The Prospector News

MONUMENTAL MINERALS RECEIVES AYQUINA-TURI INDIGENOUS COMMUNITY APPROVAL FOR EXPLORATION DRILLING LAND ACCESS ON THE SALAR DE TURI PROJECT, LITHIUM TRIANGLE, CHILE

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

MONUMENTAL MINERALS RECEIVES AYQUINA-TURI INDIGENOUS COMMUNITY APPROVAL FOR EXPLORATION DRILLING LAND ACCESS ON THE SALAR DE TURI PROJECT, LITHIUM TRIANGLE, CHILE

 

 

 

 

 

Monumental Minerals Corp. (TSX-V: MNRL) (FSE: BE5) (OTCQB: MNMRF) is pleased to announce the signing of an agreement with the Ayquina-Turi Indigenous Community for land and exploration access at the Salar de Turi lithium project.  Turi is located about 60 km northeast from the city of Calama, Chile, within the lithium triangle.

 

Dr. Jamil Sader, CEO comments:

“Monumental Minerals is committed to a respectful, transparent and a mutually beneficial relationship with the Ayquina – Turi Indigenous Community and we thank them for permitting us to explore and drill on their ancestral lands. It has been a pleasure working with the community, and we look forward to continuing to strengthen our relationship. Social governance and community engagement is a key Monumental Minerals’ policy, and we pledge to work with all stakeholders.”

 

The Ayquina-Turi Community comments

“The Ayquina-Turi Community has reached an agreement with Monumental Minerals to continue the drilling of two wells in the Salar de Turi. This agreement is made in the context of mutual respect of the parties, and the commitment to local indigenous communities, which are the basis for developing a lasting relationship”.   

 

The Turi Project is situated within the prolific lithium triangle, a zone within the central Andes high desert that includes Chile, Argentina, and Bolivia. This zone is estimated to contain more than half of the world’s lithium supply beneath the many salt flats, also known as salars, that are common to the region. The Turi Project is comprised of 40 exploration concessions totaling 8,500 hectares, 100% owned by Lithium Chile Inc. (TSX-V: LITH) through its wholly owned Chilean subsidiary Minera Kairos Chile Limitada. Monumental Minerals has the option to acquire a 50.01% interest and title in and to the Turi Project. The Turi Project is accessible from the city of Calama (60 km to the southwest) via the paved roads 21CH, and B-165 and is close to infrastructure. Travel time from Calama to the Turi Project is approximately 1 hour (see news releases dated October 6, 2022 and August 23, 2022 for additional details and map).

 

About Monumental Minerals Corp.

 

Monumental Minerals Corp. is a mineral exploration company focused on the acquisition, exploration, and development of mineral resource properties in the critical and electric metals sector. The Company’s flagship asset is the Jemi Heavy Rare Earth Element project located in Coahuila, Mexico near the Texas, USA border, which the Company has an option to acquire 100% of the 3,650-hectare project. The Company also has an option to acquire a 75% interest and title to the Laguna Blanca project located in Chile and an option to acquire a 50.01% interest and title to the Turi Project.

 

Posted February 6, 2023

Share this news article

MORE or "UNCATEGORIZED"


Antimony Resources Corp. Reports More Massive Antimony-Bearing Stibnite ("Sb") of 21.45% Antimony over 1.10 Meters and 15.0% Sb over 0.8 m in a Mineralized Zone of 4.36% Sb over 13.0 m at the Main Zone

Antimony Resources Corp. (CSE: ATMY) (OTCQB: ATMYF) (FSE: K8J0) i... READ MORE

October 15, 2026

Scandium Canada Discovers New Potential Zone East of the TG Deposit: Over 500 Metres of the Same Rock as the Current Resource

HIGHLIGHTS Six drill holes have confirmed the presence of a new z... READ MORE

October 15, 2026

Erdene Announces Preliminary Economic Assessment Results for Zuun Mod Molybdenum-Copper Project

Highlights  Base Case after-tax Net Present Value of US$745 mill... READ MORE

October 15, 2026

Minnova Announces Positive Preliminary Economic Assessment for the PL Gold Mine Restart: After-Tax NPV5% of US$181 Million and 111% IRR at US$3,000/oz Gold, Rising to US$439 Million at US$4,000/oz

Low-capital restart using the existing PL mill: US$53 million pre... READ MORE

October 15, 2026

Badlands Closes $3.2m Private Placement and Completes Acquisition of Goliath Property

Badlands Resources Inc. (TSX-V: BLDS) (FSE: 2KV) is pleased to an... READ MORE

October 15, 2026

Copyright 2026 The Prospector News