The Prospector News

Maritime Announces First Gold from Hammerdown

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Maritime Announces First Gold from Hammerdown

 

 

 

 

 

Maritime Resources Corp. (TSX-V: MAE) (OTCID: MRTMF) is pleased to announce the first gold pour from its Hammerdown Gold Project at the Company’s Pine Cove mill. Hammerdown and Pine Cove are located in the Baie Verte mining district of Newfoundland and Labrador near the towns of King’s Point and Baie Verte, respectively.

 

“The last time gold was poured from Hammerdown was in 2004 under Richmont Mines and 21 years later Maritime has repeated this significant achievement,” comments Garett Macdonald, President and Chief Executive Officer. “Bringing the Pine Cove mill back into operation after two years of care and maintenance, completing all project permitting and seeing the first gold poured from Hammerdown is the result of a tremendous effort by our team and the support of our shareholders, local communities and the Province.”

 

Construction of the Hammerdown Gold Project, including development of the open pit mine is well advanced, with crushed mineralization from the pre-stripping activities delivered and processed at Pine Cove resulting in the first gold poured from the project. After removing and replacing an aging material handling system, the mill is operating with feed sourced from the existing Point Rousse stockpile material, and more recently from crushed material received from Hammerdown.

 

Figure 1. Hammerdown First Gold

 

 Figure 2. Hammerdown Gold Project – Open Pit Development 

 

 Figure 3. Pine Cove Mill

 

Qualified Person

Exploration activities at Hammerdown are administered on site by the Company’s Exploration Manager, Larry Pilgrim, P.Geo. In accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects, Larry Pilgrim, P.Geo. Exploration Manager, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this press release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on its exploration projects.

 

Analytical Procedures

All samples assayed and pertaining to this press release were completed by Eastern Analytical Limited located at Springdale, Newfoundland and Labrador. EAL is an ISO 17025:2005 accredited laboratory for a defined scope of procedures. EAL has no relationship to Maritime. Drill core samples are collected from NQ sized diamond drill core and sawn in half. The half core samples are delivered in sealed plastic bags to EAL by Maritime field crews where they are dried, crushed, and pulped. Samples are crushed to approximately 80% passing a minus 10 mesh and split using a riffle splitter to approximately 250 grams. A ring mill is used to pulverize the sample split to 95% passing a minus 150 mesh. Sample rejects are securely stored at the EAL site for future reference. A 30-gram representative sample is selected for analysis from the 250 grams after which EAL applies a fire assay fusion followed by acid digestion and analysis by atomic absorption for gold analysis. Other metals were analyzed by applying an acid digestion and 34 element ICP analysis finish. EAL runs a comprehensive QA/QC program of standards, duplicates and blanks within each sample stream.

 

About Maritime Resources Corp.

Maritime is a gold exploration and development company focused on advancing the Hammerdown Gold Project in the Baie Verte District of Newfoundland and Labrador, a top tier global mining jurisdiction. Maritime holds a 100% interest directly and subject to option agreements entitling it to earn 100% ownership in the Green Bay Property which includes the former Hammerdown gold mine and the Orion gold project. Maritime controls over 439 km2 of exploration land including the Green Bay, Whisker Valley, Gull Ridge and Point Rousse projects. Mineral processing assets owned by Maritime in the Baie Verte mining district include the Pine Cove mill and the Nugget Pond gold circuit.

 

Posted November 12, 2025

Share this news article

MORE or "UNCATEGORIZED"


Doubleview Extends High-Grade Domains at Hat: H099 Returns 438m of 0.40% CuEq Including 52m of 1.02% CuEq, Expanding Mineralization Envelope Around Conceptual Pit Vertically and Laterally

Doubleview Gold Corp. (TSX-V: DBG) (OTCQB: DBLVF) (FSE: 1D4) is pleased to announce assay results f... READ MORE

December 5, 2025

Cosa Closes Upsized C$7.5 Million Private Placement

Cosa Resources Corp. (TSX-V: COSA) (OTCQB: COSAF) (FSE: SSKU) is pleased to announce that it ... READ MORE

December 5, 2025

Americas Gold and Silver Closes US$132.25 Million Bought Deal Financing

Americas Gold and Silver Corporation (TSX: USA) (NYSE American: USAS) is pleased to report that it h... READ MORE

December 5, 2025

1911 Gold Closes C$23 Million "Best Efforts" Life Offering & Private Placement and Provides Corporate Updates

1911 Gold Corporation (TSX-V: AUMB) (FRA: 2KY) is pleased to announce that it has completed its prev... READ MORE

December 5, 2025

Endeavour Silver Completes US$350 Million Offering of Convertible Senior Notes

Endeavour Silver Corp. (NYSE: EXK) (TSX: EDR) announced today the closing of its previously announce... READ MORE

December 5, 2025

Copyright 2025 The Prospector News