The Prospector News

LAHONTAN REPORTS PROGRESS ON SANTA FE PLAN OF OPERATION

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

LAHONTAN REPORTS PROGRESS ON SANTA FE PLAN OF OPERATION

 

 

 

 

 

Lahontan Gold Corp. (TSX-V:LG) (OTCQB:LGCXF) is pleased to provide an update on its Exploration Plan of Operations for the Santa Fe Mine project that was submitted to the U.S. Bureau of Land Management in November, 2024.  Based on a recent meeting with BLM personnel, the Company expects the BLM to issue a formal completeness determination for the EPOO, allowing the permitting process to enter the NEPA phase  shortly.  Final approval of the EPOO remains on track for late 2025.  In the interim, Lahontan can continue exploration drilling at the Santa Fe Mine under a Notice of Intent and on its patented mining claims.

Kimberly Ann, Lahontan Gold Corp CEO, Chair, and Founder commented: “Lahontan is pleased with the progress that the BLM has made with its review of the Santa Fe Mine EPOO.  When approved, the EPOO will permit up to 750 drill holes at Santa Fe, allowing the Company to unlock the exploration potential of the project. In the meantime, Lahontan will be able to continue resource expansion and metallurgical drilling programs under a NOI, continuing to advance Santa Fe towards mine development”.

Of the eight environmental baseline reports in the EPOO, the BLM had no comments on four reports (Biology, Social and Economic Values, Paleontology, Visual Resources). The Company has addressed BLM comments on three of the baseline reports (Raptors, Surface Hydrology, Air Quality) and will submit a response to BLM comments on the Cultural Resources report this week.  Lahontan is looking forward to a Finding of No Significant Impact (“FONSI”) and formal approval of the EPOO late this year.

 

About Lahontan Gold Corp

Lahontan Gold Corp. is a Canadian mine development and mineral exploration company that holds, through its US subsidiaries, four top-tier gold and silver exploration properties in the Walker Lane of mining friendly Nevada. Lahontan’s flagship property, the 26.4 km2 Santa Fe Mine project, had past production of 359,202 ounces of gold and 702,067ounces of silver between 1988 and 1995 from open pit mines utilizing heap-leach processing*. The Santa Fe Mine has a Canadian National Instrument 43-101 compliant Indicated Mineral Resource of 1,539,000 oz Au Eq (grading 0.99 g/t Au Eq) and an Inferred Mineral Resource of 411,000 oz Au Eq (grading 0.76 g/t Au Eq), all pit constrained (Au Eq is inclusive of recovery, please see Santa Fe Project Technical Report*). The Company plans to continue advancing the Santa Fe Mine project towards production, update the Santa Fe Preliminary Economic Assessment, and drill test its satellite West Santa Fe project during 2025.

Posted March 18, 2025

Share this news article

MORE or "UNCATEGORIZED"


Gold Candle to Acquire Pan American Silver’s Larder Property, Further Enhancing Its Presence in the Abitibi

Acquisition Adds Indicated Gold Resources of 388koz and Inferred ... READ MORE

May 8, 2026

Scorpio Gold Drills 0.62 G/T Gold Over 62.21 Metres From 230.43 Metres Within Manhattan Caldera, at Black Mammoth

Highlights • Hole 26MN-069 returned: o 0.62 g/t gold over 62.21... READ MORE

May 8, 2026

Wheaton Precious Metals Announces Record Revenue, Earnings and Cash Flow for the First Quarter of 2026

“Wheaton delivered a strong start to 2026, with Salobo and... READ MORE

May 8, 2026

Vior Gold Corporation Intersects 12.8 g/t Au Over 2.0 Meters and 5.45 g/t Au Over 3.0 Meters

VIOR GOLD CORPORATION INC. (TSX-V: VIO) (OTCQB: VIORF) (FRA: VL5)... READ MORE

May 7, 2026

One Bullion Reports Gravity-Finish Assay Results at Vumba Project, Including 30.8 g/t Au, and Receives EIA Approval for Maitengwe Project

Gravity-Finish Re-Assay Confirms High-Grade Gold Mineralization a... READ MORE

May 7, 2026

Copyright 2026 The Prospector News