The Prospector News

Osisko Metals Closes C$6 Million Private Placement of Flow-Through Shares

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Osisko Metals Closes C$6 Million Private Placement of Flow-Through Shares

 

 

 

 

 

Osisko Metals Incorporated (TSX-V: OM) (OTCQX: OMZNF) (FRANKFURT: OB51) is pleased to announce that it has closed its previously-announced brokered private placement, pursuant to which the Corporation sold an aggregate of 12,000,000 common shares of the Corporation that will qualify as “flow-through shares” (within the meaning of subsection 66(15) of the Income Tax Act (Canada)) at a price of C$0.50 per Flow-Through Share for aggregate gross proceeds of C$6,000,000, including the exercise in full of the agent’s option.

 

The Offering was led by Haywood Securities Inc., as sole agent and book runner. In consideration for its services, the Corporation paid Haywood a cash commission equal to 6.0% of the gross proceeds of the Offering.

 

The gross proceeds from the Offering will be used by the Corporation to incur eligible “Canadian exploration expenses” that will qualify as “flow‐through mining expenditures” (as such terms are defined in the Income Tax Act (Canada)) related to the Corporation’s Pine Point Zinc Project, located in the Northwest Territories. All Qualifying Expenditures will be renounced in favour of the subscribers of the Flow‐Through Shares effective December 31, 2021.

 

The securities issued under the Offering are subject to a hold period in Canada expiring four months and one day from the closing date of the Offering. The Offering is subject to final acceptance of the TSX Venture Exchange.

 

The securities offered have not been registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from the registration requirements. This news release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any State in which such offer, solicitation or sale would be unlawful.

 

About Osisko Metals

 

Osisko Metals Incorporated is a Canadian exploration and development company creating value in the base metal space. The Company controls one of Canada’s premier past-producing zinc mining camps, the Pine Point Project, located in the Northwest Territories for which the 2020 PEA (as defined below) has indicated an after-tax NPV of $500M and an IRR of 29.6%. The 2020 PEA is based on current Mineral Resource Estimates that are amenable to open pit and shallow underground mining and consist of 12.9Mt grading 6.29% ZnEq of Indicated Mineral Resources and 37.6Mt grading 6.80% ZnEq of Inferred Mineral Resources. Please refer to the technical report entitled “Preliminary Economic Assessment, Pine Point Project, Hay River, North West Territories, Canada” dated July 30, 2020, which has been filed on SEDAR. The Pine Point Project is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure, paved highway access, and has an electrical substation as well as 100 kilometres of viable haulage roads already in place.

 

The current Mineral Resources mentioned in this news release conform to National Instrument 43-101 – Standards of Disclosure for Mineral Projects standards and were prepared by independent qualified persons, as defined by NI 43-101 guidelines. The abovementioned Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. The quantity and grade of the reported Inferred Mineral Resources are conceptual in nature and are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological grade and/or quality of continuity. Zinc equivalency percentages are calculated using metal prices, forecasted metal recoveries, concentrate grades, transport costs, smelter payable metals and charges (see the 2020 PEA for details).

 

Posted April 29, 2021

Share this news article

MORE or "UNCATEGORIZED"


Koryx Copper Intersects 338.61 Meters At 0.38% Cu Eq Including 230.61 Meters At 0.45% Cu Eq and Multiple 2 Meters Intersections Over 1.00% Cu Eq

Significant copper and molybdenum intersections include: HM09: 13... READ MORE

May 15, 2024

Aya Gold & Silver Reports Q1-2024 Results; Maintains Guidance; Zgounder Expansion on Track

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

May 15, 2024

Silver Mountain Delivers Positive Preliminary Economic Assessment For Its Reliquias Project, Peru; Pre-Tax NPV 5% Of C$107 million, Pre-Tax IRR Of 57%, And Payback Of 1.8 Years

Key Highlights – Preliminary Economic Assessment Pre-Tax Net Pr... READ MORE

May 15, 2024

ARIS MINING REPORTS Q1 2024 RESULTS WITH SEGOVIA GENERATING $13.8 MILLION IN OPERATING CASH FLOW

Aris Mining Corporation (TSX: ARIS) (NYSE-A: ARMN) announces its ... READ MORE

May 15, 2024

Orla Mining Reports First Quarter 2024 Results

Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) announces the results fo... READ MORE

May 15, 2024

Copyright 2024 The Prospector News