The Prospector News

Osisko Windfall Drilling Intercept High Grade in Lynx

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Osisko Windfall Drilling Intercept High Grade in Lynx

 

 

 

 

 

431 g/t Au over 4.7 metres

 

 

Osisko Mining Inc. (TSX:OSK) is pleased to provide new analytical results from the ongoing drill program at its 100% owned Windfall gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec.

 

Significant new analytical results presented below include 50 intercepts in 27 drill holes (2 from surface, 25 from underground) and 8 wedges. The infill intercepts are located inside defined January 2022 mineral resource estimate blocks (see Osisko news release dated January 10, 2022). The expansion intercepts are located outside the January 2022 MRE blocks and either expand resource wireframes or are in a defined zone or corridor but do not yet correlate to a specific wireframe.

 

Osisko Chief Executive Officer John Burzynski commented: “The Lynx infill and expansion drill programs continue to impress with respect to both high-grade and width. A third of today’s intercepts are greater than an ounce per ton gold and a third are greater than five meters in length. Drilling at Windfall remains focused on Lynx and other strategic areas.”

 

Selected high-grade intercepts include: 431 g/t Au over 4.7 metres and 32.6 g/t Au over 3.4 metres in WST-21-0929B; 187 g/t Au over 5.4 metres in OSK-W-21-2601-W1; 103 g/t Au over 6.6 metres in WST-21-0907; 65.5 g/t Au over 7.4 metres in OSK-W-21-2605-W1; 45.2 g/t Au over 8.5 metres in WST-21-0934; 22.1 g/t Au over 12.0 metres in OSK-W-21-2613-W1; 116 g/t Au over 2.1 metres in WST-21-0994; 36.0 g/t Au over 6.4 metres in OSK-W-21-1949-W16; 42.1 g/t Au over 5.2 metres in WST-21-0689A and 23.9 g/t Au over 5.6 metres in OSK-W-21-2381-W3. Maps showing hole locations and full analytical results are available at www.osiskomining.com. Maps: Long Section_All zones In EN 20220316Long Section_All zones Ex EN 20220316PR_EN_20220316_SurfacePR_EN_20220316_UG.

 

Infill Drilling

 

Hole No. From
(m)
To
(m)
Interval
(m)
Au (g/t)
uncut
Au (g/t)
cut to 100 g/t
Zone Corridor
OSK-W-21-1949-W16 624.7 631.1 6.4 36.0 22.6 LXM_3388 Lynx
including 629.6 630.0 0.4 298 100
and 630.0 630.4 0.4 116 100
OSK-W-21-2287-W12 1200.3 1202.5 2.2 14.3   LX4_3449 Lynx 4
including 1200.3 1201.2 0.9 31.8  
OSK-W-21-2564-W1 742.0 744.1 2.1 33.9 25.9 TLX_3171 Triple Lynx
including 742.7 743.2 0.5 134 100
OSK-W-21-2605 1304.0 1306.0 2.0 7.18   LX4_3445 Lynx 4
OSK-W-21-2605-W1 1295.7 1303.1 7.4 65.5 25.0 LX4_3449 Lynx 4
including 1296.4 1296.8 0.4 754 100
and 1296.8 1297.7 0.9 142 100
OSK-W-21-2613-W1 980.0 982.9 2.9 7.04   TLX_3161 Triple Lynx
including 981.8 982.9 1.1 14.6  
  1116.0 1128.0 12.0 22.1 19.9 TLX_3160 Triple Lynx
including 1118.2 1119.0 0.8 132 100
and 1127.0 1128.0 1.0 68.0  
  1131.0 1133.0 2.0 5.13   TLX_3160 Triple Lynx
WST-21-0689A 217.8 223.0 5.2 42.1 24.7 TLX_3161 Triple Lynx
including 220.0 220.5 0.5 281 100
WST-21-0713 26.7 33.0 6.3 5.34   LXM_3303 Lynx
including 32.1 33.0 0.9 18.3  
WST-21-0877 328.5 331.0 2.5 7.63   LSW_3556 Lynx SW
including 329.2 329.5 0.3 56.5  
WST-21-0907 527.7 534.3 6.6 103 32.4 LX4_3401 Lynx 4
including 530.4 531.4 1.0 565 100
WST-21-0929B 550.4 553.8 3.4 32.6 12.7 LX4_3404 Lynx 4
including 553.0 553.3 0.3 326 100
  564.8 569.5 4.7 431 62.6 LX4_3430 Lynx 4
including 564.8 565.6 0.8 293 100
and 565.6 566.4 0.8 2010 100
and 567.0 568.0 1.0 147 100
WST-21-0933A 331.0 333.5 2.5 4.76   TLX_3166 Triple Lynx
  498.4 500.4 2.0 31.2 25.2 LX4_3450 Lynx 4
including 499.0 499.3 0.3 140 100
WST-21-0934 481.1 489.6 8.5 45.2 22.9 LX4_3430 Lynx 4
including 483.6 484.5 0.9 236 100
and 485.9 486.2 0.3 323 100
WST-21-0948 504.6 506.8 2.2 27.9 23.1 LX4_3409 Lynx 4
including 504.6 504.9 0.3 136 100
WST-21-0956 244.6 246.6 2.0 41.9   TLX_3121 Triple Lynx
  251.0 253.3 2.3 40.5   TLX_3121 Triple Lynx
including 252.0 252.5 0.5 96.7  
WST-21-0961 199.0 201.1 2.1 17.8   TLX_3161 Triple Lynx
including 199.7 200.4 0.7 52.1  
WST-21-0964 484.0 486.0 2.0 3.87   LX4_3401 Lynx 4
WST-21-0967 219.5 221.8 2.3 9.91   TLX_3161 Triple Lynx
including 220.1 220.6 0.5 45.4  
WST-21-0970 466.4 468.4 2.0 9.06   LX4_3430 Lynx 4
including 468.1 468.4 0.3 57.5  
  476.0 478.3 2.3 6.34   LX4_3444 Lynx 4
including 476.7 477.0 0.3 22.2  
WST-21-0978A 315.4 317.6 2.2 20.4   TLX_3131 Triple Lynx
including 316.2 316.6 0.4 98.4  
WST-21-0981 178.7 181.1 2.4 20.9   TLX_3161 Triple Lynx
including 178.7 179.0 0.3 65.7  
WST-21-0991 328.0 330.0 2.0 40.5 35.8 LHW_3212 Lynx HW
including 328.5 329.2 0.7 114 100
WST-21-0994 181.3 183.4 2.1 116 40.7 TLX_3184 Triple Lynx
including 181.9 182.6 0.7 325 100
WST-21-0995 25.7 27.8 2.1 5.57   TLX_3161 Triple Lynx
  30.9 33.0 2.1 7.46   TLX_3161 Triple Lynx
WST-21-0996A 194.6 200.3 5.7 6.65   TLX_3164 Triple Lynx
including 198.8 199.1 0.3 47.7  
  225.0 231.0 6.0 4.10   TLX_3169 Triple Lynx
  381.0 383.0 2.0 4.18   TLX_3191 Triple Lynx
including 381.3 381.7 0.4 20.2  
WST-21-0997 555.0 557.2 2.2 9.24   LX4_3404 Lynx 4
WST-22-1000 147.3 155.5 8.2 8.26   TLX_3161 Triple Lynx
including 150.3 150.8 0.5 44.8  
WST-22-1002 250.0 252.0 2.0 20.7   LHW_3224 Lynx HW
including 251.0 252.0 1.0 41.4  
  268.0 270.0 2.0 3.63   LHW_3224 Lynx HW
WST-22-1007 199.4 201.7 2.3 9.11   TLX_3161 Triple Lynx
including 199.8 200.2 0.4 29.4  

 

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See “Quality Control and Reporting Protocols” below. LX4 = Lynx 4, LHW = Lynx Hanging Wall, LXM = Lynx Main, LSW = Lynx Southwest and TLX = Triple Lynx.

 

Expansion Drilling

 

Hole No. From
(m)
To
(m)
Interval
(m)
Au (g/t)
uncut
Au (g/t)
cut to
100 g/t
Zone Corridor
OSK-W-21-2381-W3 919.0 921.0 2.0 4.28   TLX Triple Lynx
  959.8 962.7 2.9 12.9   TLX Triple Lynx
including 961.5 961.9 0.4 51.0  
  997.0 1002.6 5.6 23.9   TLX_3158 Triple Lynx
including 997.0 997.4 0.4 50.6  
OSK-W-21-2540-W5 1134.0 1136.0 2.0 22.8   TLX Triple Lynx
including 1134.0 1135.1 1.1 41.3  
OSK-W-21-2601-W1 1004.6 1010.0 5.4 187 71.8 TLX_3158 Triple Lynx
including 1005.4 1007.8 2.4 330 100
and 1008.3 1008.6 0.3 325 100
OSK-W-21-2647 1364.0 1366.5 2.5 16.6   TLX_3172 Triple Lynx
including 1365.0 1365.6 0.6 62.4  
WST-21-0927 588.0 593.5 5.5 4.60   LX4 Lynx 4
including 588.0 588.7 0.7 25.6  
  650.3 661.0 10.7 5.79   LX4 Lynx 4
including 651.0 651.7 0.7 21.7  
WST-21-0970 448.9 451.4 2.5 17.4   LX4 Lynx 4
including 449.9 450.5 0.6 65.0  
WST-21-0992 242.1 244.2 2.1 11.8   LXM Lynx
including 242.1 243.0 0.9 25.4  
WST-21-0996A 359.0 362.1 3.1 4.21   TLX Triple Lynx

 

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See “Quality Control and Reporting Protocols” below., LXM = Lynx Main, LX4 = Lynx 4 and TLX = Triple Lynx.

 

Drill hole location

 

Hole No. Azimuth
(°)
Dip (°) Length
(m)
UTM E UTM N Elevation Section
OSK-W-21-1949-W16 105 -57 1014 453440 5435479 401 3825
OSK-W-21-2287-W12 116 -53 1302 453607 5435714 404 4075
OSK-W-21-2381-W3 134 -53 1392 453620 5435790 402 4125
OSK-W-21-2540-W5 117 -60 1311 453465 5435640 410 3925
OSK-W-21-2564-W1 132 -50 1152 452960 5435539 419 3425
OSK-W-21-2601-W1 125 -61 1235 453425 5435657 413 3900
OSK-W-21-2605 112 -55 1401 453552 5435669 408 4025
OSK-W-21-2605-W1 112 -55 1380 453552 5435669 408 4025
OSK-W-21-2613-W1 114 -53 1152 452981 5435549 420 3450
OSK-W-21-2647 100 -61 1215 453525 5435704 405 4000
WST-21-0689A 161 -64 397 453356 5435272 16 3650
WST-21-0713 165 4 40 453359 5435194 84 3625
WST-21-0877 158 -60 490 453105 5435065 231 3325
WST-21-0907 130 -40 701 453375 5435297 -26 3675
WST-21-0927 146 -48 751 453321 5435235 54 3600
WST-21-0929B 115 -46 771 453506 5435327 -90 3800
WST-21-0933A 131 -52 733 453222 5435121 135 3450
WST-21-0934 119 -39 583 453507 5435332 -47 3800
WST-21-0948 136 -31 583 453374 5435296 -26 3675
WST-21-0956 134 -60 301 453508 5435328 -7 3800
WST-21-0961 163 -56 390 453507 5435327 -7 3800
WST-21-0964 127 -38 684 453374 5435297 -26 3675
WST-21-0967 160 -60 271 453506 5435327 -7 3800
WST-21-0970 117 -34 519 453507 5435333 -47 3800
WST-21-0978A 146 -49 702 453508 5435327 -7 3800
WST-21-0981 174 -51 258 453358 5435296 -149 3675
WST-21-0991 134 -29 391 453461 5435326 32 3775
WST-21-0992 120 -34 499 453507 5435333 -47 3800
WST-21-0994 197 -38 231 453357 5435296 -148 3675
WST-21-0995 149 -39 148 453440 5435223 -159 3700
WST-21-0996A 143 -45 427 453358 5435297 -149 3675
WST-21-0997 119 -45 640 453506 5435326 -90 3800
WST-22-1000 139 -45 447 453359 5435297 -149 3675
WST-22-1002 122 -36 341 453507 5435332 -48 3800
WST-22-1007 142 -36 183 453345 5435313 -67 3650

 

Lynx Zone

Mineralization occurs as grey to translucent quartz-carbonate-pyrite-tourmaline veins and pyrite replacement zones and stockworks. Vein-type mineralization is associated with haloes of pervasive sericite-pyrite ± silica alteration and contain sulphides (predominantly pyrite with minor amounts of chalcopyrite, sphalerite, galena, arsenopyrite, and pyrrhotite) and local visible gold. Replacement mineralization is associated with strong pervasive silica-sericite-ankerite ± tourmaline alteration and contains disseminated pyrite from trace to 80% with local visible gold. Pyrite stockworks can form envelopes that reach several tens of metres thick. Fuchsite alteration is common and is spatially constrained to near the gabbros. Mineralization occurs at or near geological contacts between felsic porphyritic or fragmental intrusions and the host rhyolites or gabbros and locally can be hosted along the gabbro-rhyolite contact.

 

Qualified Person

The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Director of Exploration for Osisko’s Windfall gold project, who is a “qualified person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

 

Quality Control and Reporting Protocols

True width determination is estimated at 55-80% of the reported core length interval for the zone. Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.5 g/t Au diluted over core lengths of at least 2.0 metres. NQ core assays were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at (i) ALS Laboratories in Val d’Or, Québec, Vancouver, British Colombia, Lima, Peru or Vientiane, Laos (ii) Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using a Four Acid Digestion-ICP-MS method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.

 

About the Windfall Gold Deposit

The Windfall gold deposit is located between Val-d’Or and Chibougamau in the Abitibi region of Québec, Canada. The Mineral Resource Estimate defined by Osisko, as disclosed in the news release dated January 10, 2022 is supported by the technical report entitled “Mineral Resource Estimate Update for the Windfall Project” dated February 10, 2022 (with an effective date  of October 21, 2021), and assuming a cut-off grade of 3.50 g/t Au, comprises 565,000 tonnes at 11.6 g/t Au (210,000 ounces) in the measured mineral resource category, 8,907,000 tonnes at 10.5 g/t Au (2,994,000 ounces) in the indicated mineral resource category and 13,035,000 tonnes at 8.6 g/t Au (3,585,000 ounces) in the inferred mineral resource category. The key assumptions, parameters and methods used to estimate the mineral resource estimate disclosed in the January 10, 2022, news release, certain of which are described in the January 10, 2022, news release, are further described in the full technical report for this updated mineral resource estimate in accordance with NI 43-101 and is available on SEDAR (www.sedar.com) under the Corporation’s issuer profile. The Windfall gold deposit is currently one of the highest-grade resource-stage gold projects in Canada and has world-class scale. Mineralization occurs in three principal zones: Lynx, Main Zone, and Underdog. Mineralization is generally comprised of sub-vertical zones following intrusive porphyry contacts plunging to the northeast. The resources are defined from surface to a depth of 1,600 metres as it now includes the Triple 8 (T8) zone. The resources excluding T8 are defined from surface to a depth of 1,200 metres. The deposit remains open along strike and at depth. Mineralization has been identified at surface in some areas and as deep as 2,625 metres in others with significant potential to extend mineralization down-plunge and at depth.

 

About Osisko Mining Inc.

Osisko is a mineral exploration company focused on the acquisition, exploration, and development of gold resource properties in Canada. Osisko holds a 100% interest in the high-grade Windfall gold deposit located between Val-d’Or and Chibougamau in Québec and holds a 100% undivided interest in a large area of claims in the surrounding Urban Barry area and nearby Quévillon area (over 2,500 square kilometres).

 

Posted March 16, 2022

Share this news article

MORE or "UNCATEGORIZED"


PPX Mining Announces Closing Of $1.35 Million Private Placement

PPX Mining Corp. is pleased to announce that it has closed its fu... READ MORE

April 19, 2024

Elevation Gold Reports Financial Results for Year Ended December 31, 2023, including $66.4M in Total Revenue

Elevation Gold Mining Corporation (TSX-V: ELVT) (OTCQB: EVGDF) i... READ MORE

April 18, 2024

Reunion Gold Announces the Signing of a Mineral Agreement With the Government of Guyana for Its Oko West Project

Reunion Gold Corporation (TSX-V: RGD; OTCQX: RGDFF) is pleased to announ... READ MORE

April 18, 2024

Drilling Confirms 4 km of Favourable Corridor at Lynx Gold Trend

Puma Exploration Inc. (TSX-V: PUMA) (OTCQB: PUMXF) is thrilled to... READ MORE

April 18, 2024

Grid Metals Intersects 7 m at 1.28% Li2O at over 125 m Below the Previously Deepest Drill Holes at Donner Lake; Provides Project Update

Grid Metals Corp. (TSX-V:GRDM) (OTCQB:MSMGF) is pleased to announ... READ MORE

April 18, 2024

Copyright 2024 The Prospector News