The Prospector News

Malbex Resources Inc. Closes Private Placement and Enters Into Earn-In Arrangement With Barrick Gold Corporation on the Del Carmen Project, Argentina

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Malbex Resources Inc. Closes Private Placement and Enters Into Earn-In Arrangement With Barrick Gold Corporation on the Del Carmen Project, Argentina

 

 

 

 

 

Malbex Resources Inc. (TSX-V:MBG) is pleased to announce that it has closed its previously announced private placement with Barrick Gold Corporation pursuant to which Malbex issued to Barrick 14,285,714 common shares of Malbex for an aggregate subscription price of C$1,000,000.
 

The proceeds from the Private Placement will be used for general corporate and working capital purposes. The Common Shares issued to Barrick under the Private Placement are subject to a hold period under applicable Canadian securities laws which will expire on December 29, 2014. The Private Placement is subject to final acceptance by the TSX Venture Exchange.
 

In connection with the closing of the Private Placement, Malbex has entered into a previously announced earn-in arrangement with Barrick relating to Malbex’s Del Carmen project in San Juan Province, Argentina. Malbex’s interest in the Del Carmen Project has been transferred to a newly formed entity jointly owned by wholly owned subsidiaries of Malbex and Barrick. While the Joint Venture Company is initially 5% owned by Barrick and 95% owned by Malbex, Barrick has the option, but not the obligation, to earn in to a 51%, and then a 75%, interest in the Del Carmen Project by meeting certain expenditure requirements contained in the shareholders’ agreement governing the Joint Venture Company. Effective as of the closing of the Private Placement, Barrick is also the operator of the Del Carmen Project responsible for managing, directing and controlling operations at the project. For further information regarding the earn in arrangement please refer to Malbex’s news release dated April 22, 2014.
 

About Malbex

 

Malbex is a gold exploration company led by experienced management and directors with projects in Argentina. In April 2010, Malbex made a near-surface, gold-silver oxide discovery at the Del Carmen Project, its lead project in Argentina.
 

The Del Carmen Project is located in the El Indio Gold Belt, which contains more than 35 million ounces of gold in current reserves and past production, including Barrick’s Veladero mine and Pascua-Lama project.

Posted August 29, 2014

Share this news article

MORE or "UNCATEGORIZED"


Koryx Copper Intersects 338.61 Meters At 0.38% Cu Eq Including 230.61 Meters At 0.45% Cu Eq and Multiple 2 Meters Intersections Over 1.00% Cu Eq

Significant copper and molybdenum intersections include: HM09: 13... READ MORE

May 15, 2024

Aya Gold & Silver Reports Q1-2024 Results; Maintains Guidance; Zgounder Expansion on Track

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

May 15, 2024

Silver Mountain Delivers Positive Preliminary Economic Assessment For Its Reliquias Project, Peru; Pre-Tax NPV 5% Of C$107 million, Pre-Tax IRR Of 57%, And Payback Of 1.8 Years

Key Highlights – Preliminary Economic Assessment Pre-Tax Net Pr... READ MORE

May 15, 2024

ARIS MINING REPORTS Q1 2024 RESULTS WITH SEGOVIA GENERATING $13.8 MILLION IN OPERATING CASH FLOW

Aris Mining Corporation (TSX: ARIS) (NYSE-A: ARMN) announces its ... READ MORE

May 15, 2024

Orla Mining Reports First Quarter 2024 Results

Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) announces the results fo... READ MORE

May 15, 2024

Copyright 2024 The Prospector News