The Prospector News

McFarlane intersects 179 metres (m) of 0.87 grams/tonne (g/t) Gold and 155 m of 0.9 g/t Gold

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

McFarlane intersects 179 metres (m) of 0.87 grams/tonne (g/t) Gold and 155 m of 0.9 g/t Gold

 

 

 

 

 

Overall Strike length now extends to 1.9 kilometers (km)

 

New mineralized lense discovered in “Hanging Wall” widens gold mineralization in Golden Lake Deposit at Juby Gold Project

 

More mineralization intersected at 826 Zone

 

McFarlane Lake Mining Limited (CSE: MLM) (OTC: MLMLF) (FRA: W2Z) is pleased to announce further results from its diamond drilling exploration campaign being conducted on its 100%-owned Juby Gold Project, located west of Gowganda, Ontario, within the southern part of the “Abitibi Greenstone Belt”. Drilling was initiated on the property in December 2025, commencing at the 826 Zone, and is now at the Golden Lake Zone (see Figure 1).

 

Highlights

 

Golden Lake Deposit continues to show excellent potential to add significant gold mineralization. From recent exploration drilling the strike length of gold mineralization has now extended to 1.9 kilometers in length from a previously announced 0.75 km (See Figure 2). Further holes GL26-83 and GL26-83A demonstrate a widening of the mineralization from the existing open pit shell (see Figure 3), this not only increases revenue potential but also favourably affects the economics of extraction.

 

Most Western drilled hole extends strike to 1.9 km: Assays from hole GL26-87 (93 m of 0.89 g/t gold) have confirmed a significant intersection on the most western hole drilled in the program on the Golden Lake deposit. This intersection not only extends the strike length to 1.9 km but demonstrates the deposit remains open to the west and at depth in this area.

 

New Mineralized Lense widens open pit outline in “Hanging Wall”: Commencing at 34 m from surfaces Hole GL- 83A intersected 179.10 m of 0.87 g/t gold which includes 15.55m of 1.58 g/t gold and 6.9 m of 2.33 g/t gold. Commencing at 65.85 m from surface Hole GL-83 intersected 155 m of 0.9 g/t gold which includes 11.4 m of 2.37 g/t gold. Both holes intersected gold mineralization close to surface and about 250 meters before its targeted mineralized area. Mineralization in the hanging wall area of the pit outline was unexpected and but now creates an opportunity to step back and test the extension (widening) in this area.

 

New Multiple mineralization intercepts at 826 zone: Mcfarlane has recently drilled 8 new holes on the 826 zone covering an additional 1350 m. Full assays are expected on the drilling in the coming weeks. Geologists have reported in the core logs that several intercepts of mineralization were encountered. These intercepts follow previous trends of mineralization seen from past drilling and widen the mineralization “dome” that was reported in detail on March 2, 2026 announcement. Drilling was targeting geophysical chargeability anomalies that follow an southeast/northwest trend and which are detailed in a previous announcement (May 26, 2026). McFarlane is currently engaged with Geoscience North who has teamed up with support from Laurentian University to analyze past geophysical data on the property and propose next steps.

 

Mark Trevisiol, McFarlane’s CEO, commented, “Both Golden Lake and 826 zone continue to impress. We are looking forward to updating the MRE and demonstrate to our stakeholders how extensive the gold system on our property is. We believe we are just ‘scratching the surface’ on this property with significant upside to add significantly more gold mineralization.”

 

Drilling at site continues on both Golden Lake and the Juby deposit. Drilling on Golden Lake will concentrate both on infill and some exploratory drilling. On the Juby deposit drilling will focus on grade control sampling for the upcoming Bulk Sample which is planned in 2027.

 

All the drilling for the upcoming Mineral Resource Estimate (MRE) concluded at the end of June. There was an unplanned 10 day delay in receiving assays due to equipment failure at the assay lab, however, as of todays’ announcement, all assays for the upcoming MRE have been received. McFarlane now expects the MRE to be issued in the next 2 to 3 weeks.

 

McFarlane is also continuing with Environmental Baseline work on the property. Approximately 19 ground water wells have now been drilled with monthly surface and ground water sampling continuing. Field studies have commenced for vegetation and terrestrial analysis. Environmental Baseline work has been reviewed with all three First Nation communities who have territorial rights in the area. There are three First Nation communities recognized as having territorial rights within the Juby Gold Project. They include Matachewan First Nation, Temagami First Nation and Atikameksheng Anishnawbek First Nation.

 

Figure 1 – Juby Gold Project – Plan View of Exploration Drilling Program Showing Drill Hole Locations at Golden Lake, Juby, and 826 Zones

 

 

Figure 2 – Extension of Mineralization- Golden Lake Deposit Looking North West

 

 

Figure 3 – Golden Lake Cross Section Hole GL 26-83 and GL 26-83A

 

 

Table 1 – Golden Lake Collar Information

 

Area Hole-ID Azimuth Dip Easting Northing Elevation Length (m)
Golden Lake GL26-77A 40 -55 500192 5272434 365 123.5
GL26-79 42 -58 500188 5272628 372 539
GL26-81 39 -56 499806 5272911 370 578
GL26-83 44 -55 499626 5273054 381 349.15
GL26-83A 38 -53 499636 5273054 381 620
GL26-86 40 -55 499970 5272892 373 516
GL26-87 44 -55 499314 5273317 368 600


Table 2 – Golden Lake and 826 Zone intercepts

 

Area Hole-ID From (m) To (m) Au gpt Width (m) True Width (m) Depth (m)
Golden Lake GL26-77A 79 79.75 1.8 0.75 0.6 64.47
  89.00 90.80 0.94 1.80 1.5 72.8
  96.00 98.00 0.25 2.00 1.7 78.4
  120.00 123.50 0.35 3.50 3.0 97.7
GL26-79 40.20 41.90 0.39 1.70 1.3 34.9
  178.50 185.00 0.27 6.50 4.9 154.5
  298.90 322.00 0.65 23.10 17.3 262.5
  339.00 349.00 0.62 10.00 7.5 290.6
  391.00 394.00 0.44 3.00 2.2 331.0
  401.90 404.15 0.35 2.25 1.7 339.7
  441.00 478.10 0.72 37.10 27.8 386.4
Including 450.00 455.00 2.19 5.00 3.7 380.6
             
GL26-81 10.00 11.00 6.65 1.00 0.8 8.7
  19.00 41.70 0.39 22.70 19.0 25.1
  49.50 68.00 0.69 18.50 15.5 48.4
  102.70 135.00 0.48 32.30 27.0 97.6
  238.00 242.85 1.09 4.85 4.1 195.9
  310.00 312.95 0.29 2.95 2.5 252.7
  453.00 458.00 0.79 5.00 4.2 365.6
  488.25 508.80 0.94 20.55 17.2 398.3
  511.90 513.75 0.35 1.85 1.5 409.6
  530.00 533.00 0.58 3.00 2.5 423.8
  537.00 538.35 2.65 1.35 1.1 428.5
             
GL26-82 26.15 60.00 0.54 33.85 23.7 36.7
Including 51.00 55.00 1.54 4.00 2.8 45.1
  185.00 188.90 0.76 3.90 2.7 159.1
  205.50 233.25 0.60 27.75 19.4 186.7
Including 205.50 208.20 1.08 2.70 1.9 176.0
  248.65 249.50 1.46 0.85 0.6 211.9
  253.10 257.65 0.62 4.55 3.2 217.2
  320.00 339.90 0.69 19.90 13.9 280.3
  341.55 343.50 0.22 1.95 1.4 290.8
  357.00 377.00 0.63 20.00 14.0 311.5
  392.55 415.90 0.82 23.35 16.3 342.8
Including 392.55 399.25 1.31 6.70 4.7 335.8
Including 410.00 413.40 1.38 3.40 2.4 349.1
  423.00 425.00 0.37 2.00 1.4 359.5
             
GL26-83 44.00 47.00 0.33 3.00 2.4 37.5
  65.85 221.10 0.90 155.25 122.5 118.8
Including 94.00 105.40 2.37 11.40 9.0 82.4
Including 130.00 135.00 1.39 5.00 3.9 109.7
Including 138.00 154.40 1.54 16.40 13.0 121.0
Including 191.40 198.00 1.86 6.60 5.2 160.9
  250.60 269.45 0.91 18.85 14.9 214.5
  343.00 345.00 0.54 2.00 1.6 283.3
             
GL26-83A 34.30 213.40 0.87 179.10 141.4 98.6
Including 75.75 91.30 1.58 15.55 12.3 66.5
Including 102.00 107.65 1.66 5.65 4.4 83.5
Including 141.10 146.40 1.25 5.30 4.2 114.4
Including 156.80 163.70 2.33 6.90 5.4 127.5
Including 189.00 195.00 1.53 6.00 4.7 154.5
Including 202.00 206.00 1.42 4.00 3.2 162.0
  313.80 339.00 0.45 25.20 19.9 258.1
  345.50 348.00 0.90 2.50 2.0 273.9
  353.00 364.00 0.38 11.00 8.7 283.1
  369.40 376.20 0.57 6.80 5.4 294.2
  380.60 385.55 0.34 4.95 3.9 302.2
  399.00 438.00 0.38 39.00 30.8 329.9
Including 416.00 422.00 0.75 6.00 4.7 330.3
  498.75 514.60 0.55 15.85 12.5 399.8
             
GL26-86 26.80 29.70 0.69 2.90 2.3 23.1
  43.95 87.00 0.31 43.05 34.2 36.7
  99.35 138.00 0.59 38.65 30.7 96.4
Including 119.00 138.00 1.07 19.00 15.1 104.3
Including 121.00 130.00 1.71 9.00 7.1 101.9
  166.00 173.35 0.55 7.35 5.8 137.4
Including 166.00 168.05 1.13 2.05 1.6 135.3
  219.00 244.50 1.11 25.50 20.4 186.7
Including 228.60 231.00 3.60 2.40 1.9 185.2
  253.00 255.25 0.30 2.25 1.8 204.4
  286.85 291.45 0.27 4.60 3.7 231.9
  301.80 309.75 0.37 7.95 6.4 244.8
  357.55 384.00 0.83 26.45 21.2 294.8
  389.10 389.85 1.73 0.75 0.6 309.1
  413.20 415.30 0.27 2.10 1.7 327.9
  424.85 425.60 13.33 0.75 0.6 336.2
             
GL26-87 24.00 27.00 0.44 3.00 2.3 21.0
  53.90 55.30 3.92 1.40 1.1 44.9
  111.00 113.70 1.47 2.70 2.0 92.4
  178.00 180.80 0.89 2.80 2.1 147.4
  184.00 188.00 1.24 4.00 3.0 152.8
  277.65 278.40 3.19 0.75 0.6 215.5
  280.70 282.40 1.41 1.70 1.3 230.6
  295.50 296.40 0.85 0.90 0.7 242.2
  355.00 448.00 0.89 93.00 70.4 326.9
Including 378.80 383.55 1.94 4.75 3.6 308.7
Including 387.30 395.20 1.87 7.90 6.0 318.7
Including 411.50 423.50 1.96 12.00 9.1 339.6
             

 

Figure 4 shows the area of planned drilling which has been done Golden Lake and the areas planned for additional exploratory drilling at the Juby deposit.

 

Figure 4 – Planned Area of Exploration for Golden Lake and Juby Resource Areas

 

 

Quality Assurance and Quality Control

 

The drill core samples collected by McFarlane and described in this news release were placed in core boxes by the drill crew contracted by the Company. Core was then transported by McFarlane personnel to a secure processing facility. The core is then reviewed with core metreage blocks checked to verify core integrity, geologically logged, and samples marked. Core samples are cut in half, with one half remaining in the box and the other inserted into a clean plastic bag with a sample tag. Certified reference materials are inserted into the sample stream at a rate of no less than 10%. Samples are then transported in secure sealed bags with security tags for preparation and assay by MSA Labs in Timmins, Ontario, a certified lab with AC89, IAS accreditation and compliance with ISO/IEC standard 17025:2017.

 

Samples reported are crushed at the lab in their entirety to 70% passing 2 mm, with one 300 to 500 g subsample split and placed into a jar for analysis by photon assay. Gold concentration results are then recorded with reference to each sample tag number.

 

About McFarlane Lake Mining Limited

 

McFarlane Lake Mining Limited is a Canadian gold exploration company focused on advancing its flagship Juby Gold Project, located near Gowganda, Ontario, within the established Abitibi Greenstone Belt. The Juby Gold Project hosts a current (effective September 29, 2025) NI 43-101 compliant Mineral Resource Estimate of 1.01 million ounces of gold in the Indicated category at an average grade of 0.98 g/t gold (31.74 million tonnes) and an additional 3.17 million ounces of gold in the Inferred category at an average grade of 0.89 g/t gold (109.48 million tonnes). The estimate was calculated using a long-term gold price of US$2,500 per ounce, applying cut-off grades of 0.25 g/t gold for open pit and 1.85 g/t gold for underground resources.

 

A sensitivity analysis completed at a higher gold price of US$3,750 per ounce resulted in an Indicated Mineral Resource of 1.20 million ounces grading 0.94 g/t gold (39.51 million tonnes) and an Inferred Mineral Resource of 4.23 million ounces grading 0.85 g/t gold (154.50 million tonnes) applying cut-off grades of 0.25 g/t gold for open pit and 1.15 g/t gold for underground resources.

 

The independent MRE was prepared by BBA E&C Inc. in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The full technical report supporting the resource estimate was filed on SEDAR+ on November 21, 2025. The technical report is also available on the Company’s website www.mcfarlanelakemining.com.

 

McFarlane is actively executing an exploration drilling program as detailed herein, and additional technical studies at the Juby Project to further evaluate and advance this large-scale gold system.

 

In addition to Juby, McFarlane holds a portfolio of 100%-owned gold assets across Ontario, including the past-producing McMillan Gold Mine and Mongowin properties located approximately 70 kilometres west of Sudbury and the Michaud/Munro properties located 115 kilometres east of Timmins. McFarlane is a reporting issuer in Ontario, British Columbia, and Alberta.

 

Posted July 23, 2026

Share this news article

MORE or "UNCATEGORIZED"


Scorpio Gold Announces Closing of Public Offering for Gross Proceeds of $10,800,000

Scorpio Gold Corporation (TSX-V: SGN) (OTCQB: SRCRF) (FSE: RY9) i... READ MORE

July 23, 2026

Altamira Gold Expands Mineralized Porphyry System at Maria Bonita Gold Deposit, Cajueiro District, Brazil

Altamira Gold Corp. (TSX-V: ALTA) (FSE: T6UP) (OTCQB: EQTRF), is ... READ MORE

July 23, 2026

Element 29 Extends Mineralization in ELID035 with Longest Intercept of 1,534.6 m Grading 0.58% CuEq2 at its Elida Porphyry Cu-Mo-Ag Deposit, Peru

Including 1,071.1 m grading 0.61% CuEq2, beyond the limits of the... READ MORE

July 23, 2026

Osisko Gold Reports Final Results from its Lowhee Zone Infill Program at the Cariboo Gold Project

HIGHLIGHTS Completion of the infill drill program in the Lowhee Z... READ MORE

July 23, 2026

Troilus Drills 1.10 g/t AuEq Over 103 m as Z87 Optimization Program Continues to Strengthen Mine Planning

*1.10 G/T AUEQ (0.98 G/T AU, 0.54 G/T AG, 0.07 % CU) OVER 103 M &... READ MORE

July 23, 2026

Copyright 2026 The Prospector News