The Prospector News

Phenom Reports Carlin Drilling Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Phenom Reports Carlin Drilling Results

 

 

 

 

 

Phenom Resources Corp. (TSX-V: PHNM) (OTCQX: PHNMF) (FSE: 1PY0) is pleased to announce results from the reverse circulation drill holes RC23-17 and RC23-18 both planned as a 2,000 foot depth test of the gold system at the Carlin Gold-Vanadium Project in the Carlin Gold Trend of Nevada. RC23-17 was abandoned at 500 feet due to difficult rock conditions. RC23-18 was drilled to a depth of 1900 feet. The two holes were collared 90 metres apart, both near vertical tests and encountered a near-surface mineralized vanadium zone.

 

Hole RC23-17 encountered the 22.86 metres (75 feet) vanadium unit starting at a depth of 74.68 metres (245 feet) and returned an average grade of 0.48% V205 Hole RC23-18 encountered the 15.24 metres (50 feet) vanadium unit starting at a depth of 3.05 metres (10 feet) and returned an average grade of 0.41% V205. True thicknesses of the two intercepts are not known. The nearest neighbour holes to RC23-17 and RC23-18 were R-128 and DDH-4 each about 90 metres away and encountered 13.7m (44 feet) @ 0.51% V205 and 7.0 m (22 feet) @ 0.91% V205%, respectively.

 

These intercepts are now the southernmost drillholes through the vanadium deposit, resulting in extending the deposit a further 90 metres (295 feet). The vanadium deposit still remains open southward, westward and northwestward for further expansion.

 

RC23-17 did not penetrate deep enough to test the gold target. RC23-18 encountered upper plate rocks followed by moderate to strongly altered (silicified-dolomite and quartz stringered-sulfide bearing and broken) Mississippian-aged Chainman Formation. The bottom 71.6 metres (235 feet) of the hole encountered continuous geochemically elevated gold values. From all of this, Dave Mathewson interprets that due to structural complexities the hole appears to be located a bit too far to the east and within the graben to properly test the gold target. On a positive note, the Chainman rocks were exceptionally altered and mineralized which indicated the gold system is there without question. He considers a hole placed to the west is justifiable to properly test the target in this area.

 

Dave Mathewson states, “My convictions remain strong and undeterred on the opportunity in our gold system on the Carlin Gold-Vanadium property. We took a very good shot 800 metres south of hole RC22-16, at a very good target that has multiple clues with RC23-17 and 18 and still remains untested. The other high priority target is the area around RC22-16 which remains very favourable for a gold discovery.”

 

Dave Mathewson continues, “I view all of our 3 gold projects as selective high impact target opportunities. Having said that, there is always a need to prioritize the deployment of our shareholders’ money for best gains according to our best judgement. As such, to continue our gold momentum, I am excited to next be drill testing our Dobbin and Crescent Valley gold projects in Nevada this summer which are shallower less expensive gold tests than at Carlin and for that reason will be prioritized ahead of drill testing next at Carlin.”

 

About Phenom Resources Corp.

 

Phenom has 100% interest in the Carlin Gold-Vanadium Project, located in Elko County, 6 miles south from the town of Carlin, Nevada and Highway I-80 which hosts the Carlin Vanadium deposit, North America’s largest highest grade primary vanadium resource. The Project lies in the Carlin Gold Trend. Approximately 9 million ounces comprised of multiple gold deposits, including past producing mines, are present near the Phenom property (5-15km).

 

Posted January 15, 2024

Share this news article

MORE or "UNCATEGORIZED"


Quimbaya Gold Closes $4 Million Financing and Expands Executive Team

Cornerstone investor brings proven regional track record; company... READ MORE

July 5, 2025

Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0% IRR and 2.0 Year Payback; Including an Updated Mineral Resource Estimate for Its Spanish Mountain Gold Project

Spanish Mountain Gold Ltd. (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF)... READ MORE

July 4, 2025

Aura Announces Preliminary Q2 2025 Production Results

Aura Minerals Inc. (TSX: ORA) (B3: AURA33) (OTCQX: ORAAF) is plea... READ MORE

July 4, 2025

Cascadia Announces Closing of Financing

Cascadia Minerals Ltd. (TSX-V:CAM) (OTCQB:CAMNF) is pleased to an... READ MORE

July 4, 2025

Abcourt Closes US$ 8M Loan Facility to Start Sleeping Giant Mine

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to anno... READ MORE

July 4, 2025

Copyright 2025 The Prospector News