The Prospector News

OROCO COMPLETES FINAL CLOSING OF NON-BROKERED PRIVATE PLACEMENTS

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

OROCO COMPLETES FINAL CLOSING OF NON-BROKERED PRIVATE PLACEMENTS

 

 

 

 

 

Oroco Resource Corp. (TSX-V: OCO) (OTC: ORRCF) is pleased to announce the closing of a non-brokered private placement raising net proceeds of $1,028,000 through the sale of 2,570,000 units at a price of $0.40 per unit.  Each unit consists of one share and one share purchase warrant.  Each share purchase warrant entitles the holder to purchase one share at the price of $0.65 per share for a period of 18 months from closing.

 

Commenting on the Private Placement, Richard Lock, CEO, stated: “In completing our recent series of private placements, we are very pleased to have exceeded our overall funding goal of five million dollars, despite the highly adverse market conditions.  We see this as a positive indication of the significant value that the Santo Tomas Project holds for Oroco.”

 

The Company intends to use the proceeds of the Private Placement to continue improving various underlying aspects of the Company’s Preliminary Economic Assessment, including those relating to the Santo Tomas mine plan, together with property maintenance and corporate overhead.

 

The Company will pay 75,000 shares to an agent as finder’s fees in connection with this financing. Those shares and any other shares issued, or warrants exercised pursuant to the terms of the Private Placement, are subject to a hold period expiring June 17, 2024.  The Private Placement was carried out under prospectus exemptions of applicable securities laws and is subject to final acceptance by the TSX Venture Exchange.

 

ABOUT OROCO:

 

The Company holds a net 85.5% interest in those central concessions (the “Core Concessions”) comprising 1,173 hectares of the Santo Tomas Project located in northwestern Mexico.  The Company also holds an 80% interest in an additional 7,861 hectares of mineral concessions surrounding and adjacent to the Core Concessions (for a total Project area of 9,034 hectares, or 22,324 acres).  The Project is situated within the Santo Tomas District, which extends up to the Jinchuan Group’s Bahuerachi Project, approximately 14 km to the northeast.  The Project hosts significant copper porphyry mineralization defined by prior exploration spanning the period from 1968 to 1994.  During that time, the Project area was tested by over 100 diamond and reverse circulation drill holes, totalling approximately 30,000 meters.  Commencing in 2021, Oroco conducted a drill program (Phase 1) at Santo Tomas, with a resulting total of 48,481 meters drilled in 76 diamond drill holes.  In October of 2023, the Company announced a Preliminary Economic Assessment and Updated Mineral Resource for the North and South Zones of the Santo Tomas Project, identifying Indicated and Inferred resources of 561 Mt @ 0.37% CuEq and 549 Mt @ 0.34% CuEq respectively.

 

The Project is located within 160 km of the Pacific deep-water port at Topolobampo and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and natural gas) through the city of Los Mochis to the northern city of Choix.  The property is reached, in part, by a 32 km access road originally built to service Goldcorp’s El Sauzal Mine in Chihuahua State.

 

Posted February 20, 2024

Share this news article

MORE or "UNCATEGORIZED"


Skeena Gold & Silver Secures the BC Mines Act Permit Following the Receipt of the Environmental Assessment Certificate for Eskay Creek

Skeena Resources Limited (TSX: SKE) (NYSE: SKE) is pleased to announce the receipt of its British Co... READ MORE

January 28, 2026

Spanish Mountain Gold Drilling Intersects 133.57 Metres Grading 1.35 g/t Gold With a Higher-Grade Subset of 25.47 Metres of 4.28 g/t Gold

Spanish Mountain Gold Ltd. (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF) is pleased to report additi... READ MORE

January 28, 2026

Minera Alamos Announces Secondary Market Purchase of its Shares by Group of Strategic Investors

Minera Alamos Inc. (TSX-V: MAI) (OTCQX: MAIFD) today announces that a subsidiary of Equinox G... READ MORE

January 28, 2026

Altamira Gold Intersects High Grade Gold Mineralization within the Cajueiro Mineral Resource and Commences Drilling at the Untested Mombaque and Guillermo Porphyry Targets, Brazil

Altamira Gold Corp. (TSX-V: ALTA) (FSE: T6UP) (OTCQB: EQTRF), is pleased to report assay res... READ MORE

January 28, 2026

Atico Reports Multiple Higher-Grade Intercepts up to 10.20m of 6.26% Cu, 8.50 g/t Au and 10.0m of 6.77% Cu, 3.39 g/t Au and Continues to Extend the Ore Body at El Roble Mine in Colombia

Atico Mining Corporation (TSX-V: ATY) (OTCID: ATCMF) is pleased to announce positive results from 21... READ MORE

January 28, 2026

Copyright 2026 The Prospector News