Liberty Gold Reports Strong Phase 5A Column Leach Metallurgical Results at Black Pine, Confirming Consistent Oxide Gold Recoveries Across Newly Tested Zones

 

 

 

 

 

80.6% weighted average gold extraction from 24 column leach tests

 

Liberty Gold Corp. (TSX: LGD; OTCQX: LGDTF) is pleased to report results from its Phase 5A metallurgical program at the Company’s Black Pine Oxide Gold Project in southeast Idaho. The new results confirm consistent, robust gold recoveries across previously untested areas, supporting the feasibility development of a run-of-mine heap leach processing flowsheet at Black Pine.

 

Highlights

  • Consistent Gold Extractions and Leach Performance: Weighted average column leach gold extraction of 80.6%, with individual composites reaching up to 90.8%, demonstrating metallurgical continuity across multiple mineralized zones; all of the Phase 5A composites tested exhibit the typical Black Pine leach result of greater than 80% of the eventual gold extraction achieved in under 10 days.
  • Corroborated Bottle Roll Data: Gold and silver extractions from coarse crush bottle roll tests strongly correlate with column leach results, 78.9% vs 80.6%, respectively, in line with previous metallurgical results.
  • De-risking Project Development: Phase 5A column tests reinforce the suitability of ROM heap leach processing and provide key inputs into the ongoing feasibility study metallurgical model.
  • Expanded Metallurgical Coverage: Phase 5A testing included composites from Back Range and J Zone, areas not previously tested and variability composites infilling previous sampling in the M Zone, Tallman and F zones.
  • Ongoing Programs: Phase 5B (additional variability infill composites) results are expected in Q3, 2025, Phase 7 (cut-off-grade (“COG”) composites) results expected in Q4, 2025 and Phase 6 (bulk samples) and Phase 8 (legacy heap facility (“HLF”) sonic drilling composites) expected in early H1, 2026.

 

Jon Gilligan, President and CEO, Liberty Gold, commented, “These results further demonstrate that Black Pine’s oxide gold mineralization is highly amenable to ROM heap leaching, including areas outside the main deposit zones. As we advance toward the completion of our feasibility study, this growing metallurgical dataset will help optimize processing parameters, underpin robust project economics, and reduce technical risk.”

 

Phase 5A Metallurgical Test Summary

 

The Phase 5A program was designed to expand the metallurgical dataset into areas not previously tested and fill gaps in the main deposit areas, confirming consistency of recoveries across the broader mineralized footprint. See Figure 1 below for Phase 5A variability composite metallurgical drill core locations. Metallurgical composites were made from PQ sized core drilled in 2023. A total of 24 column leach tests were completed under standard test conditions for Black Pine oxide gold mineralized material, with results summarized below in Table 1.

 

Figure 1 – Summary map of Black Pine Metallurgical Program Sample Locations

 

 Table 1 – Weighted Average Gold Extraction Results by Zone – Coarse Bottle Roll and Column Leach Tests

 

 

Zone Average Calculated
Head Grade Au (ppm)
Weighted Average Bottle
Roll Gold Recovery (%)
P80
Weighted Average Column
Leach Gold Recovery (%)
P80
Back Range Zone 1.68 80.7% 81.9%
J Zone 0.59 78.9% 78.0%
Tallman Zone 0.63 75.8% 81.1%
M Zone 0.58 77.3% 81.1%
F Zone 0.42 67.0% 67.3%
All Zones   78.9% 80.6%

 

Notes: Average Calculated Head Grade is the average of the composite column head grades tested within each zone. Detailed sample-level results are provided in Table 2 below.

 

Silver

 

Column leach tests also showed silver extractions ranging from 13.7% to 72.3%. Silver grades and extractions in M-Zone and Back Range appear higher than other mineralized areas at Black Pine. Silver grades and extractions for J Zone, Tallman and F Zone are in line with results from previous metallurgical test phases. Historic production of silver was in the approximate ratio of ~0.4 ounces of silver for every ounce of gold. Liberty Gold is currently evaluating adding silver to the resource estimate in the feasibility study.

 

Interpretation

  • Phase 5A gold extractions are in line with previous metallurgical testing across the main mineralized zones.
  • The strong correlation between bottle roll and column leach data validates process predictability and supports a simple, low-cost ROM leach processing flowsheet for Black Pine oxide ores.
  • These results further de-risk the processing strategy ahead of the feasibility study.

 

Ongoing Metallurgical Program

 

Liberty Gold has an active feasibility-level metallurgical program:

  • Phase 5B: Twenty-one “infill” variability composites from Rangefront and Discovery Zone have completed column leaching and final results are expected in Q3, 2025.
  • Phase 6: Seven (Six in-pit and one surface) 20 tonne ROM surface bulk samples sourced from the main mineralized lithology types, will be tested in Pilot-Scale columns (4 feet diameter x 20 feet high) at Kappes, Cassiday & Associates (“KCA”) in Reno. Three bulk samples are currently under leach and the remaining four are in sample collection and preparation. Results are expected in H1 2026.
  • Phase 7: Nine cut-off grade variability composites currently under column leach.
  • Phase 8: 24 sonic drill holes (~1,400 meters) have been completed in the legacy heap leach pad, with initial gold assays received. Metallurgical studies and composites are currently being planned. It is expected that test work will commence in late Q3, 2025. This material will be tested for the potential to act as over-liner material and also as direct leach feed.

 

These programs are designed to finalize gold leach recoveries and optimize process design criteria as inputs to the Feasibility Study targeted for completion in Q4, 2026.

 

Quality Assurance – Quality Control

 

All metallurgical work at Black Pine was conducted at KCA Labs in Reno and is supervised by Gary Simmons, MMSA, formerly Director of Metallurgy and Technology for Newmont Mining Corp. Mr. Simmons has managed metallurgical programs on multiple Carlin-style oxide deposits in the Great Basin.

 

Peter Shabestari, P.Geo., Vice President Exploration, Liberty Gold, is the Qualified Person responsible for reviewing and approving the technical content of this release.

 

 

Table 2 Phase 5A Gold Extraction Results

 

Sample ID Test Area Bottle Roll %
Extraction
Calculated
Head Grade
Au (ppm)
Column Leach
% Au Ext
Calculated
Head Grade
Au (ppm)
98104 B Backrange 66.6 0.433 64.3 0.412
98105 A Backrange 83.9 2.143 85.5 2.107
98106 A Backrange 80.9 5.039 80.1 4.689
98107 B Backrange 86.8 1.167 89.6 1.116
98107 A Backrange 75.3 0.347 76.5 0.306
98108 B Backrange 64.1 0.381 61.8 0.340
98110 B Backrange 83.6 3.983 85.4 4.682
98111 B Backrange 75.4 1.372 79.6 1.355
98112 A Backrange 48.4 0.173 37.6 0.125
98113 A J Zone 78.6 0.562 81.2 0.527
98114 B J Zone 62.7 0.417 64.7 0.337
98115 A J Zone 79.9 1.057 81.0 0.919
98116 A J Zone 86.0 0.836 column abandoned
98117 B Tallman 70.4 0.492 81.0 0.400
98118 B Tallman 65.6 0.342 71.0 0.276
98119 A Tallman 81.0 1.191 83.5 1.204
98120 A M Zone 64.2 0.735 73.6 0.747
98121 B M Zone 73.9 0.263 82.6 0.242
98122 A M Zone 83.4 0.509 86.6 0.461
98123 B M Zone 68.7 0.321 72.8 0.309
98124 B M Zone 82.2 0.859 77.5 0.883
98125 B M Zone 84.9 0.779 90.8 0.840
98126 B F Zone 69.3 0.849 67.3 0.837
98127 B F Zone 56.2 0.245 56.1 0.244
98128 A F Zone 71.6 0.165 81.8 0.187
 Averages 78.9% 0.986 ppm Au 80.6% 0.981 ppm Au

Footnote: ppm = parts per million or grams per tonne (g/t)

 

ABOUT LIBERTY GOLD

 

Liberty Gold is focused on developing open pit oxide deposits in the Great Basin of the United States, home to large-scale gold projects that are ideal for open-pit mining. This region is one of the most prolific gold-producing regions in the world and stretches across Nevada and into Idaho and Utah. The Company is advancing the Black Pine Project in southeastern Idaho, a past-producing, Carlin-style gold system with a large, growing resource and strong economic potential. We know the Great Basin and are driven to advance big gold deposits that can be mined profitably in open-pit scenarios and in an environmentally responsible manner.

 

Posted August 19, 2025

Share this news article

MORE or "UNCATEGORIZED"


Americas Gold and Silver Reports High-Grade 149 Vein Extension Including 24,913 g/t Silver and 16.9% Copper at Galena Complex and Effective Date of Share Consolidation

Americas Gold and Silver Corporation (TSX: USA) (NYSE American: U... READ MORE

August 23, 2025

XXIX Announces Closing of $6.0 Million Financing

XXIX Metal Corp. (TSX-V: XXIX) is pleased to announce that it has... READ MORE

August 23, 2025

GRAPHITE ONE ANNOUNCES CLOSING OF C$13.3 MILLION BROKERED LIFE OFFERING

Graphite One Inc. (TSX-V: GPH) (OTCQX: GPHOF) is pleased to annou... READ MORE

August 22, 2025

Kuya Silver Reports Second Quarter 2025 Results; Continued Progress at Bethania Silver Project with Increased Mining Output, Significant Underground Development, and Encouraging Exploration Results

Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) is... READ MORE

August 22, 2025

Abcourt Accepts $5.8M Financing Offer from Investissement Québec

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to anno... READ MORE

August 22, 2025

Copyright 2025 The Prospector News