The Prospector News

Orezone Closes C$16.5 Million At-The-Market Private Placement

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Orezone Closes C$16.5 Million At-The-Market Private Placement

 

 

 

 

 

Orezone Gold Corporation (TSX: ORE) (OTCQX: ORZCF) is pleased to announce the completion of its previously announced at-the-market, non-brokered private placement of 13,000,000 common shares of the Company at a share price of C$1.27 for gross proceeds of C$16,510,000. The Offering was arranged with a large, and well-established, institutional fund.

 

The net proceeds of the Offering will be used to advance several strategic initiatives, including accelerated project development at Bomboré ahead of the Phase II sulphide expansion, additional targeted exploration drilling, and advancement of Orezone’s corporate growth strategy in the region.

 

All common shares issued pursuant to the Offering will be subject to a four month hold period from the date of closing. A finder’s fee is payable in connection with the Offering.

 

This press release does not constitute an offer of securities for sale in the United States. The securities being offered have not been, nor will be, registered under the United States Securities Act of 1933, as amended, and may not be offered or sold within the United States absent U.S. registration or an applicable exemption from U.S. registration requirements.

 

About Orezone Gold Corporation

 

Orezone Gold Corporation is a Canadian mining company operating the open pit Bomboré Gold Mine in Burkina Faso.

 

Orezone is focusing on mining and processing the Phase I near surface free-dig oxides at a planned annual throughput of 5.2 million tonnes. The Company believes that Bomboré has a significant underlying sulphide resource to support a substantially larger Phase II expansion. The Company has recently completed a resource definition drill program, and plans to issue an updated mineral resource, reserve and life of mine plan, as part of this Phase II expansion. It is expected that the pending study will be completed in Q3-2023 to be followed by a production decision.

 

Orezone is led by an experienced team focused on social responsibility and sustainability with a proven track record in project construction and operations, financings, capital markets and M&A.

 

The technical report for the 2019 Feasibility Study on the Bomboré Project entitled NI 43-101 Technical Report (Amended) Feasibility Study of the Bomboré Gold Project is available on SEDAR under the Company’s profile at www.Sedar.com.

 

Posted March 9, 2023

Share this news article

MORE or "UNCATEGORIZED"


High-Grade Gold up to 42.3 g/t Confirmed in First Two Drillholes at Bousquet

High-Grade Gold up to 42.3 g/t Confirmed in First Two Drillholes ... READ MORE

July 28, 2025

NexMetals Achieves an Initial 15.2% Head Grade Increase at Selebi North Using Modern Technology Demonstrating High Recoveries and Significant Waste Reduction

NexMetals Mining Corp. (TSX-V: NEXM) (NASDAQ: NEXM) reports initi... READ MORE

July 28, 2025

Midland Announces Closing of $6.1 Million Private Placement with Strategic Investment from Centerra Gold

Midland Exploration Inc. (TSX-V: MD) is pleased to announce the c... READ MORE

July 28, 2025

Antimony Resources Corp. (ATMY) (K8J0) Intersects More Massive Antimony-Bearing Stibnite ("Sb"), Assays up to 14.91% Sb over 3.3 Meters Including a Zone of Massive Antimony-Bearing Stibnite Which Returned 34% Sb over One Meter

Antimony Resources Corp. (CSE: ATMY) (FSE: K8J0) reports that ass... READ MORE

July 28, 2025

Surge Reports Significant Amounts of Critical Minerals Rubidium and Cesium Contained Within its Nevada North Lithium Project

Surge Battery Metals Inc. (TSX-V: NILI) (OTCQX: NILIF) (FSE: DJ5... READ MORE

July 28, 2025

Copyright 2025 The Prospector News