The Prospector News

More Wide Lithium Bearing Intersections on Globex’s Lac Escale Royalty Claims

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

More Wide Lithium Bearing Intersections on Globex’s Lac Escale Royalty Claims

 

 

 

 

 

GLOBEX MINING ENTERPRISES INC. (TSX:GMX)  (FRA:G1MN)  (OTCQX:GLBXF)  is pleased to provide an additional update as regards drilling by Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) on Globex’s Lac Escale (Mirage) Lithium royalty property in the James Bay area of Quebec.

 

The drilling focused on the Central Zone has continued to intersect wide and well mineralized intervals.

 

Highlights include 1.64% Li2O over 69.3 m in drill hole MR-24-61 and 1.17% Li2O over 28.3 m in hole MR-24-50, both holes starting at surface.

 

Numerous other mineralized intervals have been reported in Brunswick’s press release issued today. Please refer to Brunswick’s press release for detailed information on the latest drill results including maps and sections.

 

Globex retains a 3% Gross Metal Royalty on the Lac Escale lithium claims.

 

This press release was written by Jack Stoch, P. Geo., President and CEO of Globex in his capacity as a Qualified Person (Q.P.) under NI 43-101

 

Posted June 4, 2024

Share this news article

MORE or "UNCATEGORIZED"


URANIUM ENERGY CORP ANNOUNCES THE CLOSING OF $203 MILLION PUBLIC OFFERING

Proceeds to be Used to Accelerate the Development of the United ... READ MORE

October 6, 2025

Barrick Announces Sale of Interest in Tongon for Up To $305 Million

Barrick Mining Corporation (NYSE:B) (TSX:ABX) announced that it h... READ MORE

October 6, 2025

Aquitaine Metals Drills Broad High-Grade Gold Mineralization: 16.45 g/t gold over 20.00 metres at Limousin Project

Aquitaine Metals Corp. is pleased to announce the first drill res... READ MORE

October 6, 2025

B2Gold Achieves Commercial Production at the Goose Mine

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) is pleased to announce th... READ MORE

October 6, 2025

Osisko Development Provides Infill Drilling Update on Its 13,000-Meter Lowhee Program at Cariboo Gold Project; Intercepts Include 45.24 G/T Gold Over 3.0 Meters, Including 233.92 G/T Gold Over 0.5 Meters

HIGHLIGHTS 2,279 m of infill drilling completed on 10-m dr... READ MORE

October 6, 2025

Copyright 2025 The Prospector News