The Prospector News

Lithium Ionic Secures Offtake Agreements with Leading Integrated Lithium Producers, Including One of the World’s Largest Lithium Hydroxide Producers, for Bandeira Project Production

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lithium Ionic Secures Offtake Agreements with Leading Integrated Lithium Producers, Including One of the World’s Largest Lithium Hydroxide Producers, for Bandeira Project Production

 

 

 

 

Five-year agreements with US$1,000t floor price, no discount to spot pricing and full upside exposure to support Project financing

 

Lithium Ionic Corp. (TSXV: LTH) (OTCQX: LTHCF) (FSE: H3N) is pleased to announce that it has executed binding multi-year offtake agreements with each of Sichuan Yahua Industrial Group Co., Ltd.  and Grand Chen Resources Pte. Ltd. two leading global lithium-ion battery materials producers, for the supply of high-quality spodumene concentrate from its Bandeira Lithium Project in Minas Gerais, Brazil.

 

Highlights

  • Lithium Ionic will supply a combined 170,000 tonnes per annum of spodumene concentrate under five-year binding take-or-pay offtake agreements to Yahua Group and Grand Chen, two integrated counterparties serving tier-one battery and EV manufacturers, including BYD and other leading OEMs.
  • Minimum price of US$1,000/t (6% spodumene concentrate grade basis, or “SC6”) with no maximum price limit, reflecting a highly competitive pricing structure that provides downside protection while maintaining full exposure to lithium price upside.
  • Pricing indexed to prevailing market prices, with no discount to the applicable market reference price, reflecting the strength and expected commercial quality of the Bandeira Project.
  • US$20 million combi ned pre-payment facility associated with the offtake agreements, aligned with the Project’s advancement toward construction.
  • Agreements materially enhance project bankability and strengthen the Company’s position as it advances project financing toward a potential construction decision.

 

Blake Hylands, P.Geo., CEO of Lithium Ionic, commented, “We are very pleased to be partnering with Yahua Group and Grand Chen – two highly capable and globally established participants in the lithium supply chain, and Tier-1 suppliers to leading battery and electric vehicle manufacturers. Their commitment to the Bandeira Project is a strong endorsement of both the quality of our asset and our ability to deliver high-quality spodumene concentrate into global markets. The commercial terms of these agreements reflect the strength of the Project and the growing demand fo r reliable new sources of lithium supply. With offtake now secured, we are well positioned to advance project financing and move Bandeira toward a construction decision.”

 

The execution of these offtake agreements represents a significant milestone in the advancement of the Bandeira Project and provides strong third-party validation of its quality and strategic importance within the rapidly growing global lithium supply chain.

 

Yahua and Grand Chen are established participants in the global lithium supply chain, with integrated downstream conversion and supply into tier-one battery and electric vehicle supply chains, including BYD, Tesla, CATL and LG Energy Solution. The counterparties have existing working relationships with members of the Lithium Ionic development team, including RTEK International (see April 2, 2025, press release for further details), providing continuity and supporting efficient execution as the Bandeira Project advances toward financing and development. Their downstream integration and conversion capabilities further strengthen the marketability of Bandeira concentrate and support competitive commercial terms as the Project progresses toward production.

 

In connection with the offtake agreements, Yahua Group and Grand Chen have agreed to provide the Company with an aggregate amount of US$20 million in pre-payment facilities. The facilities are subject to the execution of definitive agreements on market-standard terms and is expected to ali gn with the advancement of the Bandeira Project toward a construction decision.

 

About Yahua Group

 

Yahua Group is one of the world’s largest lithium hydroxide producers and a leading global lithium chemicals company with a vertically integrated platform spanning resource development, refining, and supply to major battery and electric vehicle manufacturers. The company maintains a diversified international resource base across China, Africa, and Australia and supplies lithium chemicals to tier-one customers including Tesla, CATL, LG Energy Solution, BMW and BYD. Further strengthening its downstream positioning, Yahua has partnered with LG Energy Solution to develop a lithium hydroxide conversion facility in Morocco, targeting approximately 50,000 tonnes per annum of battery-grade production to serve European and North American markets.

 

About Grand Chen

 

Grand Chen is a vertically integrated participant in the global lithium supply chain, with capabilities spanning resource acquisition, processing, and supply to battery and electric vehicle manufacturers. Since its establishment in 2013, the company has built an international presence across Africa and Asia, supported by strategic partnerships with state-owned enterprises and industrial groups. Grand Chen maintains established commercial relationships with downstream customers, including BYD, and its processing capabilities and diversified sourcing strategy support consistent access to high-quality feedstock, positioning the company as a reliable counterparty in the global battery materials market.

About Lithium Ionic Corp.

 

Lithium Ionic is a Canadian lithium dev elopment company focused on responsibly advancing it’s 100%-owned Bandeira Lithium Project in Minas Gerais, Brazil, a region coined the “Lithium Valley” that is emerging as a world-class hard-rock lithium district. The Company is executing on a focused development strategy centered on engineering de-risking, permitting advancement, commercial planning, and construction readiness, with the goal of becoming a near-term producer of high-quality spodumene concentrate for global battery supply chains.

Qualified Persons

 

The contents of this news release has been reviewed and approved by Blake Hylands, CEO and director of Lithium Ionic, who is a “qualified persons” as defined by NI 43-101. Mr. Hylands is not considered independent of the Company.

Posted March 25, 2026

Share this news article

MORE or "UNCATEGORIZED"


GoldHaven Closes $1.72 Million First Tranche Flow-Through Financing to Fund 2026 Drill Program Targeting High-Grade at Magno Project

GoldHaven Resources Corp. (CSE: GOH) (OTCQB: GHVNF) (FSE: 4QS) is... READ MORE

March 25, 2026

Brixton Metals Drills 82,334 g/t Silver (2,647 Ounces Per Tonne Silver) Over 0.5m within 11.35m of 4,560 g/t Silver at its Langis Project

Brixton Metals Corporation (TSX-V: BBB) (OTCQX: BBBXF) is pleased... READ MORE

March 25, 2026

Koryx Copper Announces Updated Mineral Resource Estimate for the Haib Copper Project, Southern Namibia

2,090,000 MTS OF CONTAINED Cu (Indicated Resource) and 1,385,000 ... READ MORE

March 25, 2026

PAN GLOBAL REPORTS 29.8 G/T GOLD OVER 3.0 METERS AT PROVIDENCIA AND COMMENCES FOLLOW-UP DRILL PROGRAM, CÁRMENES PROJECT, SPAIN

29.8 g/t gold over 3.0 meters within 6.0 meters grading 15.0 g/t ... READ MORE

March 25, 2026

Copyright 2026 The Prospector News