The Prospector News

Imperial Reports Production Update for Red Chris Mine 2026 Second Quarter

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Imperial Reports Production Update for Red Chris Mine 2026 Second Quarter

 

 

 

 

 

Imperial Metals Corporation  (TSX:III) reports copper and gold production for the second quarter 2026 from Red Chris mine. Red Chris metal production (100%) for the second quarter of 2026 was 17.924 million pounds copper and 14,591 ounces gold. Both copper and gold production were down compared with the second quarter of 2025, with copper production down 24% and gold production down 36%. Imperial’s 30% share of Red Chris mine production was 5.377 million pounds copper and 4,377 ounces gold.

 

 

      Three Months Ended June 30    
Red Chris Mine Production (100%)          
      2026 2025    
Ore milled – tonnes      2,155,695 2,393,788    
Ore milled per calendar day – tonnes     23,689 26,305    
Grade % – copper     0.45 0.55    
Grade g/t – gold     0.35 0.49    
Recovery % – copper     83.8 81.4    
Recovery % – gold     59.4 60.0    
Copper – million pounds     17.924 23.479    
Gold – ounces     14,591 22,624    
             

 

Red Chris metal production (100%) for the second quarter of 2026 was 17.924 million pounds copper and 14,591 ounces gold, compared to 23.479 million pounds copper and 22,624 ounces gold produced during the same quarter of 2025. The decrease in copper production was a result of an 18% decrease in copper grade (0.45% versus 0.55%) with higher recovery and lower throughput. The decrease in gold production was a result of lower gold grade in the mill feed (0.35 g/t gold versus 0.49 g/t gold) and lower throughput, with similar gold recovery (59.4% versus 60.0%) compared to the same quarter last year.

 

Both copper and gold production remain on track to achieve the budgeted 2026 production, and the guidance for 2026 Red Chris production (100%) remains 60 – 66 million pounds of copper and 47,500 – 52,500 ounces of gold.

 

The Red Chris feasibility study for a block cave expansion operation is advancing. The key permits are in hand with approval from both the Province of British Columbia and Tahltan First Nation. Completion of the feasibility study and, subject to the study outcomes, joint venture approval are expected in the second half of 2026.

 

Steve Robertson, P. Geo., Imperial’s Vice President Corporate Development, has reviewed the above disclosures contained in this news release and is the designated Qualified Person as defined by National Instrument 43-101.

 

About Imperial

 

Imperial is a Vancouver based exploration, mine development and operating company with holdings that include the Mount Polley mine (100%), the Huckleberry mine (100%), and the Red Chris mine (30%). Imperial also holds a portfolio of 20 greenfield exploration properties in British Columbia.

 

Posted July 24, 2026

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News