The Prospector News

Laramide’s Churchrock Uranium Project and La Jara Mesa Uranium Project Designated for FAST-41 Covered Project Status

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Laramide’s Churchrock Uranium Project and La Jara Mesa Uranium Project Designated for FAST-41 Covered Project Status

Laramide Resources Ltd. (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF) is pleased to announce that two of its advanced-stage uranium development projects in the United States, Crownpoint-Churchrock (New Mexico) and La Jara Mesa (New Mexico), have been designated FAST-41 Covered Projects by the Federal Permitting Improvement Steering Council (Permitting Council).

This designation, part of the federal infrastructure permitting initiative established under Title 41 of the Fixing America’s Surface Transportation Act, reflects the projects’ strategic importance and supports an efficient, transparent federal review process.

Notably, the La Jara Mesa Project has been upgraded from a FAST-41 Transparency Project to a fully Covered Project, aligning its permitting status with Crownpoint-Churchrock and streamlining its path forward under U.S. federal oversight.

Marc Henderson, President and CEO of Laramide Resources Ltd., said:
“We commend the Trump administration for the Executive Order announced on May 23, supporting the acceleration of nuclear energy development in the United States. As momentum builds around a new era for nuclear power, it is important to recognize that uranium is the fundamental starting point of the entire fuel cycle. 

“Our Crownpoint-Churchrock project is one of the largest undeveloped uranium deposits in the U.S. and has the potential to play a central role in securing a domestic supply of this critical mineral. The inclusion of our projects under FAST-41 is a meaningful step, but continued policy support will be essential to overcome the longstanding regulatory and permitting challenges that have constrained U.S. uranium production. We are encouraged by this progress and proud to be part of a national effort to rebuild the nuclear fuel cycle from the ground up.”

About Crownpoint-Churchrock

The Crownpoint-Churchrock Uranium Project is Laramide Resources’ flagship U.S. asset and one of the largest undeveloped uranium resources in the United States. Located in McKinley County, New Mexico, the project comprises two in-situ recovery-amenable uranium deposits, Crownpoint and Churchrock, collectively covered under a U.S. Nuclear Regulatory Commission license, and the renewal application for this is currently in process.

About La Jara Mesa

The La Jara Mesa Uranium Project is a significant development-stage asset owned by Laramide Resources Ltd., situated in the prolific Grants Mineral Belt of Cibola County, New Mexico. This sandstone-hosted uranium deposit lies approximately 10 miles northeast of the town of Grants, within the Mount Taylor Ranger District of the Cibola National Forest. Laramide has been actively progressing through the permitting process. The U.S. Forest Service is preparing an Environmental Impact Statement in accordance with the National Environmental Policy Act to assess the development of an underground uranium mine and associated surface facilities.

Qualified/Competent Person

The information in this announcement relating to Mineral Resource Estimates is based on information compiled or reviewed by Mr. Rhys Davies, a contractor to the Company. Mr. Davies is a Member of The Australasian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’, and is a “Qualified Person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Davies consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

To learn more about Laramide, please visit the Company’s website at www.laramide.com.

 

About Laramide Resources Ltd.

Laramide is focused on exploring and developing high-quality uranium assets in Tier-1 uranium jurisdictions. The company’s portfolio comprises predominantly advanced uranium projects in districts with historical production or superior geological prospectivity. The assets have been carefully chosen for their size and production potential, and the two large development projects are considered to be late-stage, low-technical risk projects.  As well, Laramide has expanded its pipeline with strategic exploration in Kazakhstan where the company is exploring over 5,500 km2 of the prolific Chu-Sarysu Basin for world class roll-front deposits which are amenable to in-situ recovery.

Posted June 2, 2025

Share this news article

MORE or "UNCATEGORIZED"


PTX Metals Inc. Announces Second Closing of Private Placement

PTX Metals Inc. (TSX-V: PTX) is pleased to announce the closing of the second tranche (with an addit... READ MORE

October 2, 2025

Lion One Produces 5,704 Tonnes at 10.60 g/t Gold from First Shrinkage Stope at Tuvatu and Increases Underground Development Rates by 70%

Lion One Metals Limited (TSX-V: LIO) (OTCQX: LOMLF) is pleased to provide an update on mining opera... READ MORE

October 2, 2025

ESGold Secures C$9 Million Strategic Partnership with Ocean Partners as Montauban Progress Accelerates

ESGold Corp. (CSE: ESAU) (OTCQB: ESAUF) (FSE: Z7D) is pleased to announce it has entered into a bind... READ MORE

October 2, 2025

Erdene Announces Updated Resource for the Zuun Mod Molybdenum-Copper Deposit

Erdene Resource Development Corp. (TSX:ERD) (MSE:ERDN) (OTCQB:ERDCD) is pleased to announce a... READ MORE

October 2, 2025

Copper Giant Achieves Up To 92% Copper And 97% Molybdenum Recoveries In Latest Metallurgical Testwork At Mocoa

Copper Giant Resources Corp. (TSX-V: CGNT) (OTCQB: LBCMF) (FRA: 29H0) announces results from i... READ MORE

October 2, 2025

Copyright 2025 The Prospector News