The Prospector News

Orezone Reports Q1-2024 Gold Production

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Orezone Reports Q1-2024 Gold Production

 

 

 

 

 

Orezone Gold Corporation (TSX: ORE) (OTCQX: ORZCF) is pleased to announce its first quarter 2024 gold production results from its Bomboré Gold Mine, located in Burkina Faso:

  • Gold production of 30,139oz
  • Gold sales of 31,229oz at an average realized price of US$2,066/oz, resulting in sales of US$64.5 million

 

Patrick Downey, President & CEO stated, “Q1 marked a solid start to 2024. Production to date for Q2 is trending above plan and the Company remains well positioned to meet its 2024 annual production guidance of 110,000-125,000oz.”

 

Bomboré Production Results (100% Basis) 

 

  Unit Q1-2024
Ore processed tonnes 1,355,619
Ore grade Au g/t 0.78
Plant recovery % 89.0
Gold produced Au oz 30,139

 

About Orezone Gold Corporation

 

Orezone Gold Corporation is a West African gold producer engaged in mining, developing, and exploring its 90%-owned flagship Bomboré Gold Mine in Burkina Faso. The Bomboré mine achieved commercial production on its Phase I oxide operations on December 1, 2022, and is now focussed on its staged Phase II hard rock expansion that is expected to materially increase annual and life-of-mine gold production from the processing of hard rock mineral reserves. The Company published the results of an updated feasibility study for the Phase II expansion in October 2023, and is currently in advanced negotiations with its senior lender for additional financing to fund the construction of this brownfield expansion. Orezone is led by an experienced team focused on social responsibility and sustainability with a proven track record in project construction and operations, financings, capital markets and M&A.

 

The technical report entitled Bomboré Phase II Expansion, Definitive Feasibility Study is available on SEDAR+ and the Company’s website.

 

Posted April 11, 2024

Share this news article

MORE or "UNCATEGORIZED"


Goliath Drills Up To 9.12 g/t AuEq Over 11.27 Meters With Visible Gold And Expands Bonanza Zone At The High-Grade Gold Surebet Discovery That Remains Open For Expansion, Golden Triangle, B.C.

Goliath Resources Limited (TSX-V: GOT) (OTCQX: GOTRF) (FSE: B4IF) is pleased to report assay result... READ MORE

September 18, 2026

Americas Gold and Silver Continues Track Record of Significant Discoveries at the Galena Complex with a New Galena Mine Vein Discovery Grading 1,062 g/t Ag, 0.7% Cu over 1.3 Meters While Crescent Drilling Returns 1,891 g/t Ag, 0.3% Cu over 1.3 Meters and 1,560 g/t Ag, 0.3% Cu over 1.1 Meters

Americas Gold and Silver Corporation (TSX: USA) (NYSE American: USAS) a North American prod... READ MORE

September 18, 2026

Cartier announces updated PEA for the Cadillac Project: After-tax NPV5% of C$1.0 billion and after-tax IRR of 26.6% at US$3,600/oz gold price

Cartier Resources Inc. (TSX-V: ECR) (FSE: 6CA) (OTCQB: ECRFF) is pleased to announce the results of... READ MORE

September 17, 2026

Oreterra Wraps up Phase 1 Drilling at Trek South with Visible Copper Minerals and Broad Intercepts of Porphyry-Style Alteration Above Postulated Intrusion; Planning for 2027 Phase 2 Underway, Assays Pending

Oreterra Metals Corp. (TSX-V: OTMC) (OTCQB: OTMCF) (FSE: D4R0) (WKN: A421RQ) is pleased to report t... READ MORE

September 17, 2026

NevGold Intercepts 1.06 g/t Oxide Au Over 42.7 Meters Outside of 2026 MRE Pit-shell; Mineralization Also Expanded Inside Pit-Shell With 5.00 g/t Oxide Au Over 3.0 Meters Within 1.23 g/t Oxide Au Over 27.4 Meters at Limo Butte, Nevada

NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleased to announce additional oxide-gol... READ MORE

September 17, 2026

Copyright 2026 The Prospector News