The Prospector News

Minaurum Accelerates Exploration with Mobilization of Additional Drill Rigs at Alamos Silver Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Minaurum Accelerates Exploration with Mobilization of Additional Drill Rigs at Alamos Silver Project

 

 

 

 

 

Minaurum Gold Inc(TSX-V: MGG) (OTCQX: MMRGF)  is pleased to announce that it now has four drill rigs operating as part of its ongoing 10,000-m infill drill program at the Alamos Silver Project, Sonora, Mexico. To date, over 3,000 meters has been drilled, targeting key zones including Promontorio, Europa-Guadalupe, and Travesia. All drill results will be incorporated into the project’s upcoming maiden resource estimate.

 

“With a robust treasury, the addition of key SilverCrest senior resource development experts, and the discovery of a stacked vein system at Promontorio, we are aggressively advancing exploration and fast-track drilling toward a maiden resource estimate at the Alamos Silver Project,” stated Darrell Rader, President & CEO. “We look forward to several project catalysts in the near term including drill results from the infill campaign.”

 

Minaurum approaches drilling at Alamos in a socially and environmentally responsible manner, using mobile, modular, man-portable core-drilling rigs. (Click for Video or visit https://minaurum.com/investors/esg/).

 

Figure 1. Diamond core drill rig onsite at Alamos Silver Project, Sonora, Mexico.

 

Minaurum Gold Inc. is an Americas-focused explorer concentrating on the high-grade 100% owned, production-permitted Alamos silver project in southern Sonora, Mexico and a portfolio of district-scale projects in Mexico. Minaurum is managed by one of the strongest technical and finance teams and will continue its founders’ legacy of creating shareholder value by acquiring and developing a pipeline of Tier-One precious-and base metal projects.

 

Posted August 25, 2025

Share this news article

MORE or "UNCATEGORIZED"


PTX Metals Inc. Announces Second Closing of Private Placement

PTX Metals Inc. (TSX-V: PTX) is pleased to announce the closing of the second tranche (with an addit... READ MORE

October 2, 2025

Lion One Produces 5,704 Tonnes at 10.60 g/t Gold from First Shrinkage Stope at Tuvatu and Increases Underground Development Rates by 70%

Lion One Metals Limited (TSX-V: LIO) (OTCQX: LOMLF) is pleased to provide an update on mining opera... READ MORE

October 2, 2025

ESGold Secures C$9 Million Strategic Partnership with Ocean Partners as Montauban Progress Accelerates

ESGold Corp. (CSE: ESAU) (OTCQB: ESAUF) (FSE: Z7D) is pleased to announce it has entered into a bind... READ MORE

October 2, 2025

Erdene Announces Updated Resource for the Zuun Mod Molybdenum-Copper Deposit

Erdene Resource Development Corp. (TSX:ERD) (MSE:ERDN) (OTCQB:ERDCD) is pleased to announce a... READ MORE

October 2, 2025

Copper Giant Achieves Up To 92% Copper And 97% Molybdenum Recoveries In Latest Metallurgical Testwork At Mocoa

Copper Giant Resources Corp. (TSX-V: CGNT) (OTCQB: LBCMF) (FRA: 29H0) announces results from i... READ MORE

October 2, 2025

Copyright 2025 The Prospector News