The Prospector News

P2 Gold Drilling at BAM Intersects 1.38 g/t Gold over 80.0 meters

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

P2 Gold Drilling at BAM Intersects 1.38 g/t Gold over 80.0 meters

 

 

 

 

 

P2 Gold Inc. (TSX-V:PGLD) (OTCQB:PGLDF), reports results from 11-drill holes from the 2022 Drill Program at its gold-copper BAM Project located in the Golden Triangle in northwest British Columbia.

 

“We wrapped up the BAM 2022 Drill Program in late September after a very successful exploration season with 13,958 meters drilled in 95 holes,” commented Joe Ovsenek, President and CEO of P2. “An additional 59 holes are in the lab awaiting assaying, which we expect to release over the next couple of months. We believe BAM is on its way to becoming the next significant discovery in the Golden Triangle.”

 

BAM Project Drill Results

 

Select drill results (see Table 1 below for drill results) from holes BAM-032 to 037, 39, 40, 46, 47 and 49 drilled at the BAM Project include:

  • Hole BAM-032 intersected 1.30 g/t gold over 59.05 meters, including 15.0 meters grading 3.64 g/t gold;
  • Hole BAM-034 intersected 1.59 g/t gold over 36.5 meters, including 7.0 meters grading 5.63 g/t gold; and
  • Hole BAM-037 intersected 1.38 g/t gold over 80.0 meters, including 12.2 meters grading 2.43 g/t gold.

 

Drill holes BAM-032 to 037, 39, 40, 46, 47 and 49 were drilled on Section D running east-west through the center of the Monarch Gold Zone. Of these holes, BAM-032 to 34 were collared in mineralized conglomerate to the east of an interpreted carbonate horst in the center of Section D with the higher-grade gold intercepts located closer to the structure on the eastern margin of the carbonate horst. BAM-037, 038 and 039 and BAM-046, 047 and 049 were collared in mineralized siltstone to the west of the interpreted carbonate horst with the higher-grade gold intercepts located closer to the structure on the western margin of the carbonate horst. Holes BAM-35 and 036 were collared within the interpreted carbonate horst and did not encounter gold mineralization within the carbonate.

 

A plan map and sections for drill holes BAM-032 to 037, 39, 40, 46, 47 and 49 of the 2022 BAM Drill Program are available here.

 

The focus of the 2022 BAM Drill Program has been to find the limits of the epithermal surface mineralization and provide geologic information to aid in the interpretation of the airborne and ground geophysical surveys. This interpretation will be essential in discovering the source of the surface epithermal zone and any associated high grade and/or porphyry mineralization.

 

This latest drilling has continued to define several structures that were active either during and/or after the mineralization event. Gold grades intercepted by the drilling generally increase towards these structures suggesting they are potentially related to a feeder system. In addition, it is anticipated that the identification of assay gradients within the mineralization may confirm that these structures are part of the feeder system for the surface mineralization. This will allow future programs to focus on the high-grade, structurally controlled mineralization.

 

Table 1: Selected BAM Drill Results, October 2022 (BAM-032 to 037, 39, 40, 46, 47 and 49)(1, 2)

 

Hole Collar
Coords
Dip/
Azimuth
From
(m)
To
(m)
Interval
(m)
Gold
(g/t)
Silver
(g/t)
Drill
Pad
BAM-032 N6341978
E387220
-45/270 33.95 93.0 59.05 1.30 3.64 D-12
incl 43.0 58.0 15.0 3.84 6.52
BAM-033 N6341977
E387222
-70/270 21.5 36.0 14.5 0.92 1.28 D-12
incl 21.5 24.15 2.65 3.11 2.95
44.0 63.0 19.0 0.36 2.25
BAM-034 N6341977
E387225
-70/90 24.5 61.0 36.5 1.59(3) 3.92 D-12
incl 42.0 49.0 7.0 5.63(3) 6.72
106.5 112.5 6.0 0.65 4.54
BAM-035 N6341974
E387076
-45/90 46.0 57.0 11.0 0.65 4.56 D-10.5
105.0 141 36.0 1.17 6.22
incl 105.0 115.5 10.5 1.67 6.43
BAM-036 N6341974
E387074
-70/90 NSV D-10.5
BAM-037 N6341998
E386782
-43/270 3.0 83.0 80.0 1.38 2.17 D-7.5
incl 53.0 65.2 12.2 2.43 2.65
BAM-039 N6341998
E386783
-70/270 3.0 23.0 20.0 1.09 2.21 D-7.5
incl 3.0 11.0 8.0 1.82 3.94
37.2 57.00 19.8 1.27 1.27
BAM-040 N6341997
E386787
-70/90 3.0 17.5 14.5 0.82 1.72 D-7.5
25.0 50.0 25 0.65 1.71
incl 36.5 40.5 4.0 1.94 2.41
BAM-046 N6342002
E386649
-45/270 NSV D-6.5
BAM-047 N6342002
E386650
-90/00 90.7 93.3 2.6 1.44 2.08 D-6.5
BAM-049 N6342001
E386656
-45/90 59.05 82.0 22.95 0.82 6.54 D-6.5
incl 61.0 66.4 5.4 1.55 17.61

 

(1) True thickness to be determined.
(2) All samples were submitted for preparation and analysis by ALS Global at its facilities in Terrace, BC. All samples were analyzed using multi-digestion with ICP finish and fire assay with AA finish for gold. Samples with over 10 ppm gold were fire assayed with a gravimetric finish. One in 20 samples was blank, one in 20 was a standard sample, and one in 20 samples had a sample cut from assay rejects assayed as a field duplicate at ALS Global in North Vancouver, BC.
(3) One sample cut to 30.0 g/t gold.

 

Quality Assurance

 

Ken McNaughton, M.A.Sc., P.Eng., Chief Exploration Officer, P2 Gold, is the Qualified Person, as defined by National Instrument 43-101, responsible for the BAM Project. Mr. McNaughton has reviewed, verified and approved the scientific and technical information in this news release.

 

About P2 Gold Inc.

 

P2 Gold is a mineral exploration and development company focused on advancing precious metals and copper discoveries and acquisitions in the western United States and British Columbia.

 

Posted October 14, 2022

Share this news article

MORE or "UNCATEGORIZED"


VIZSLA SILVER AGREES TO ACQUIRE NEWLY CONSOLIDATED PAST-PRODUCING SILVER DISTRICT IN THE EMERGING SILVER-GOLD-RICH PANUCO - SAN DIMAS CORRIDOR IN MEXICO

Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) i... READ MORE

March 28, 2024

Additional Drill Results Highlighted by Hole D-380 in Block 6 at Oko West, Intersecting 39.7 m Grading 5.27 g/t Au Including 2.8 m @ 14.18 g/t Au and 13.0 m Grading 10.50 g/t Au

Reunion Gold Corporation (TSX-V: RGD) (OTCQX: RGDFF) is pleased t... READ MORE

March 28, 2024

STLLR Gold’s Tower Gold Project Infill Drilling Continues to Confirm Mineralization at the Jonpol Deposit

STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) announces ... READ MORE

March 28, 2024

Hudbay Provides Annual Reserve and Resource Update and Production Outlook

Consolidated copper production is expected to average 153,000i to... READ MORE

March 28, 2024

Aya Gold & Silver: Record 2023 Production, Revenue and Operating Cash Flow

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

March 28, 2024

Copyright 2024 The Prospector News