth at Zgounder

Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) is pleased to... READ MORE

September 16, 2026

New Break Resources Ltd. (CSE: NBRK) (OTCQB: NBRKF) (FSE: O91) has received results from the last four holes of a ten-hole, 1,996 metre summer drilling program in the Zavitz gold zone at the Company's 100% owned Moray gold project. In total, New Break has completed 5,372 metres of drilling in 32 drillholes in 2026. Moray is located 49 km southeast of Timmins, Ontario and 32 km northwest of the Young-Davidson gold mine operated by Alamos Gold Inc. Select results from the final four of ten holes drilled in the summer drilling program are presented below in Table 1, while drillhole collar locations are detailed in Table 2 in Appendix A. Table 1 – Moray Summer 2026 Final Drill Results Hole ID Length (m) From (m) To (m) Width (1) (m) Au Grade (2) (g/t) NBR-26-29 322.0 77.3 78.8 1.5 0.42 and 138.0 139.1 1.1 0.38 and 162.5 173.3 10.8 (3) 1.61 and 227.4 229.0 1.6 1.21 and 231.5 232.1 0.6 1.72 NBR-26-30 250.0 37.0 38.0 1.0 0.30 and 102.8 103.5 0.7 0.60 and 121.5 122.5 1.0 0.36 and 124.5 125.5 1.0 0.33 and 128.5 129.0 0.5 0.90 and 131.0 132.0 1.0 0.36 and 169.8 174.0 4.2 2.65 and 178.0 179.5 1.5 0.77 and 183.5 186.6 3.1 1.22 and 190.0 190.5 0.5 1.06 and 191.5 192.5 1.0 1.48 and 196.0 200.5 4.5 2.53 and 203.5 204.0 0.5 2.15 and 206.5 212.0 5.5 1.57 NBR-26-31 274.0 169.0 170.5 1.5 0.37 and 184.5 186.0 1.5 0.51 and 197.0 200.0 3.0 0.94 and 201.5 202.0 0.5 0.50 and 203.5 210.0 6.5 (3) 3.12 NBR-26-32 352.0 73.5 74.0 0.5 0.44 and 174.0 174.6 0.6 0.52 and 194.0 195.0 1.0 0.66 and 199.8 203.3 3.5 2.29 and 227.3 228.0 0.7 0.97 (1) Intervals are drill intersections and do not necessarily represent true widths. (2) All intervals are presented using a cut-off grade of 0.3 g/t Au and internal dilution of no more than 1.0 metres at grades less than 0.3 g/t Au and assays are not capped (see QA/QC Procedures). (3) Drill core photos shown in Appendix B. Figure 1 – Newly Reported Drillholes NBR-26-29, 30 Figure 2 – Newly Reported Drillholes NBR-26-30, 31, 32 Note: The bottom of NBR-26-30 deviated southeast and is represented in both sections. Figure 1: Section B-B1 incorporates drillholes NBR-26-06, 07, 08, 25, 26, 27, 28, 29 and part of 30. Gold mineralization extends southeast into the syenite as exhibited in NBR-26-29. NBR-26-30 is identified in both sections A-A1 and B-B1 as the drillhole was collared along section A-A1 but deviated southeast, intersecting gold mineralization in the mafic volcanics in section B-B1. Figure 2: A-A1 incorporates drillholes NBR-26-03, 04, 05, 23, 24, 30, 31 and 32. NBR-26-31 exhibits gold mineralization both within the syenite (at the contact) and within a "flow breccia" within the hematite altered mafic volcanic at the contact. NBR-26-32 is typified by blocky faulted ground with lamprophyre dykes and gold mineralization in the hematite altered mafic volcanics in a brecciated quartz vein with angular syenitic fragments. William Love, Chief Executive Officer of New Break commented, "Ongoing drilling this summer in the Zavitz gold zone continues to deliver significant gold values, with gold mineralization intercepted in every drillhole. As depicted in Figures 1 and 2, gold mineralization has been encountered predominantly within the mafic volcanics. Importantly, drillholes NR-26-29 and NR-26-32, the deepest drilled to date, demonstrate that gold mineralization extends into the syenite to the southeast at the contact with the mafic volcanics." He further noted, "The intrusive-mafic volcanic contact in the Zavitz gold zone has a distinctive magnetic high. This could be reflective of the higher proportion of iron in these mafic volcanics, which is associated with the higher gold values. This same magnetic and IP signature has been identified elsewhere in areas also believed to be along the intrusive-mafic volcanic contact. Drilling these never before tested targets with the goal of identifying gold mineralization similar to that encountered in the Zavitz zone represents the potential for significantly expanding the Moray gold discovery. There is also the belief that the Zavitz zone could represent the first of a series of stacked mineralized gold zones, which would point to the potential for a much larger gold system at depth. We plan to test this through deeper drilling directly into the Zavitz zone." About the Moray Gold Project The Moray property is located in the heart of the Ontario Abitibi greenstone belt, 49 km southeast of Timmins surrounded by a number of significant gold producing companies and existing mills (see Figure 3). The Young-Davidson gold mine operated by Alamos Gold Inc., with its 8,000 tonne per day mill is the closest and within a short trucking distance of approximately 45 km by road from Moray. The understanding of gold mineralization at Moray continues to evolve with each round of drilling. The occurrence of gold mineralization extending into the syenite to the southeast of the Zavitz zone and in the deepest drillholes is noteworthy given the presence of syenite-hosted mineralization at Young-Davidison. More recent examination of the drill core also suggests that the gold mineralization discovered to date may resemble an intrusion related style of deposit like Agnico Eagle's Upper Beaver gold deposit east of Kirkland Lake, as opposed to a structurally hosted gold system. Both Young-Davidson and Upper Beaver host multi-million ounce gold deposits. Figure 3 – Moray Location Map: Surrounding Gold Producers and Upper Beaver Gold Project Technical Content and Qualified Person The scientific and technical information contained in this news release has been reviewed and approved by Peter C. Hubacheck, P. Geo, consulting geologist to New Break, and an independent Qualified Person as defined by National Instrument 43-101. Mr. Hubacheck certifies that this news release fairly and accurately reflects the technical information and data presented. New Break conducts its exploration activities in accordance with CIM Best Practices Guidelines. QA/QC Procedures QA/QC procedures were executed to ensure all work is conducted in accordance with best practices. All drill core was sawn in half with one half of the core prepared for shipment and the other half retained for future verification. All core is under watch from the drill site to the core processing facility. Drill core is BQTK size and sample intervals range from 0.5 metres to 1.0 metres in length. Commercially prepared certified reference material ("CRM") standards and blanks were inserted with each shipment at a rate of 1 QAQC sample in every 12 core samples. Samples from New Break's 2026 Moray drilling program were analyzed at Activation Laboratories in Timmins, Ontario, which is ISO 17025 certified, by 30-gram fire assay with atomic absorption finish. Any sample assaying greater than 10.0 g/t Au was re-assayed with fire assay gravimetric analysis. Grade composite intervals over core lengths are calculated using a weighted average grade with a cut-off grade of 0.3 g/t Au. Up to 1.0 m of internal dilution (consecutive interval below cut-off grade) are included within specific geologic domains and alteration assemblages, except as otherwise noted. The composites are constrained geologically by metasomatic alteration processes sourcing from the Fiset syenite intrusion and contact mafic volcanic rocks. Elevated gold values are coincident with hematite, silica, sericite and pyrite mineralization within structurally prepared brecciated corridors flanking the intrusion. Intervals are not true widths and no top cutting has been applied to the higher gold values. About New Break Resources Ltd. New Break is a Canadian mineral exploration company focused on its Moray gold project located 49 km southeast of Timmins, Ontario, in a well-established mining camp within proximity to existing infrastructure, and 32 km northwest of the Young-Davidson gold mine, operated by Alamos Gold Inc. Shareholders are also leveraged to exploration success in Nunavut, Canada, through New Break's 20% carried interest in the Sundog gold project and ownership of 6.0 million shares of Guardian Exploration Inc. (TSXV: GX). The Company is supported by a highly experienced team of mining professionals. Appendix A – Drillhole Data and Locations Table 2 – Moray Summer 2026 Drillhole Collar Locations Hole ID Length (m) UTM Easting UTM Northing UTM Elevation Azimuth (degrees) Dip (degrees) NBR-26-29 322.0 492703 5320285 363 220 -70 NBR-26-30 250.0 492708 5320329 363 220 -47 NBR-26-31 274.0 492708 5320329 363 220 -60 NBR-26-32 352.0 492708 5320329 363 220 -70 Total 1,198.0 Coordinates are reported in UTM Zone 17 North, with units in metres. Figure 4 – Zavitz Gold Zone – Surface Traces of 2025 and 2026 Drillholes. All of the drilling at Moray has been completed by Enviro North Exploration Inc. out of Sturgeon Falls, Ontario. Drilling in the Zavitz gold zone is shown in figure 4, with the 1,996 metres in 10 holes drilled this summer depicted in red, the 2,807 metres in 20 holes drilled from January to April 2026 shown in blue and the 1,817 metres in 8 holes drilled in 2025 shown in black. In total, 6,620 metres in 38 drillholes have been completed in the Zavitz gold zone, while New Break has completed a total of 5,372 metres in 32 drillholes of our planned 2026, 10,000 metre drilling program. Appendix B – Drill Core Photos From NBR-26-29 and NBR-26-31

New Break Resources Ltd. (CSE: NBRK) (OTCQB: NBRKF) (FSE: O91) ha... READ MORE

September 16, 2026

Copyright 2026 The Prospector News