The Prospector News

Lithium Ionic reports initial drill results from Itira incl. 1.19% Li2O over 9m and 1.64% Li2O over 6m; and infill drill results from Bandeira incl. 1.44% Li2O over 7m and 1.59% Li2O over 6m, Minas Gerais, Brazil

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lithium Ionic reports initial drill results from Itira incl. 1.19% Li2O over 9m and 1.64% Li2O over 6m; and infill drill results from Bandeira incl. 1.44% Li2O over 7m and 1.59% Li2O over 6m, Minas Gerais, Brazil

 

 

 

 

 

Lithium Ionic Corp. (TSX-V: LTH) (OTCQB: LTHCF) (FSE: H3N) reports initial assay results from Itira, as well as infill drilling results from Bandeira. These are two targets presently being drilled within the Company’s large portfolio of properties which cover 14,182 hectares in the emerging, prolific lithium-producing region in northern Minas Gerais State, Brazil. Bandeira and Itira are located approximately 8 kilometres from each other in the same district where CBL’s Cachoeira mine has been producing lithium for +30 years, and recent producer Sigma Lithium operates the Grota do Cirillo project, which hosts the largest hard rock lithium deposit in the Americas (see Figure 1 location map).

 

Itira Exploration Drilling Intercept Highlights (see Figure 2 and Table 1):

  • 1.19% Li2O over 8.9m (hole EXDD-23-011)
  • 1.64% Li2O over 5.9m (hole EXDD-23-010)

 

Bandeira Infill Drill Intercept Highlights (see Figure 3 and Table 2):

  • 1.44% Li2O over 6.9m (hole ITDD-23-137)
  • 1.59% Li2O over 5.9m (hole ITDD-23-132)
  • 1.85% Li2O over 5m (hole ITDD-23-144)
  • 2.24% Li2O over 3.1m (hole ITDD-23-134)
  • 1.01% Li2O over 7.1m (hole ITDD-23-138)

 

Blake Hylands, P.Geo., Chief Executive Officer of Lithium Ionic, commented, “Itira is a large property covering over 3,100 hectares and located just a few kilometres from our Outro Lado deposit. While we are encouraged by the few strong intersections obtained so far, there are several other planned drill targets which show very strong potential, including the northern portion of the property which returned soil anomalies with the highest lithium values. Numerous outcropping spodumene-bearing pegmatites have been identified on the property and further confirmed by sampling trenches, and these will methodically be drill tested in the coming months. Itira drilling is progressing on a similar track to the start at Bandeira, whereby the technical team is developing the geological model with the early drill holes, and this will guide the exploration program as the project progresses. Our drill program at Bandeira is progressing well as we continue to improve drill spacing to upgrade the classification of our mineral resources in an updated mineral resource estimate we plan to deliver along with a Preliminary Economic Assessment in the coming months.”

 

The results announced today are part of a 50,000-metre expansion and definition drilling program underway for H2 2023, following the release of an initial mineral resource estimate in late June 2023 at the Bandeira and Outro Lado deposits of 7.57 million tonnes grading 1.40% lithium oxide (“Li2O”) of Measured and Indicated and 11.86Mt grading 1.44% Li2O of Inferred resources (see press release dated June 27, 2023). The Company is focused on rapidly advancing its Bandeira and Outro Lado lithium deposits (Itinga Project) towards production, while it continues to define and expand regional targets. 13 drills are currently operating at four different drill sites. Project engineering is underway by independent Brazilian consultant, GE21 Consultoria Mineral Ltda., with a PEA expected in the coming months. Concurrently, WSP (formerly Golder) is expected to complete an Environmental Impact Assessment for the Itinga Project by year-end, which will enable the Company to initiate the environmental licensing process.

 

Figure 1. Location Map Showing Lithium Ionic’s 14,182 Land Package

Figure 2: Itira Drill Result Highlights

 

Figure 3. Bandeira Drill Result Highlights and Nearby Lithium Mines/Deposits

 

Table 1. Itira Drill Results

 

Hole ID Az Dip From To Metres Li2O (%)
EXDD-23-001 0 -90 nsv
EXDD-23-002 100 -50 39.98 45.53 5.55 1.09
incl.     39.98 43.98 4.00 1.29
EXDD-23-003 120 -50 nsv
EXDD-23-004 120 -50 nsv
EXDD-23-005 120 -50 126.84 129.98 3.14 1.60
EXDD-23-006 0 -90 89.82 92.84 3.02 1.41
EXDD-23-007 0 -90 nsv
EXDD-23-008 120 -50 89.78 92.78 3.00 0.69
EXDD-23-009 0 -90 47.49 48.29 0.80 2.90
and 150 -84 109.07 110.15 1.08 0.77
EXDD-23-010 120 -50 164.43 169.00 4.57 1.02
and     191.40 196.10 4.70 1.64
and     205.04 207.04 2.00 1.30
EXDD-23-011 120 -50 184.93 193.80 8.87 1.19
EXDD-23-012 120 -50 114.59 115.72 1.13 0.66
EXDD-23-013 120 -50 Assays Pending
EXDD-23-014 120 -50 nsv
EXDD-23-015 0 -90 nsv
EXDD-23-016 120 -65 nsv
EXDD-23-017 0 -90 nsv
EXDD-23-018 100 -55 132.46 134.71 2.25 0.94
EXDD-23-019 100 -75 nsv
EXDD-23-020 0 -90 nsv

Table 2. Bandeira Drill Results

 

Hole ID Az Dip From To Metres Li2O (%)
ITDD-23-130 150 -72 88.49 91.08 2.59 1.15
and 150 -68 240.32 242.41 2.09 1.46
ITDD-23-131 150 -85 99.48 101.88 2.40 1.67
and 150 -80 274.94 278.00 3.06 1.33
ITDD-23-132 150 -77 69.51 72.73 3.22 1.66
and 0 -90 166.14 169.88 3.74 1.36
and 150 -50 172.68 178.59 5.91 1.59
ITDD-23-133 150 -54 150.20 154.79 4.59 1.20
ITDD-23-134 150 -76 32.45 34.95 2.50 2.43
and     138.85 141.96 3.11 2.24
ITDD-23-135 150 -65 121.85 123.46 1.61 1.74
and     136.02 137.59 1.57 2.96
ITDD-23-136 150 -50 Pending
ITDD-23-137 150 -90 81.68 85.18 3.5 1.48
and 182.18 183.7 1.52 0.92
and 185.16 187.28 2.12 1.35
and 189.8 196.65 6.85 1.44
ITDD-23-138 150 -79 289.52 296.62 7.10 1.01
ITDD-23-139 150 -82 Pending
ITDD-23-140 0 -90 28.83 30.62 1.79 1.22
ITDD-23-141 0 -90 39.98 43.98 4.00 1.36
and     47.25 51.61 4.36 0.63
ITDD-23-142 150 -68 Pending
ITDD-23-143 150 -66 Pending
ITDD-23-144 150 -79 82.50 82.98 0.48 2.34
and 94.46 99.42 4.96 1.85

About Lithium Ionic Corp.

 

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its flagship Itinga and Salinas projects cover 14,182 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. The Itinga Project is situated in the same region as CBL’s Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

 

Quality Assurance and Control

 

During the drill program, assay samples were taken from NQ core and sawed in half. One-half was sent for assaying at SGS Laboratory, a certified independent commercial laboratory, and the other half was retained for results, cross checks, and future reference. A strict QA/QC program was applied to all samples. Every sample was processed with Drying, crushing from 75% to 3 mm, homogenization, quartering in Jones, spraying 250 to 300 g of sample in steel mill 95% to 150. SGS laboratory carried out multi-element analysis for ICP90A analysis.

 

Qualified Persons

 

The technical information in this news release has been prepared by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, and both are “qualified persons” as defined in NI 43-101.

 

Posted August 24, 2023

Share this news article

MORE or "UNCATEGORIZED"


Kobo Resources Intersects 7.0 Metres at 4.83 g/t Au in Strong Initial Results at the Jagger Zone from Resumed 2024 Diamond Drilling Program at its Kossou Gold Project

Jagger Zone continues to show strong potential for high-grade gol... READ MORE

October 3, 2024

Scorpio Gold Announces Close of Oversubscribed $2.5 Million Private Placement

Scorpio Gold Corporation (TSXV: SGN) (OTCQB: SRCRF) (FSE: RY9) is... READ MORE

October 3, 2024

Class 1 Nickel Updates Resource Estimate on High-Grade Dundonald South Nickel Sulphide Deposit – Significant Increase Over 2020 Resource Estimate

Class 1 Nickel and Technologies Ltd. (CSE: NICO) (OTCQB: NICLF) i... READ MORE

October 3, 2024

Goliath Closes Final Tranche Of Non-Brokered Private Placement For Aggregate Proceeds Of $16,120,500 Including Several Strategic Cornerstone Purchasers Acquiring Shares

Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE: B4IF)... READ MORE

October 3, 2024

Gladiator Assays 10.8m at 4.31% CuEq Within 45m at 1.76% CuEq and Drills 8m @ 3.72% CuEq Within 109.77m @ 1.05% CuEq at Cowley Park

Highlights Gladiator has completed a further 32 diamond drill hol... READ MORE

October 3, 2024

Copyright 2024 The Prospector News