The Prospector News

Minaurum Accelerates Exploration with Mobilization of Additional Drill Rigs at Alamos Silver Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Minaurum Accelerates Exploration with Mobilization of Additional Drill Rigs at Alamos Silver Project

 

 

 

 

 

Minaurum Gold Inc(TSX-V: MGG) (OTCQX: MMRGF)  is pleased to announce that it now has four drill rigs operating as part of its ongoing 10,000-m infill drill program at the Alamos Silver Project, Sonora, Mexico. To date, over 3,000 meters has been drilled, targeting key zones including Promontorio, Europa-Guadalupe, and Travesia. All drill results will be incorporated into the project’s upcoming maiden resource estimate.

 

“With a robust treasury, the addition of key SilverCrest senior resource development experts, and the discovery of a stacked vein system at Promontorio, we are aggressively advancing exploration and fast-track drilling toward a maiden resource estimate at the Alamos Silver Project,” stated Darrell Rader, President & CEO. “We look forward to several project catalysts in the near term including drill results from the infill campaign.”

 

Minaurum approaches drilling at Alamos in a socially and environmentally responsible manner, using mobile, modular, man-portable core-drilling rigs. (Click for Video or visit https://minaurum.com/investors/esg/).

 

Figure 1. Diamond core drill rig onsite at Alamos Silver Project, Sonora, Mexico.

 

Minaurum Gold Inc. is an Americas-focused explorer concentrating on the high-grade 100% owned, production-permitted Alamos silver project in southern Sonora, Mexico and a portfolio of district-scale projects in Mexico. Minaurum is managed by one of the strongest technical and finance teams and will continue its founders’ legacy of creating shareholder value by acquiring and developing a pipeline of Tier-One precious-and base metal projects.

 

Posted August 25, 2025

Share this news article

MORE or "UNCATEGORIZED"


Critical Metals Corp. Proudly Announces the Highest Re-Assay TREO Results From Inception From (33) Drill Holes Results

Also Indicates Massive Geological Upside at the Hill Deposit at F... READ MORE

February 17, 2026

GoldHaven Confirms Gold Mineralization in Bedrock at Copeçal West Target, Including 39m of Mineralization in First-Ever Drilling

GoldHaven Resources Corp. is pleased to report results from four ... READ MORE

February 17, 2026

Erdene Expands Mineralization at Zuun Mod Molybedenum-Copper Project

Highlights: Drilling from surface to 150 metres depth returned mu... READ MORE

February 17, 2026

Supreme Critical Metals Announces Closing Of Second and Final Tranche Of LIFE Offering

Supreme Critical Metals Inc., (CSE: CRIT) (FWB: VR6) is pleased t... READ MORE

February 17, 2026

Osisko Development Provides Infill Drilling Update on Its 13,000-Meter Lowhee Program at Cariboo Gold Project; Intercepts Include 596.40 g/t Gold Over 2.0 Meters from 6.1 Meters Downhole, Including 2,293.56 g/t Gold Over 0.5 Meters from 6.6 Meters Downhole

HIGHLIGHTS 11,025 m of infill drilling completed (5,043 m new res... READ MORE

February 16, 2026

Copyright 2026 The Prospector News