The Prospector News

McFarlane Increases Gold Mineral Resources on Its Juby Gold Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

McFarlane Increases Gold Mineral Resources on Its Juby Gold Project

 

 

 

 

 

  • 59% Increase in Inferred Resources 
  • 13% Increase in Indicated Resources

 

Highlights of Latest Mineral Resource Estimate

  • 5.06 million inferred ounces gold at 0.87 grams per tonne gold and 1.14 million indicated ounces gold at 0.95 grams per tonne gold using a long-term gold price of US$3,600/oz (see Table 1 and Note 1)
  • Resource Sensitivities at US$4,600/oz gold yield 5.40 million inferred ounces at 0.85 grams per tonne gold and 1.20 million indicated ounces at 0.93 grams per tonne gold
  • New Higher-Grade Gold resources defined at 826 Zone
  • Drilling continues; Environmental Baseline work continues

 

McFarlane Lake Mining Limited (CSE: MLM) (OTCQB: MLMLF) a Canadian gold exploration and development company, is pleased to announce an updated Mineral Resource Estimate on its Juby Gold project located approximately 15 kilometres west of Gowganda, Ontario, and approximately 90 km west of Temiskaming Shores, Ontario.

 

This MRE has been classified in accordance with CIM Definition Standards on Mineral Resources and Mineral Reserves (CIM, 2014) and follows the CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (CIM, 2019). It is based on the review of existing geological data (drilling, assays, drill logs, etc.) and mineralization modelling. The MRE was independently prepared by Todd McCracken, P. Geo., of BBA E&C Inc., with technical staff primarily from their Sudbury, Ontario office. The full Technical Report, which is being prepared in accordance with NI 43-101, will be available on SEDAR+ (www.sedarplus.com) under the Company’s issuer profile within 45 days of this news release.

 

Table 1 – Detailed Mineral Resource Estimate within pit shell + underground shapes
(OP = open pit, UG = underground, Mt = million tonnes, Moz = million ounces, Au = gold metal)

 

Resource Classification Constraints Cut-Off Grade
(Au g/t)
Tonnage
(Mt)
Grade
(Au g/t)
Contained Metal
(Moz)
Indicated OP 0.25 36.47 0.93 1.09
Indicated UG 1.60 0.69 2.36 0.05
Total Indicated OP/UG 0.25/1.60 37.17 0.95 1.14
Inferred OP 0.25 175.81 0.83 4.69
Inferred UG 1.60 4.86 2.36 0.37
Total Inferred OP/UG 0.25/1.60 180.67 0.87 5.06
           

Note 1: Mineral Resource Statement Notes
1. CIM definition standards were followed for the resource estimate.
2. This Mineral Resource has an effective date of August 14, 2026.
3. The 2026 resource models used ordinary kriging (OK) grade estimation within a three-dimensional block model with mineralized domains defined by wireframe solids.
4. Mineral resources are constrained within pit shells (OP) and Underground Shapes (UG).
5. Open pit cut-off of 0.25 g/t Au milled is based on the cost/tonne (USD$/t) milled for incremental mining, processing, and G&A.
6. Underground cut-off of 1.60 g/t Au milled is based on the cost/tonne (USD$/t) mined, milled, and G&A.
7. The Au cut-off for OP and UG used for reporting is based on the following:
a. Long-term gold price of US$3600/oz.
b. Metallurgical recoveries are based on metallurgical testing recovery of 92%.
c. Average bulk density (specific gravity) was determined for each lithology and/or mineralized domain within the deposit.
d. Underground mining costs of USD$110/t, processing costs of USD$11.00/t, G&A costs of USD$4.00/t, and tailings cost of USD$2.00/t milled.
e. Dilution of 5% for OP and 10% for UG.
f. Overall Pit Slope angle of 47 degrees.
8. Mineral Resources that are not mineral reserves do not have economic viability. Numbers may not add due to rounding.
9. The resource estimate was prepared by Todd McCracken, P.Geo., of BBA E&C Inc. in accordance with National Instrument 43-101 standards of Disclosure for Mineral Projects.

 

The previous MRE (effective date September 29, 2025) used a base gold price of US$2,500/ounce and had calculated inferred resources of 3.17 million ounces of gold at a grade of 0.89 g/t gold and had indicated resources of 1.01 million ounces at a grade of 0.98 g/t gold. Approximately 13,000 metres of new exploration drilling was used in calculating the latest MRE, including the newly reported 826 Zone. This, combined with the higher long-term gold price of US$3,600/oz, has resulted in inferred resources increasing by 59% to 5.06 million ounces at 0.87 g/t gold and indicated resources increasing by 13% to 1.14 million ounces at 0.95 g/t gold (see Table 2 below for comparison).

 

At the 826 Zone, with only 2,200 metres of drilling, a new gold resource was established with a pit-constrained inferred mineral resource of 1.82 Mt at 1.29 g/t at a 0.25g/t gold cut-off. Thus far, this deposit area (826 Zone) has demonstrated a higher inferred gold grade than our other deposits (approximately 50% higher), as well, most of the mineralization is contained in a slowly dipping plunge all within 150 metres of surface. The 826 Zone will be a source of further exploration in 2026 and 2027.

 

“We are extremely happy with the significant increase in gold resources on the property, after only 7 months of drilling,” says Mark Trevisiol, CEO and Chairman of McFarlane Lake Mining, adding, “our drilling program has not only added resources to existing deposits but the new gold resource at our 826 Zone opens up the large southwestern area of our property where previously no gold resources were defined. Our exploration team has done an excellent job using all the exploration tools at their disposal, from historical drilling data, geological software modelling, to surface sampling, diamond drilling, and using the latest geophysical analytical tools to help guide the drilling campaign. There wasn’t a single diamond drill hole that didn’t intersect gold mineralization. This property is truly demonstrating its large-scale potential.”

 

Table 2 – Comparison of Recent MRE statements

 

Effective
Resource Date
Long term Gold
Price (US$/oz)
Inferred
ounces
(millions)
Inferred
Grade g/t
Gold
Inferred
tonnes
(millions)
Indicated
ounces
(millions)
Indicated
tonnes
(millions)
Indicated
Grade g/t
Gold
October 7/2025 $2,500 3.17 0.89 109.48 1.01 31.74 0.98
August 14/2026 $3,600 5.06 0.87 180.67 1.14 37.17 0.95
               

See note 1 for statement notes.

 

McFarlane would like to highlight that at higher gold prices there is a significant increase in gold resources. At a gold price of US$4,600/oz, the deposit holds 5.40 million inferred ounces at 0.85 grams per tonne gold and 1.20 million indicated ounces at 0.93 grams per tonne gold. Gold prices on the New York Comex exchange have averaged US$4,552/oz over the last six months.

 

In the coming weeks, McFarlane will share more details of the latest MRE, including sensitivities for both higher and lower gold prices compared to market, and sensitivities showing the higher-gold-grade areas of the deposit (>2 gpt gold).

 

Exploration Drilling is continuing on the property. The next phase of drilling will focus on both adding additional ounces and infill targets, which will be aimed at converting more of the inferred resources to indicated resources, aimed to increase the confidence level of gold resources.

 

Environmental baseline work is also continuing with monthly water sampling of both groundwater and surface water. Nineteen groundwater wells have been drilled on the property since December 2025. Further environmental field work is planned, including an archaeological study in which McFarlane has engaged all three First Nation communities which have territorial rights on the property and who are working with McFarlane in the selection of a consultant to perform the Archaeological study.

 

Qualified Person

 

The technical contents of this news release have been reviewed and approved by Todd McCracken, P.Geo., of BBA E&C Inc. Mr. McCracken is a qualified person, as defined by NI 43-101 and is independent of the Company. Mark Trevisiol, P.Eng. (ON), President and CEO of McFarlane Lake Mining and a Qualified Person as defined by National Instrument 43-101, has approved and verified the technical information used in this news release.

 

About McFarlane Lake Mining Limited

 

McFarlane Lake is a gold exploration company focused on exploring and advancing the Juby Gold project near Gowganda, Ontario. The Juby Gold project has a (NI 43-101) inferred resource of 5.06 million ounces of gold at 0.87 gpt contained in 180.67 million tonnes and Indicated resources of 1.14 million ounces of gold at 0.95 gpt contained in 37.17 million tonnes, using a long-term gold price of US$3600/oz. These resources have an effective date of August 14, 2026. Sensitivities performed at higher gold prices – US$4,600/oz gold- the deposit holds 5.40 million inferred ounces at 0.85 gpt gold and 1.20 million indicated ounces at 0.93 gpt gold.

 

The full technical report on these resources will be issued within 45 days of the Company’s MRE announcement. The technical report will be issued by BBA E&C Inc., an independent organization from McFarlane Lake Mining. McFarlane is currently planning to perform exploration drilling on the Juby Gold Project as well as other study work to advance the development of the property.

 

In addition to the Juby Gold Project, McFarlane holds a portfolio of 100%-owned gold assets across Ontario, including the past-producing McMillan Gold Mine and Mongowin properties located approximately 70 km west of Sudbury and the Michaud/Munro properties located 115 km east of Timmins. McFarlane is a reporting issuer in Ontario, British Columbia, and Alberta.

 

Posted August 18, 2026

Share this news article

MORE or "UNCATEGORIZED"


Miata Metals Closes C$25.2 Million Financing Including 19.9% Strategic Investment by La Mancha

Miata Metals Corp. (TSX-V: MMET) (FSE: 8NQ) (OTCQX: MMETF) is ple... READ MORE

August 18, 2026

ARRAS MINERALS INTERSECTS BROAD PORPHYRY COPPER-GOLD MINERALIZATION AT BEREZSKI NORTH, INCLUDING 568.9 METRES AT 0.33% CUEQ; WELCOMES NEW STRATEGIC SHAREHOLDER

Arras Minerals Corp. (TSX-V: ARK) (OTCQB: ARRKF) is pleased to re... READ MORE

August 18, 2026

Metalsource Mining Intersects High Grade Silver Hill Mineralization to 335 Metres Below Surface with 55 Metre Down Plunge Step Outs

55 metre away down plunge drilling step out returns multiple inte... READ MORE

August 18, 2026

Torr Metals Intersects Copper Sulphides and Potassic Alteration in Emerging Cu-Au Porphyry System at Bertha North

Torr Metals Inc. (TSX-V: TMET) is pleased to provide an update ... READ MORE

August 18, 2026

Tiger Gold Drills 79 m @ 0.8 g/t Au, Including 26 m @ 1.4 g/t Au, in 192- Metre Northwest Step-Out at Ceibal

Tiger Gold Corp. (TSX-V: TIGR) (FSE: D150) (OTCQB: TGRGF) is plea... READ MORE

August 18, 2026

Copyright 2026 The Prospector News