The Prospector News

Osisko Development Extends Gold Mineralization at Cariboo Gold Project Beyond 700 m Vertical Depth in Previously Untested Areas; Intercepts Include 13.19 g/t Gold Over 3.60 m at 596 m Vertical Depth and 28.90 g/t Gold Over 0.50 m at 718 m Vertical Depth

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Osisko Development Extends Gold Mineralization at Cariboo Gold Project Beyond 700 m Vertical Depth in Previously Untested Areas; Intercepts Include 13.19 g/t Gold Over 3.60 m at 596 m Vertical Depth and 28.90 g/t Gold Over 0.50 m at 718 m Vertical Depth

 

 

 

 

 

HIGHLIGHTS

 

  • 8,971 m of new surface exploration drilling designed to test near mine potential at depth and in under-drilled gap zones between defined deposit footprints. Approximately 65% of drilling transected areas outside the Cariboo Gold deposit.
  • Highlight intercepts from outside the footprint of the current mineral resource across multiple zones on strike, include: 13.19 g/t Au over 3.60 m at 596 m vertical depth, 6.40 g/t Au over 6.30 m at 326 m vertical depth (including 40.60 g/t Au over 0.50 m, 19.10 g/t Au over 0.70 m, and 4.56 g/t Au over 0.70 m), 6.17 g/t Au over 7.10 m at 517 m vertical depth (including 73.20 g/t Au over 0.50 m, 10.40 g/t Au over 0.50 m, and 2.21 g/t Au over 0.50 m) and 28.90 g/t Au over 0.50 m at 718 m vertical depth.
  • Results to date confirm the presence of high-grade mineralization at depth and reinforce the strong potential for upside within under-tested gap zones and below the current Cariboo Gold deposit footprint, which extends to an average depth of approximately 350 metres.
  • 5 drill rigs continue operating at surface systematically testing targets down-dip of the current Mineral Resource to a maximum vertical depth of up to 800 metres.

 

Osisko Development Corp. (NYSE: ODV, TSX-V: ODV) is pleased to announce new drilling results from eleven (11) surface diamond drill holes that were completed as part of an ongoing deeps and near mine gap infill exploration program at the Company’s permitted, 100%-owned Cariboo Gold Project, located in central British Columbia, Canada.

 

Chris Lodder, President, stated, “We are encouraged by the initial results of the surface exploration drill program at the Cariboo Gold Project, which intercepted mineralization in all eleven drill holes. Strong high-grade intercepts in previously untested areas and known under-tested gaps continue to demonstrate the at depth potential for resource growth beyond our current mineral inventory. These results reinforce our view that we are only beginning to define the full extent of the mineralized system at depth, while identifying compelling near-mine upside opportunities — all within the Project’s existing permitted footprint. We are at an early stage of this program and are excited to keep drilling.”

 

DRILL ASSAY HIGHLIGHTS

 

This news release includes assays from eleven surface deeps and gap zone exploration diamond drill holes totaling 8,971 metres with depths ranging from 114 to 1,159 m (see Table 1 and Figure 2) completed between December 2025 and April 2026. Approximately 65%, or 5,823 m of drilling transected areas outside the current Cariboo Gold Mineral Resources, as defined by a 15 m buffer around optimized Mineral Reserves and Mineral Resources stope shapes1. All holes were collared in HQ (63.5 millimetre diameter) and reduced to NQ (47.6 millimetre diameter) where necessary to continue advance or implement directional drilling. Available tooling for directional drilling requires advance in NQ with a BQ (36.5 millimetre diameter) output while steering is active. All assays were received by June 1, 2026. Select assay highlights from intercepts outside the current Mineral Resources footprint include:

 

  • 42.42 grams per tonne gold over 1.50 m in IM-26-001 at 111 m vertical depth (Figure 2), including:
    • 122.50 g/t Au over 0.50 m, and
    • 3.17 g/t Au over 0.50 m
  • 6.40 g/t Au over 6.30 m in IM-26-001 at 326 m vertical depth, including:
    • 40.60 g/t Au over 0.50 m, and
    • 19.10 g/t Au over 0.70 m, and
    • 4.56 g/t Au over 0.70 m
  • 6.17 g/t Au over 7.10 m in IM-26-003 at 517 m vertical depth, including:
    • 73.20 g/t Au over 0.50 m, and
    • 10.40 g/t Au over 0.50 m, and
    • 2.21 g/t Au over 0.50 m
  • 13.19 g/t Au over 3.60 m in IM-26-003 at 596 m vertical depth, including:
    • 73.10 g/t Au over 0.50 m, and
    • 15.95 g/t Au over 0.50 m, and
    • 2.25 g/t Au over 0.60 m, and
    • 1.93 g/t Au over 0.50 m
  • 4.87 g/t Au over 5.90 m in IM-26-003 at 524 m vertical depth, including:
    • 29.00 g/t Au over 0.50 m, and
    • 17.15 g/t Au over 0.50 m, and
    • 4.56 g/t Au over 0.50 m, and
    • 2.81 g/t Au over 0.50 m
  • 6.61 g/t Au over 4.50 m in IM-26-003 at 425 m vertical depth (Figure 3), including:
    • 41.00 g/t Au over 0.50 m, and
    • 5.84 g/t Au over 0.50 m, and
    • 4.40 g/t Au over 0.50 m, and
    • 2.91 g/t Au over 0.50 m, and
    • 2.24 g/t Au over 0.50 m
  • 2.79 g/t Au over 8.25 m in IM-26-001 at 436 m vertical depth, including:
    • 19.65 g/t Au over 0.50 m, and
    • 9.30 g/t Au over 0.50 m, and
    • 3.06 g/t Au over 0.50 m, and
    • 6.36 g/t Au over 0.50 m, and
    • 4.03 g/t Au over 0.50 m
  • 13.83 g/t Au over 1.55 m in IM-26-003 at 277 m vertical depth, including:
    • 38.70 g/t Au over 0.55 m
  • 8.81 g/t Au over 2.25 m in CM-26-001 at 370 m vertical depth, including:
    • 23.10 g/t Au over 0.50 m, and
    • 16.00 g/t Au over 0.50 m
  • 17.32 g/t Au over 1.00 m in CM-25-003 at 371 m vertical depth, including:
    • 33.10 g/t Au over 0.50 m

 

Complete assay highlights, including true width estimates and vertical depths from surface, are presented in Tables 1 and 2, split by relative position within and outside of the current footprint of the Cariboo Gold Mineral Resources1. Drill hole locations and collar orientations are listed in Table 2. Intervals not recovered by drilling were assigned zero grade. Top cuts have not been applied to high grade assays.

 

Figure 1: Plan view Cariboo deep and gap zone surface drilling select intercept highlights.

 

Figure 2: 42.42 g/t Au over 1.50 m in IM-26-001 at 111 m vertical depth.

 

Figure 3: 6.61 g/t au over 4.50 m in IM-26-003 at 425 m vertical depth.

 

Figure 4: 2.79 g/t Au over 8.25 m in IM-26-001 at 436 m vertical depth.

 

Figure 5: Long section displaying Cariboo deeps and gap zone surface drilling with select intercept highlights.

 

DISCUSSION OF RESULTS

 

  • Results to date confirm the presence of high-grade mineralization at depth and reinforce the strong potential for resource growth upside well beyond the 350 m average of depth of the current deposit.
  • The consistency of broad high-grade intercepts in drill holes testing through and under the Shaft-Mosquito Gap, as seen in IM-26-002 and IM-26-003 (Figure 5), suggests high potential for near mine upside within this previously undertested zone.
  • Significant number of intercepts in Table 1 (length weighted assay composites and individual samples>=1.8 g/t Au within the footprint of the current Mineral Resources) demonstrate notable continuity and possible resource upside potential.
  • All eleven holes released encountered assay composites >=1.8 g/t Au, with ten holes encountering assay composites >=1.8 g/t Au outside the current Mineral Resources. One hole (CM-25-001) was stopped early at 114 m due to historical workings intercepted at 108 m downhole.

 

ABOUT THE CARIBOO DEEP PROGRAM

 

This ongoing program is designed to test the potential for vein corridor extensions of the existing Cariboo Gold deposit down to vertical depths of up to 800 m. The defined limit of the existing Cariboo Gold Mineral Resources and Mineral Reserves reflects limitations imposed by local topography and the practical depth of surface drills for achieving intercept spacing required for a mineral resource estimate, which is approximately 350 m vertical on average across the 4.4 km strike of the deposit. The program is also designed to target under-tested gap areas between defined deposit zones where historic mining was observed, including, for example, the ~1.2 km gap between the Shaft and Mosquito Creek Zones. Drillholes collared within the defined resource provide additional infill intercepts at shallower depths. Directional drilling has been implemented on select drillholes for higher precision targeting to depth.

 

Ongoing surface drilling will continue to systematically test down-dip of the current resource to a maximum along strike target spacing of 300 m. Additional holes at target spacing 50 m near surface and 100 m at depth will be drilled to test continuity around the most prospective intercepts outside the current Mineral Resources footprint. New lithologic data incorporated into updated and extended geologic models is expected to aid in further refining of at depth targets.

 

Table 1: Length weighted assay composites and individual samples>=1.8 g/t for Cariboo Deep diamond drill intercepts within the footprint of the current resource.

 

Drillhole ID   From (m) To (m) Length (m) Au g/t Est. True
Width (m)
Vertical
Depth (m)
CM-25-001   100.30 104.25 3.95 2.73 2.54 78 
  Including 102.65 103.75 1.10 8.68    
CM-25-002   65.40 65.90 0.50 1.91 0.35 51
    101.80 104.80 3.00 2.74 2.12 80 
  Including 101.80 103.30 1.50 3.24    
  and 103.30 104.80 1.50 2.23    
    177.10 180.50 3.40 9.31 2.30 140 
  Including 177.10 177.60 0.50 2.57    
  and 177.60 178.10 0.50 38.10    
  and 179.50 180.00 0.50 16.25    
  and 180.00 180.50 0.50 3.03    
    187.25 187.80 0.55 9.30 0.39 147
    191.70 196.20 4.50 4.41 3.18 153 
  Including 193.70 194.20 0.50 12.75    
  and 195.70 196.20 0.50 25.00    
    208.00 211.75 3.75 3.63 2.41 166 
  Including 209.00 209.50 0.50 24.90    
    230.40 231.90 1.50 2.26 1.41 184 
  Including 230.90 231.40 0.50 6.45    
    233.50 234.00 0.50 16.05 0.50 186
    235.00 236.00 1.00 17.47 0.42 188 
  Including 235.00 235.50 0.50 34.50    
    248.30 251.20 2.90 12.09 1.77 200 
  Including 249.70 250.45 0.75 26.50    
  and 250.45 251.20 0.75 19.60    
    264.90 266.90 2.00 12.83 1.41 214 
  Including 265.40 265.90 0.50 5.61    
  and 265.90 266.40 0.50 45.40    
CM-25-003   86.50 87.00 0.50 3.19 0.25 72
    142.35 142.85 0.50 3.10 0.25 117
    178.85 179.85 1.00 1.83 0.77 147 
  Including 179.35 179.85 0.50 2.00    
    197.45 200.15 2.70 1.88 2.24 163 
  Including 199.65 200.15 0.50 8.22    
    215.30 215.80 0.50 1.87 0.35 177
    248.70 249.70 1.00 2.44 0.91 204 
  Including 249.20 249.70 0.50 4.39    
    312.85 313.85 1.00 2.26 0.67 255 
  Including 312.85 313.35 0.50 4.21    
    321.40 322.40 1.00 2.11 0.71 262 
  Including 321.40 321.90 0.50 3.86    
  and 346.00 347.00 1.00 8.40 0.71 281
    351.85 353.50 1.65 10.62 1.13 286 
  Including 351.85 353.00 1.15 15.20    
    355.90 357.00 1.10 3.35 0.90 290 
  Including 355.90 356.50 0.60 5.94    
    364.25 364.75 0.50 3.06 0.38 296
    365.90 368.15 2.25 64.13 1.87 298 
  Including 367.65 368.15 0.50 288.00    
    392.05 392.55 0.50 2.34 0.39 320
CM-26-001   171.10 172.85 1.75 7.30 1.39 129 
  Including 172.35 172.85 0.50 24.90    
    198.80 199.80 1.00 2.06 0.64 149 
  Including 199.30 199.80 0.50 3.43    
    340.70 343.60 2.90 2.93 1.96 254 
  Including 340.70 341.85 1.15 5.61    
  and 341.85 342.55 0.70 2.45    
    344.75 346.20 1.45 2.20 0.98 257 
  Including 345.25 346.20 0.95 3.20    
    352.70 353.80 1.10 2.20 0.63 263 
  Including 353.20 353.80 0.60 3.81    
  and 356.10 356.60 0.50 2.81 0.41 265
    473.75 474.75 1.00 1.88 0.76 356 
  Including 474.25 474.75 0.50 2.09    
CM-26-002   35.40 36.55 1.15 5.76 0.74 15 
  Including 35.90 36.55 0.65 10.00    
    61.50 64.25 2.75 1.85 2.11 24 
  Including 62.00 62.50 0.50 9.38    
    73.00 74.40 1.40 3.49 1.03 28 
  Including 73.00 73.60 0.60 2.43    
  and 73.60 74.40 0.80 4.29    
    76.45 84.00 7.55 3.26 5.34 31 
  Including 77.45 77.95 0.50 2.06    
  and 78.45 79.50 1.05 13.10    
  and 80.10 81.00 0.90 8.55    
    92.85 97.00 4.15 5.30 3.99 36 
  Including 93.35 94.00 0.65 13.05    
  and 94.00 94.50 0.50 25.80    
    172.00 172.50 0.50 5.77 0.43 72
    201.50 202.90 1.40 2.48 1.07 90
    207.85 208.35 0.50 1.82 0.38 92
    213.20 213.70 0.50 1.86 0.38 94
    222.80 226.75 3.95 11.11 2.91 99 
  Including 223.55 224.05 0.50 66.80    
  and 224.55 225.05 0.50 16.85    
    232.90 234.00 1.10 2.19 0.71 102 
  Including 233.40 234.00 0.60 3.85    
    253.90 257.00 3.10 8.29 2.61 114 
  Including 253.90 254.40 0.50 2.97    
  and 254.40 254.90 0.50 45.00    
  and 254.90 255.40 0.50 3.14    
    261.25 264.30 3.05 3.37 1.96 118 
  Including 261.25 261.75 0.50 15.45    
  and 262.85 263.55 0.70 3.12    
    268.50 269.50 1.00 2.42 0.64 123 
  Including 269.00 269.50 0.50 4.60    
    305.30 305.80 0.50 10.60 0.32 145
    319.00 322.00 3.00 5.50 2.12 154 
  Including 321.50 322.00 0.50 31.80    
    390.50 392.35 1.85 1.93 1.31 197 
  Including 390.50 391.00 0.50 5.35    
    410.00 418.00 8.00 2.41 6.13 212 
  Including 411.00 411.50 0.50 10.80    
  and 415.00 415.50 0.50 15.80    
  and 416.00 416.50 0.50 9.69    
    442.00 443.10 1.10 2.35 0.78 231
    449.15 449.85 0.70 2.22 0.45 236
    452.65 457.00 4.35 2.34 2.80 240 
  Including 456.40 457.00 0.60 16.25    
    458.30 461.85 3.55 12.30 2.91 243 
  Including 459.50 460.90 1.40 17.50    
  and 460.90 461.85 0.95 19.75    
    485.90 486.40 0.50 8.40 0.37 260
    537.50 542.90 5.40 21.35 4.14 300 
  Including 540.65 541.15 0.50 3.15    
  and 541.15 542.40 1.25 89.80    
CM-26-003   36.00 36.50 0.50 11.20 0.38 29
    153.00 153.70 0.70 3.04 0.43 115
    264.00 264.50 0.50 2.07 1.00 198
    353.90 354.90 1.00 2.22 0.64 265 
  Including 353.90 354.40 0.50 4.10    
    373.00 374.00 1.00 2.28 0.82 279
    377.00 377.50 0.50 2.09 0.32 281
IM-25-001   46.25 47.00 0.75 38.30 0.65 37
    49.05 50.05 1.00 8.41 0.87 40 
  Including 49.05 49.55 0.50 16.70    
    93.00 94.70 1.70 2.74 1.60 84 
  Including 93.65 94.20 0.55 7.53    
    128.65 129.15 0.50 4.31 0.41 118
    180.00 181.00 1.00 2.17 1.65 169
    190.00 192.25 2.25 1.89 1.84 180 
  Including 190.70 191.20 0.50 3.96    
  and 191.75 192.25 0.50 4.03    
    248.50 249.00 0.50 2.02 0.32 237
    296.60 297.60 1.00 2.02 0.57 285 
  Including 297.10 297.60 0.50 3.11    
    334.60 336.40 1.80 2.50 1.56 324 
  Including 334.60 335.20 0.60 5.42    
    340.45 352.50 12.05 5.07 7.47 335 
  Including 340.95 341.85 0.90 20.20    
  and 341.85 342.45 0.60 2.70    
  and 343.00 343.55 0.55 6.62    
  and 343.55 344.05 0.50 14.75    
  and 344.70 345.50 0.80 1.81    
  and 345.50 346.05 0.55 2.73    
  and 346.05 347.45 1.40 15.15    
    361.00 365.00 4.00 2.56 3.06 351 
  Including 361.50 362.00 0.50 16.20    
  and 363.00 363.55 0.55 2.68    
    371.85 372.85 1.00 2.47 0.69 360 
  Including 371.85 372.35 0.50 3.55    
    379.75 383.25 3.50 3.13 2.92 369 
  Including 379.75 380.25 0.50 3.57    
  and 380.25 380.75 0.50 3.55    
  and 381.25 381.75 0.50 4.52    
  and 381.75 382.25 0.50 5.93    
  and 382.25 382.75 0.50 4.05    
    399.05 401.05 2.00 9.11 1.65 388 
  Including 399.05 399.55 0.50 32.10    
  and 400.55 401.05 0.50 4.00    
    410.75 412.70 1.95 4.39 1.83 399 
  Including 410.75 411.25 0.50 5.91    
  and 411.25 412.20 0.95 5.80    
    516.75 517.75 1.00 1.83 0.77 504 
  Including 516.75 517.25 0.50 3.19    
IM-26-001   237.00 238.50 1.50 2.13 1.36 215 
    456.55 457.10 0.55 2.64 0.44 401
IM-26-002   90.50 92.65 2.15 13.48 1.82 52 
  Including 90.50 91.00 0.50 55.60    
    152.20 153.70 1.50 1.85 1.23 93 
  Including 152.70 153.20 0.50 1.93    
  and 153.20 153.70 0.50 3.50    
    221.00 222.60 1.60 9.18 1.41 144 
  Including 221.00 221.50 0.50 25.80    
  and 221.50 222.00 0.50 3.29    
    241.40 243.70 2.30 5.05 1.99 161 
  Including 241.40 242.50 1.10 10.40    
    290.30 292.65 2.35 5.34 1.80 201 
  Including 290.30 291.50 1.20 9.48    
    306.75 309.75 3.00 4.14 2.57 214 
  Including 308.75 309.25 0.50 1.95    
  and 309.25 309.75 0.50 21.60    
IM-26-004   56.15 59.05 2.90 1.81 2.22 53 
  Including 56.15 57.00 0.85 4.53    
    62.40 66.80 4.40 7.62 3.81 60 
  Including 62.40 63.40 1.00 1.84    
  and 64.15 64.65 0.50 2.41    
  and 64.65 65.15 0.50 58.30    
    73.20 74.70 1.50 11.58 1.15 69 
  Including 73.20 73.70 0.50 16.10    
  and 74.20 74.70 0.50 18.60    
    76.00 77.15 1.15 4.60 1.00 72
    223.15 224.50 1.35 2.09 1.03 208 
  Including 224.00 224.50 0.50 5.45    
    233.75 234.80 1.05 2.75 0.91 215 
  Including 233.75 234.25 0.50 5.56    
    279.00 279.50 0.50 3.70 0.49 250
    283.50 284.00 0.50 3.81 0.49 253
    294.00 294.50 0.50 4.37 0.47 261
    378.00 378.80 0.80 1.93 0.51 307
    387.50 388.00 0.50 3.29 0.49 310

Table 2: Length weighted assay composites and individual samples>=1.8 g/t for Cariboo Deep diamond drill intercepts outside the footprint of the current resource.

 

Drillhole ID   From (m) To (m) Length (m) Au g/t Est. True
Width (m)
Vertical
Depth (m)
CM-25-002   424.25 424.75 0.50 3.56 0.42 354
CM-25-003   440.50 441.50 1.00 2.89 0.77 360 
  Including 441.00 441.50 0.50 5.62    
    454.50 455.50 1.00 17.32 0.77 371 
  Including 455.00 455.50 0.50 33.10    
    643.85 644.35 0.50 10.35 0.38 524
    704.25 704.75 0.50 4.01 0.29 564
CM-26-001   492.50 494.75 2.25 8.81 1.72 370 
  Including 492.50 493.00 0.50 23.10    
  and 493.00 493.50 0.50 16.00    
    496.75 497.25 0.50 2.64 0.38 372
    540.00 542.50 2.50 3.48 2.11 404 
  Including 540.70 541.40 0.70 3.56    
  and 542.00 542.50 0.50 11.95    
    546.30 548.30 2.00 2.25 1.49 409 
  Including 546.80 547.30 0.50 5.22    
  and 547.30 547.80 0.50 3.23    
    550.75 551.25 0.50 4.14 0.38 411
CM-26-002   642.30 642.95 0.65 2.29 0.50 378
    655.60 658.40 2.80 3.58 1.94 388 
  Including 655.60 657.05 1.45 6.07    
    698.00 698.50 0.50 4.88 0.29 418
    790.65 791.95 1.30 1.97 0.75 494
    892.70 893.20 0.50 4.57 0.29 572
CM-26-003   442.35 442.85 0.50 1.92 0.43 323
    445.40 445.90 0.50 2.37 0.41 324
    456.50 457.50 1.00 1.89 0.64 325 
  Including 456.50 457.00 0.50 2.72    
    459.50 460.00 0.50 3.33 0.47 325
    462.00 462.50 0.50 3.85 0.35 326
    477.05 479.00 1.95 2.43 1.67 328 
  Including 477.05 478.00 0.95 2.72    
  Including 478.00 478.50 0.50 4.09    
    543.40 550.75 7.35 2.12 5.42 347 
  Including 544.90 545.40 0.50 14.80    
  and 548.00 548.50 0.50 2.00    
  and 549.90 550.75 0.85 4.49    
    552.25 557.10 4.85 1.80 2.61 350 
    555.10 556.60 1.50 4.29    
    565.75 566.75 1.00 9.85 0.61 355 
  Including 565.75 566.25 0.50 19.60    
    568.15 568.65 0.50 3.24 0.29 355
    659.50 660.00 0.50 2.41 0.35 400
    708.60 709.10 0.50 2.85 0.47 430
    801.50 802.00 0.50 2.65 0.35 490
    822.90 823.90 1.00 3.94 0.71 506 
  Including 822.90 823.40 0.50 2.19    
  and 823.40 823.90 0.50 5.68    
    830.60 831.20 0.60 1.86 0.39 511
IM-25-001   563.80 564.80 1.00 2.07 0.87 551 
  Including 564.30 564.80 0.50 3.78    
IM-26-001   115.40 115.90 0.50 5.01 0.35 101
    126.05 127.55 1.50 42.42 1.27 111 
  Including 126.05 126.55 0.50 3.17    
  and 126.55 127.05 0.50 122.50    
    151.00 152.60 1.60 2.16 1.39 135 
  Including 151.00 151.60 0.60 5.52    
    359.30 365.60 6.30 6.40 5.85 326 
  Including 359.30 360.00 0.70 19.10    
  and 360.50 361.00 0.50 40.60    
  and 362.50 363.20 0.70 4.56    
    424.00 427.60 3.60 2.34 3.01 376 
  Including 424.00 424.50 0.50 12.30    
  and 425.00 425.50 0.50 2.21    
    456.55 457.10 0.55 2.64 0.44 401
    494.25 502.50 8.25 2.79 6.92 436 
  Including 494.25 494.75 0.50 19.65    
  and 495.25 495.75 0.50 9.30    
  and 498.50 499.00 0.50 3.06    
  and 499.50 500.00 0.50 6.36    
  and 501.00 501.50 0.50 4.03    
    515.50 516.00 0.50 4.20 0.41 472
    536.85 537.85 1.00 3.20 0.87 452 
  Including 537.35 537.85 0.50 6.24    
    555.75 556.25 0.50 21.90 0.35 490
    628.00 629.50 1.50 2.93 1.41 559
    798.50 799.00 0.50 28.90 0.29 718
IM-26-002   505.75 507.00 1.25 1.98 0.98 358 
  Including 505.75 506.30 0.55 4.21    
    578.00 578.50 0.50 7.72 0.38 413
    619.30 619.80 0.50 2.22 0.38 442
    646.90 647.55 0.65 4.77 0.50 463
IM-26-003   26.60 28.60 2.00 7.42 1.73 18 
  Including 27.10 28.10 1.00 13.75    
    289.10 289.60 0.50 5.78 0.41 210
    308.00 309.40 1.40 3.92 0.70 225
    377.45 379.00 1.55 13.83 1.19 277 
  Including 377.95 378.50 0.55 38.70    
    554.50 555.00 0.50 23.30 0.35 404
    579.50 584.00 4.50 6.61 3.32 425 
  Including 579.50 580.00 0.50 5.84    
  and 581.00 581.50 0.50 41.00    
  and 581.50 582.00 0.50 2.24    
  and 582.00 582.50 0.50 2.91    
  and 582.50 583.00 0.50 4.40    
    694.45 695.45 1.00 2.88 0.57 501 
  Including 694.95 695.45 0.50 5.46    
    708.60 709.15 0.55 4.14 0.32 510
    717.40 724.50 7.10 6.17 5.22 517 
  Including 717.90 718.40 0.50 2.21    
  and 722.00 722.50 0.50 73.20    
  and 724.00 724.50 0.50 10.40    
    725.75 726.75 1.00 2.79 0.66 520 
  Including 726.25 726.75 0.50 4.95    
    730.35 736.25 5.90 4.87 4.40 524 
  Including 731.50 732.00 0.50 2.81    
  and 732.00 732.50 0.50 29.00    
  and 734.75 735.25 0.50 4.56    
  and 735.75 736.25 0.50 17.15    
    771.75 773.10 1.35 1.98 1.05 548 
  Including 772.60 773.10 0.50 5.07    
    818.80 819.30 0.50 4.61 0.41 578
    842.30 845.90 3.60 13.19 1.89 596 
  Including 842.30 842.80 0.50 15.95    
  and 843.30 843.80 0.50 73.10    
  and 844.30 844.90 0.60 2.25    
  and 844.90 845.40 0.50 1.93    
    938.70 940.20 1.50 5.25 0.93 664 
  Including 938.70 939.20 0.50 2.47    
  and 939.70 940.20 0.50 13.25    

Table 3: Surface DD collar locations, orientations, and max drillhole depths. Negative dips point down.

 

Drillhole ID Target Area Easting
(UTM Zn 10N)
Northing
(UTM Zn 10N)
Elevation
(m)
Depth
(m)
Collar
Dip
Collar
Azimuth
CM-25-001 Valley 595349 5883999 1201.37 114 -50 100
CM-25-002 Valley / Cow 595364 5883994 1201.40 757.4 -51 101
CM-25-003 Valley / Cow 595298 5884177 1200.79 891.5 -55 100
CM-26-001 Cow 595644 5883770 1282.97 1003 -45 100
CM-26-002 Cow / Valley 595643 5883764 1284.38 1027 -45 323
CM-26-003 Cow 595900 5883610 1359.41 1159.1 -45 105
IM-25-001 Shaft 594918 5884184 1295.53 720 -45 315
IM-26-001 Shaft 594989 5884345 1302.34 808.35 -45 310
IM-26-002 Shaft / Mosquito-Shaft Gap 594615 5884520 1396.15 868.4 -45 305
IM-26-003 Mosquito-Shaft Gap 594244 5884732 1411.35 983.3 -50 320
IM-26-004 Shaft 594914 5884187 1292.45 639 -45 305

CORPORATE NAME CHANGE

 

As previously announced, Osisko Development Corp. intends to change its name to Osisko Gold Group Inc., after receiving shareholder approval for the change of name at its annual and special meeting held on June 23, 2026. Also as previously announced, the Company intends to change the trading symbol for its common shares on both the TSX Venture Exchange and the New York Stock Exchange from “ODV” to “OGG”.

 

The Company anticipates the legal change in name to become effective on July 20, 2026, and expects its common shares to begin trading under the new symbol “OGG” on both the TSXV and the NYSE effective at market open on July 20, 2026. The trading symbols for the Company’s common share purchase warrants are also expected to change effective at market open on July 20, 2026: (i) warrants trading under “ODVWZ” on the Nasdaq Stock Market and “ODV.WT.U” on the TSXV will change to “OGGWZ” and “OGG.WT.U”, respectively; and (ii) warrants trading on the TSXV under “ODV.WT.A” and “ODV.WT.V” will change to “OGG.WT.A”, and “OGG.WT.V”, respectively.

 

In connection with the name and symbol changes of the Company’s listed securities, the CUSIPs and ISIN’s of the Company’s securities will change as well. For the Company’s common shares, the CUSIP and ISIN will be changed to 68827X105 and CA68827X1050, respectively. In addition, the following new CUSIP and ISIN numbers have been assigned to the warrants of the Company: (i) OGG.WT.A: CUSIP 68827X139 and ISIN CA68827X1399; (ii) OGG.WT.U (TSXV) and OGGWZ (Nasdaq): CUSIP 68827X113 and ISIN CA68827X1134; and (iii) OGG.WT.V: CUSIP 68827X121 and ISIN CA68827X1217.

 

ABOUT CARIBOO GOLD PROJECT

 

The Cariboo Gold Project is a permitted, 100%-owned feasibility-stage project located in the historic Wells-Barkerville mining camp of central British Columbia, Canada. Spanning approximately 186,740 hectares, the Company’s land package includes 443 mineral titles and covers an area that extends approximately 77-kilometres from northwest to southeast. In late 2024, the Project was granted the Mines Act and Environmental Management Act (British Columbia) permits, marking the successful completion of the permitting process for key approvals, solidifying the Project’s shovel-ready status.

 

The Cariboo Gold Project hosts Probable Mineral Reserves of 2.07 million ounces of contained Au (17,815 kt grading 3.62 g/t Au); Measured Mineral Resources of 8,000 ounces of contained Au (47 kt grading 5.06 g/t Au); Indicated Mineral Resources of 1.60 million ounces of contained Au (17,332 kt grading 2.88 g/t Au); and Inferred Mineral Resources of 1.86 million ounces of contained Au (18,774 kt grading 3.09 g/t Au). Mineral Resources are reported exclusive of Mineral Reserves.

 

Technical Reports

 

Scientific and technical information relating to the Cariboo Gold Project and the 2025 feasibility study on the Cariboo Gold Project is supported by the technical report, titled “NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia, Canada” and dated June 11, 2025 (with an effective date of April 25, 2025).

 

For readers to fully understand the information in the Cariboo Technical Report, reference should be made to the full text of the Cariboo Technical Report in its entirety, including all assumptions, parameters, qualifications, limitations and methods therein. The Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Report was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects and is available electronically on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under Osisko Development’s issuer profile and on the Company’s website at www.osiskodev.com.

 

Qualified Persons

 

The scientific and technical information contained in this news release has been reviewed, verified and approved by Scott Smith, P. Geo., Vice President, Exploration of Osisko Development, a “qualified person” within the meaning of NI 43-101. Verification includes core photo and three-dimensional review of logged drillhole data and assays consistent with the Company’s standard procedures.

 

Quality Assurance – Quality Control

 

HQ and NQ diameter drill core is cut (halved) on site at the Cariboo Project subsequent to QAQC checks for logging and sampling errors. BQ core (limited to directional intervals) are whole core sampled following daily QAQC. Any BQ intercepts external to the footprint of the current resource (none herein) are to be excluding from informing any new resource shapes. Quality control (QC) samples are inserted at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. Samples are bagged, labeled, sealed with numbered security tags

 

All drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays, and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250 grams is pulverized. Analysis for gold is by 50 gram fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed by fire-assay with gravimetric finish (upper limit 10,000 ppm). Select samples containing visible gold and/or cosalite are flagged during logging for an additional 1,000-gram screen metallic fire assay to ensure accurate quantification of any coarse fraction. All samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

 

End Notes (excluding tables)

  1. Refer to the Cariboo Technical Report for the assumptions, qualifications and limitations relating to disclosure about the Cariboo Gold Project and the 2025 feasibility study on the Cariboo Gold Project.

 

ABOUT OSISKO DEVELOPMENT CORP.

 

Osisko Development Corp. is a continental North American gold development company focused on past producing mining camps with district scale potential. The Company’s objective is to become an intermediate gold producer through the development of its flagship, fully permitted, 100%-owned Cariboo Gold Project, located in central British Columbia, Canada. Its project pipeline is complemented by the Tintic Project located in the historic East Tintic mining district in Utah, U.S.A., a brownfield property with significant exploration potential, extensive historical mining data, and access to established infrastructure. Osisko Development is focused on developing long-life mining assets in mining-friendly jurisdictions while maintaining a disciplined approach to capital allocation, development risk management, and mineral inventory growth.

 

Posted July 9, 2026

Share this news article

MORE or "UNCATEGORIZED"


F4 Uranium Announces Closing of Brokered Private Placement for Gross Proceeds of C$1.0 Million

F4 Uranium Crop. (TSX-V: FFU) is pleased to announce the closing ... READ MORE

July 9, 2026

Peruvian Metals Production Update for the First Half of 2026 at Aguila Norte Processing Plant

Peruvian Metals Corp. (TSX-V: PER) (OTC Pink: DUVNF) is pleased t... READ MORE

July 9, 2026

Lion One Reports 3,291 oz in Quarterly Gold Recovery

Lion One Metals Limited (TSX-V: LIO) (OTCQX: LOMLF) is pleased to... READ MORE

July 9, 2026

GoGold Announces 21% Increase in Parral Production

GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) is pleased to rep... READ MORE

July 9, 2026

Emerita Intersects 3.9 Meters Grading 3.8% Copper, 0.9% Lead, 1.6% Zinc, 2.81 g/t Gold and 71.26 g/t Silver at El Cura Deposit. Public Consultation Submission Phase of the AAU (Autorizacion Ambiental Unificada) Now Complete

Emerita Resources Corp. (TSX-V: EMO) (OTCQB: EMOTF) (FSE: LLJA) r... READ MORE

July 9, 2026

Copyright 2026 The Prospector News