The Prospector News

LAHONTAN SUBMITS NOTICE OF INTENT FOR ADDITIONAL DRILLING AT SANTA FE

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

LAHONTAN SUBMITS NOTICE OF INTENT FOR ADDITIONAL DRILLING AT SANTA FE

 

 

 

 

 

Lahontan Gold Corp. (TSX-V:LG) (OTCQB:LGCXF) is pleased to announce that it has submitted an amended Notice of Intent to the Federal Bureau of Land Management for additional exploration and resource definition drilling at its Santa Fe Mine project located in Nevada’s prolific Walker Lane gold belt.  The NOI proposes eight additional drill sites from which multiple drill holes can be completed.  The amended NOI provides planning flexibility for the upcoming drill program, adding additional sites to those already permitted.  The Company expects approval of the NOI shortly.

 

Ms. Kimberly Ann, Lahontan Gold Executive Chair, President, CEO, and Founder commented: “Lahontan is eager to begin its 2025 exploration and resource definition drilling program at Santa Fe.  Our geologic team has identified several areas in the Slab and York resource areas where carefully targeted drilling can add geologic data and also provide material for additional metallurgical test work.  The Company expects to mobilize a drill rig soon after we receive approval of the NOI from the BLM”.

 

About Lahontan Gold Corp

Lahontan Gold Corp. is a Canadian mine development and mineral exploration company that holds, through its US subsidiaries, four top-tier gold and silver exploration properties in the Walker Lane of mining friendly Nevada. Lahontan’s flagship property, the 26.4 km2 Santa Fe Mine project, had past production of 359,202 ounces of gold and 702,067ounces of silver between 1988 and 1995 from open pit mines utilizing heap-leach processing*. The Santa Fe Mine has a Canadian National Instrument 43-101 compliant Indicated Mineral Resource of 1,539,000 oz Au Eq (grading 0.99 g/t Au Eq) and an Inferred Mineral Resource of 411,000 oz Au Eq (grading 0.76 g/t Au Eq), all pit constrained (Au Eq is inclusive of recovery, please see Santa Fe Project Technical Report*). The Company plans to continue advancing the Santa Fe Mine project towards production, update the Santa Fe Preliminary Economic Assessment, and drill test its satellite West Santa Fe project during 2025. For more information, please visit our website: www.lahontangoldcorp.com

* Please see the “Preliminary Economic Assessment, NI 43-101 Technical Report, Santa Fe Project”, Authors: Kenji Umeno, P. Eng., Thomas Dyer, PE, Kyle Murphy, PE, Trevor Rabb, P. Geo, Darcy Baker, PhD, P. Geo., and John M. Young, SME-RM; Effective Date: December 10, 2024, Report Date: January 24, 2025. The Technical Report is available on the Company’s website and SEDAR+.

Posted May 6, 2025

Share this news article

MORE or "UNCATEGORIZED"


Southern Silver Initiates Infill Drilling on the Puro Corazon Target, Cerro Las Minitas Project, Durango Mexico

Southern Silver Exploration Corp. (TSX-V: SSV) reports that crews... READ MORE

June 18, 2026

Amex Exploration Completes Final Tranche of C$80 Million Private Placement

Amex Exploration Inc. (TSX-V: AMX) (FSE: MX0) (OTCQX: AMXEF) is p... READ MORE

June 18, 2026

Mercado Minerals Intersects 1.20 Metres of 1120 g/t Silver Equivalent Within 3.50 Metres of 686 g/t Silver Equivalent at El Agua Vein Copalito Project

Mercado Minerals Ltd. (CSE: MERC) (OTCQB: MRMNF) announces furthe... READ MORE

June 18, 2026

Xali Gold Private Placement Fully Subscribed

Xali Gold Corp. (TSX-V:XGC) is pleased to announce that the previ... READ MORE

June 18, 2026

STLLR Gold Intersects 13.00 g/t Au over 22.75 m and 3.01 g/t Au over 22.93 m at the Jonpol Deposit of the Tower Gold Project

STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) reports add... READ MORE

June 18, 2026

Copyright 2026 The Prospector News