The Prospector News

Orezone Closes C$16.5 Million At-The-Market Private Placement

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Orezone Closes C$16.5 Million At-The-Market Private Placement

 

 

 

 

 

Orezone Gold Corporation (TSX: ORE) (OTCQX: ORZCF) is pleased to announce the completion of its previously announced at-the-market, non-brokered private placement of 13,000,000 common shares of the Company at a share price of C$1.27 for gross proceeds of C$16,510,000. The Offering was arranged with a large, and well-established, institutional fund.

 

The net proceeds of the Offering will be used to advance several strategic initiatives, including accelerated project development at Bomboré ahead of the Phase II sulphide expansion, additional targeted exploration drilling, and advancement of Orezone’s corporate growth strategy in the region.

 

All common shares issued pursuant to the Offering will be subject to a four month hold period from the date of closing. A finder’s fee is payable in connection with the Offering.

 

This press release does not constitute an offer of securities for sale in the United States. The securities being offered have not been, nor will be, registered under the United States Securities Act of 1933, as amended, and may not be offered or sold within the United States absent U.S. registration or an applicable exemption from U.S. registration requirements.

 

About Orezone Gold Corporation

 

Orezone Gold Corporation is a Canadian mining company operating the open pit Bomboré Gold Mine in Burkina Faso.

 

Orezone is focusing on mining and processing the Phase I near surface free-dig oxides at a planned annual throughput of 5.2 million tonnes. The Company believes that Bomboré has a significant underlying sulphide resource to support a substantially larger Phase II expansion. The Company has recently completed a resource definition drill program, and plans to issue an updated mineral resource, reserve and life of mine plan, as part of this Phase II expansion. It is expected that the pending study will be completed in Q3-2023 to be followed by a production decision.

 

Orezone is led by an experienced team focused on social responsibility and sustainability with a proven track record in project construction and operations, financings, capital markets and M&A.

 

The technical report for the 2019 Feasibility Study on the Bomboré Project entitled NI 43-101 Technical Report (Amended) Feasibility Study of the Bomboré Gold Project is available on SEDAR under the Company’s profile at www.Sedar.com.

 

Posted March 9, 2023

Share this news article

MORE or "UNCATEGORIZED"


Namibia Critical Metals Announces Completion of Japan's C$23 Million Earn-In and Formation of Strategic Joint Venture Company for the Lofdal Heavy Rare Earth Project

Namibia Critical Metals Inc. (TSX-V: NMI) (OTCQB: NMREF) is pleased to announce that Japan Organizat... READ MORE

July 31, 2026

Eldorado Gold Reports Solid Q2 2026 Financial and Operational Results; Skouries On Track for Q3 2026

Eldorado Gold Corporation (TSX: ELD) (NYSE: EGO) today reports the Company’s financial and operati... READ MORE

July 31, 2026

DPM Metals Reports Record Q2 2026 Free Cash Flow and Earnings; Vareš On-Track to Achieve Full Production by Year-end 2026

DPM Metals Inc. (TSX: DPM) (ASX: DPM) announced its operating and financial results for the second q... READ MORE

July 31, 2026

IMC Rare Earths Ltd Announces Closing of $20 Million Initial Public Offering

IMC Rare Earths Ltd, a company focused on the mineral exploration and development of magnet rare ear... READ MORE

July 31, 2026

Fairchild Gold Announces Closing of Private Placement Financing and Early Warning Report

Fairchild Gold Corp. (TSX-V: FAIR), is pleased to announce the closing, on July 29, 2026, of its pre... READ MORE

July 31, 2026

Copyright 2026 The Prospector News