Gunnison Copper Reports Third Quarter 2026 Financial and Operational Results

You have opened a direct link to the current edition PDF

Open PDF Close
Slider

Share this news article

Gunnison Copper Reports Third Quarter 2026 Financial and Operational Results

 


Gunnison Copper Corp.
(NYSE American: GUNN) (TSX: GCU) (OTCQB: GCUMF) (FSE: 3XS0), an American copper producer headquartered in Phoenix, Arizona, announces its financial and operational results for the three and nine months ended September 30, 2026. All dollar amounts are in U.S. dollars and prepared in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board.

 

Highlights Q3 2026

  • Generated US$36.1 million in revenue during the third quarter, representing a 53% increase over Q2 2026, as copper production and sales continued to increase at the Johnson Camp Mine. The Company reported net income of US$12.7 million, or US$0.03 per share, for the quarter.
  • Achieved commercial production at Johnson Camp in September 2026, following record monthly copper production in August and sustained operating performance through September. Copper cathode production increased 71% quarter-over-quarter to approximately 3.42 million pounds, while copper cathode sales increased 46% to approximately 3.31 million pounds.
  • Expanded the Johnson Camp Stage 2 mine plan in partnership with Rio Tinto’s Nuton, adding approximately 3 million tons of mineralized material expected to be mined between 2027 and 2029. The revised agreement included an additional US$8 million payment from Nuton to Gunnison, for use on Gunnison Project advancement and general corporate purposes, subsequently received in October 2026.
  • Advanced the flagship Gunnison Copper Project Technical Study, including district-wide drilling, metallurgical testing, resource expansion and conversion, engineering and technical studies. The drilling program comprises up to 120 holes totaling approximately 138,000 feet (42,000 metres).
  • Submitted an application to amend the Mined Land Reclamation Plan for the flagship Gunnison Copper Project in September 2026, representing an important milestone in advancing the state-led permitting process for the proposed open-pit operation.
  • Strengthened the Company’s leadership team, including the appointment of Bjorn Meyer as Chief Operating Officer in June and Jennifer Hays as Chief Financial Officer, effective October 12, 2026.
  • Strengthened the Company’s balance sheet and eliminated its remaining convertible debt, following the September 30, 2026 conversion of the outstanding Triple Flag convertible debenture. This milestone follows the earlier settlement of the Nebari and Greenstone debt obligations, positioning Gunnison as a debt-free U.S. copper producer and developer.

 


Subsequent to Quarter End

  • Commenced trading on the NYSE American under the ticker symbol “GUNN” on October 26, 2026, expanding access to U.S. institutional and retail investors and increasing the Company’s visibility in the American capital markets.
  • Welcomed U.S. Secretary of the Interior Doug Burgum and other other distinguished guests to Johnson Camp on October 20, 2026, highlighting the Company’s domestic copper production and the potential contribution of its flagship Gunnison Copper Project to American supply chains supporting defense, super intelligence, technology and manufacturing.
  • Announced plans to award equity to eligible permanent employees, reinforcing Gunnison’s People First culture and aligning employees with the Company’s long-term success.
  • Received the US$8 million payment from Nuton on October 15, 2026, pursuant to the revised Stage 2 mine plan agreement announced in September.
  • Appointed Andre Lauzon to the Board of Directors, bringing more than 30 years of mining industry experience, including senior operational leadership at Hudbay Minerals.

 


Upcoming Milestones

  • Johnson Camp: Continue ramp-up following the achievement of commercial production, targeting nameplate production of 25 million pounds of copper cathode annually by year-end 2026.
  • Gunnison Project Drilling: Continue the district-wide drilling and metallurgical testing program, with additional results expected to support resource expansion, mineral resource conversion and processing optimization.
  • Technical Study: Advance engineering, metallurgical testing, mine planning and technical studies, with the final Technical Report targeted for the second half of 2028.
  • Permitting: Advance the MLRP amendment, with approval targeted before year-end 2026, and progress the remaining state permit amendments required for open-pit development, targeting receipt of all amendments in the second half of 2028.

 


Financial and Operational Results

The following table summarizes selected financial and operational information for the Company for the third quarter ended September 30, 2026:

Selected Quarterly Metrics Units Q1 2026 Q2 2026 Q3 2026 YTD
Mineralized material mined Short tons 655,510 1,392,559 1,948,056 3,996,125
Copper grade stacked % 0.356% 0.558% 0.617% 0.536%
Copper cathode produced lbs. 2,106,583 2,006,315 3,423,948 7,536,846
Revenue US$ 000’s 20,104 23,612 36,134 79,850
Copper cathode sales revenue US$ 000’s 10,796 13,733 21,295 45,824
Costs of production US$ 000’s (8,717) (7,380) (12,343) (28,440)
Income from mine operations US$ 000’s 11,387 16,232 23,791 51,410
Net income US$ 000’s 1,666 13,101 12,739 27,506
EPS US$/share 0.004 0.03 0.03 0.06

Note: Financial information is presented in US dollars. Figures may be subject to rounding.

 

 

For the three months ended September 30, 2026, Gunnison generated US$36.1 million in revenue, compared with US$2.9 million in the corresponding period of 2025, reflecting increased copper production and sales following the restart and ramp-up of Johnson Camp. Revenue included US$21.3 million from copper cathode sales and US$14.7 million of deferred mining and processing demonstration service revenue.

The Company reported net income of US$12.7 million, or US$0.03 per share, compared with a net loss of US$22.9 million, or US$0.06 per share, in the third quarter of 2025.

Johnson Camp produced approximately 3.42 million pounds of copper cathode during Q3 2026, an increase of 71% compared with Q2 2026. Copper cathode sales totaled approximately 3.31 million pounds, at an average realized price of US$6.41 per pound, compared with 2.26 million pounds at US$6.07 per pound in the preceding quarter.

The Company continued to improve operating efficiencies as production increased. SX/EW unit costs decreased to US$0.56 per pound of copper produced, compared with US$0.76 per pound in Q2 2026, reflecting improved fixed-cost absorption as production volumes increased.

For the nine months ended September 30, 2026, the Company generated US$79.9 million in revenue and net income of US$27.5 million, or US$0.06 per share, compared with revenue of US$3.5 million and a net loss of US$46.8 million, or US$0.13 per share, in the corresponding period of 2025.

Reported net income included non-cash fair value adjustments associated with the Nuton Stage 2 payable and copper stream derivative liabilities.

At September 30, 2026, Gunnison had US$23.5 million in cash and cash equivalents, including US$16.1 million of non-Nuton cash and US$7.4 million of Nuton-related cash.

The financial information in this release was selected from the Company’s condensed consolidated interim financial statements and MD&A for the three and nine months ended September 30, 2026, which is available on SEDAR+, EDGAR and the Company’s website.

 

ABOUT GUNNISON COPPER

Gunnison Copper Corp. is a multi-asset pure-play copper developer and producer that controls the Cochise Mining District, containing 12 known deposits within an 8 km economic radius, in the Southern Arizona Copper Belt.

Its flagship asset, the Gunnison Copper Project, has a main pit Measured and Indicated Mineral Resource containing over 846 million tons with a total copper grade of 0.33% containing 5.19 billion pounds of copper (Measured Mineral Resource of 192 million tons at 0.37% containing 1.42 billion pounds of copper and Indicated Mineral Resource of 655 million tons at 0.31% containing 3.77 billion pounds of copper).

The Strong & Harris satellite deposit, located approximately 1.9 miles from the Gunnison processing facilities, is also included in the mine plan and hosts an Inferred Mineral Resource of 76 million tons grading 0.49% total copper (0.32% CuOx) at a 0.07% cutoff, 0.56% zinc and 0.12 oz/ton silver, containing approximately 740 million pounds of copper, including 483 million pounds of oxide copper, as well as zinc (856 million pounds) and silver (9.0 million ounces).

A preliminary economic assessment was completed in March 2026 for the Gunnison Project yielding robust economics including an NPV8% of $2 billion, IRR of 22.5%, and payback period of 3.9 years. It is being developed as a conventional operation with open pit mining, heap leach, and SX/EW refinery to produce finished copper cathode on-site with direct rail link. The PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the conclusions reached in the PEA will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

In addition, Gunnison’s Johnson Camp Asset, which is now in production, is fully funded by Nuton LLC, a Rio Tinto Venture, with a production capacity of up to 25 million lbs of finished copper cathode annually.

Other significant deposits controlled by Gunnison in the district, with potential to be economic satellite feeder deposits for Gunnison Project infrastructure, include South Star, and eight other deposits.

For more information on the Company, please visit our website at www.GunnisonCopper.com.

For additional information on the Gunnison Project please refer to the technical report titled “Gunnison Project NI 43-101 Technical Report, Preliminary Economic Assessment, Cochise County, Arizona, USA” with an effective date of March 18, 2026 filed on SEDAR+ at www.sedarplus.ca.

For additional information on the Johnson Camp Mine please refer to the technical report titled “Johnson Camp Mine NI 43-101 Technical Report, Cochise County, Arizona, USA” with an effective date of March 18, 2026 filed on SEDAR+ at www.sedarplus.ca.

Dr. Roland Goodgame, Senior VP of Project Development of the Company is a Qualified Person as defined by NI 43-101. Dr. Goodgame has reviewed and approved the technical information contained in this news release.

 

For further information regarding this press release, please contact:

Gunnison Copper Corp.
Concord Place, Suite 300, 2999 North 44th Street, Phoenix, AZ, 85018

Melissa Mackie
T: 647.533.4536
E: info@GunnisonCopper.com
www.GunnisonCopper.com

Posted November 13, 2026

Share this news article

MORE or "SLIDER"


Silver Market Set for Sixth Consecutive Annual Deficit in 2026: Industrial Silver Demand Outside Photovoltaics Forecast to Grow by 4.5%

The global silver market is forecast to record its sixth consecutive annual deficit in 2026, with de... READ MORE

November 13, 2026

First Canadian Graphite Closes Over-Subscribed Financing

First Canadian Graphite Inc. (TSX-V:FCI)(OTCQB:GRAPF) is pleased to announce that it has received su... READ MORE

November 13, 2026

Denarius Metals Announces Third Quarter and First Nine Months 2026 Financial Results

Denarius Metals Corp. (Cboe CA: DMET) (OTCQX: DNRSF) announced today that it has filed its un... READ MORE

November 13, 2026

Prospector Podcast - Koby Kushner: Athena Gold Scooby Zone Gold Discovery Near Red Lake

In this episode of the Prospector Podcast, host Michael Fox speaks with ... READ MORE

November 12, 2026

Copyright 2026 The Prospector News