The Prospector News

MAG Silver Secures US$40 Million Revolving Credit Facility

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

MAG Silver Secures US$40 Million Revolving Credit Facility

 

 

 

 

 

MAG Silver Corp. (TSX:MAG) (NYSE American: MAG) is pleased to report the signing of a binding commitment letter with the Bank of Montreal for a fully underwritten US$40 million revolving credit facility (the “Facility”). Closing of the Facility is expected to occur by mid-December 2021 and is subject to the satisfaction of customary conditions, and completion of definitive documentation.

 

The Facility has a maturity date of December 31, 2024 and will be available for working capital and general corporate purposes, and provides MAG with additional liquidity and financial flexibility for its 44% share of the Juanicipio development and exploration costs should it be needed.

 

“We are very pleased to enter into a credit relationship with BMO, a leading financial institution in Canada,” said Mr. George Paspalas, President and CEO of MAG. “This $40 million facility bolsters our liquidity and increases our financial strength as we ramp up at Juanicipio and transition to commercial production.”

 

About MAG Silver Corp.

 

MAG Silver Corp. is a Canadian development and exploration company focused on becoming a top-tier primary silver mining company by exploring and advancing high-grade, district scale, silver-dominant projects in the Americas. Its principal focus and asset is the Juanicipio Project (44%), being developed with Fresnillo Plc (56%), the operator. The project is located in the Fresnillo Silver Trend in Mexico, the world’s premier silver mining camp, where Fresnillo as operator, is currently developing an underground mine and constructing a 4,000 tonnes per day processing plant expected to be commissioned by the end of 2021. Underground mine production of development material commenced in Q3 2020, and an expanded exploration program is in place targeting multiple highly prospective targets at Juanicipio. MAG is also executing a multi-phase exploration program at the Deer Trail 100% earn-in project in Utah.

 

Posted November 15, 2021

Share this news article

MORE or "UNCATEGORIZED"


VIZSLA SILVER AGREES TO ACQUIRE NEWLY CONSOLIDATED PAST-PRODUCING SILVER DISTRICT IN THE EMERGING SILVER-GOLD-RICH PANUCO - SAN DIMAS CORRIDOR IN MEXICO

Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) i... READ MORE

March 28, 2024

Additional Drill Results Highlighted by Hole D-380 in Block 6 at Oko West, Intersecting 39.7 m Grading 5.27 g/t Au Including 2.8 m @ 14.18 g/t Au and 13.0 m Grading 10.50 g/t Au

Reunion Gold Corporation (TSX-V: RGD) (OTCQX: RGDFF) is pleased t... READ MORE

March 28, 2024

STLLR Gold’s Tower Gold Project Infill Drilling Continues to Confirm Mineralization at the Jonpol Deposit

STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) announces ... READ MORE

March 28, 2024

Hudbay Provides Annual Reserve and Resource Update and Production Outlook

Consolidated copper production is expected to average 153,000i to... READ MORE

March 28, 2024

Aya Gold & Silver: Record 2023 Production, Revenue and Operating Cash Flow

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

March 28, 2024

Copyright 2024 The Prospector News