The Prospector News

Guanajuato Silver Reports Increased Production in Q2

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Guanajuato Silver Reports Increased Production in Q2

 

 

 

 

 

6th Consecutive Quarter of Record Production

 

Guanajuato Silver Company Ltd. (TSX-V:GSVR) (AQUIS:GSVR) (OTCQX:GSVRF) is pleased to announce consolidated production results for the three months ended June 30, 2023. Production results are generated from the Company’s wholly owned El Cubo Mines Complex, Valenciana Mines Complex, and San Ignacio Mine  in Guanajuato, Mexico, and the Topia Mine in Durango, Mexico.

 

Q2 2023 Production Highlights

  • Record production during the quarter of 941,338 silver-equivalent ounces derived from 477,650 ounces of silver; 4,719 ounces of gold; 875,802 pounds of lead; and 897,258 pounds of zinc.
  • The development of the El Condor Tunnel Project at the Topia mine has accessed the Argentina vein in an area that previous operators had not reached; the new tunnel opens up the potential for additional mineralized material that would sit in close proximity to the mill. The Argentina vein is the most important producing vein system in the district and has been the primary structure mined at Topia for the past 40 years. The nearby Santa Cruz vein was also accessed with the El Condor tunnel, and both veins are currently being drilled with results being collected and analyzed.
  • Underground hydraulic fill tailings system successfully realized at the VMC; tailings material continues to be deposited underground in one of the numerous voids that have been created over Valenciana’s 450-year mining history.
  • The Cata Shaft at VMC is now fully integrated into mining operations; for the month of June, over 5,000 tonnes of mineralized material were hoisted to surface through this shaft. The shaft, together with a new underground locomotive system, has reduced haulage costs from the lower levels and reduced the wear and tear on trucks, tires, and ramps.
  • The recovery of high-grade mine pillars has now begun at VMC and this program of pillar extraction is expected to grow over the coming months (see GSilver news release dated July 11, 2023 – “Guanajuato Silver Targets High-Grade Pillars at the Valenciana Mines Complex“).

 

James Anderson, Chairman & CEO, said, “We are proud to announce our sixth consecutive quarter of increased precious metals production; we expect this trend to continue as we head into the second half of the year. During Q1 and Q2, we have implemented a number of efficiency upgrades that are now poised to generate significant improvements to production grades and volumes, as we look to optimize mine production at all four of our producing silver mines. Furthermore, we continue to pursue additional opportunities to grow our production portfolio as we move towards becoming Mexico’s next mid-tier silver producer.”

  1. Silver equivalents are calculated using an 81.33:1 (Ag/Au), 0.04:1 (Ag/Pb) and 0.05:1 (Ag/Zn) ratio for Q2 2023 and an 83.78:1 (Ag/Au), 0.04:1 (Ag/Pb) and 0.06:1 (Ag/Zn) ratio for Q1 2023; respectively.

 

Q2 2023 Mine Operations Continues Trend of Overall Quarter over Quarter Production Increases:

  • Consolidated mine production increased 2.5% in Q2 2023 to 166,171 tonnes mined, as compared to 162,116 tonnes mined in Q1 2023.
  • Consolidated silver production increased 4% to 477,650 ounces in Q2 2023 compared to 458,803 ounces in Q1 2023; similarly, consolidated gold production increased by 7% to 4,719 ounces over the same period; however, overall lead and zinc production at Topia decreased by 3.4% and 22.2%, respectively, in Q2 2023 from Q1 2023 primarily due to a shift to targeting mineralized material that contained higher grades of silver and gold versus base metals.
  • Consolidated silver-equivalent production in Q2 2023 was higher by 3,291 ounces over the previous quarter; this increase reflects the continuing ramp-up of operations at all of Guanajuato Silver’s mining assets.
  • Average recoveries for silver, gold and lead increased to 84.9%, 83.1% and 87.4% respectively in Q2 2023 from Q1 2023, although average recoveries for zinc dropped from 83.5% in Q1 2023 to 78.1% in Q2 2023 primarily due to lower grade throughput of zinc.

 

About Guanajuato Silver

 

GSilver is a precious metals producer engaged in reactivating past producing silver and gold mines in central Mexico. The Company produces silver and gold concentrates from the El Cubo Mines Complex, Valenciana Mines Complex, and the San Ignacio mine; all three mines are located within the state of Guanajuato, which has an established 480-year mining history. Additionally, the Company produces silver, gold, lead, and zinc concentrates from the Topia mine in northwestern Durango. With four operating mines and three processing facilities, Guanajuato Silver is one of the fastest growing silver producers in Mexico.

 

Technical Information

 

Reynaldo Rivera, VP of Exploration of GSilver, has approved the scientific and technical information contained in this news release. Mr. Rivera is a member of the Australasian Institute of Mining and Metallurgy (AusIMM – Registration Number 220979) and a “qualified person” as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects.

 

Posted July 14, 2023

Share this news article

MORE or "UNCATEGORIZED"


Atico Produces 3.73 Million Pounds of Cu and 2,874 Ounces of Au in Second Quarter 2024

Atico Mining Corporation (TSX-V: ATY) (OTCQX: ATCMF) announces it... READ MORE

July 19, 2024

Lithium Ionic Completes US$20 Million Royalty Agreement with Appian Capital

Lithium Ionic Corp. (TSX-V: LTH) (OTCQX: LTHCF) (FSE: H3N) is ple... READ MORE

July 19, 2024

Golden Cariboo Intersects New Discovery with Multiple Examples of Visible Gold in Each of Three Drill Holes at the Halo Zone 830m from the Quesnelle Gold Quartz Mine

Golden Cariboo Resources Ltd. (CSE: GCC) (OTC: GCCFF) (WKN: A402C... READ MORE

July 18, 2024

North Bay Resources Acquires Mt. Vernon Gold Mine, Sierra County, California, with Assays up to 4.8 oz. Au per Ton

North Bay Resources Inc. (OTC: NBRI) is pleased to announce it ha... READ MORE

July 18, 2024

Entrée Resources Announces Additional Drill Results and Provides an Update on Underground Development Work

Entrée Resources Ltd. (TSX:ETG) (OTCQB:ERLFF)  is pleased to pr... READ MORE

July 18, 2024

Copyright 2024 The Prospector News