The Prospector News

Great Panther Reports Second Quarter 2022 Production Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Great Panther Reports Second Quarter 2022 Production Results

 

 

 

 

 

Great Panther Mining Limited (TSX: GPR) (NYSE-A: GPL), a growth-oriented precious metals producer focused on the Americas, reports production results for the three months ended June 30, 2022, from its two wholly-owned operating mines, Tucano in Brazil and Topia in Mexico.

 

Second Quarter 2022 Production Highlights

  • Consolidated metal production of 20,187 gold equivalent ounces, inclusive of 16,889 gold ounces and 159,529 silver ounces
  • Total gold production at Tucano of 16,629 Au oz
  • Total silver equivalent production at Topia of 266,893 silver equivalent ounces

 

“The second quarter was transformational for Great Panther with the announcement of the agreement to sell our Mexican assets,” stated Alan Hair, Chair and Interim CEO of Great Panther. “Divesting these assets allows us to channel our resources towards the Tucano Gold Mine where we believe the most value can be created for investors and other stakeholders. Production from Tucano during the quarter was in line with expectations as we position the mine for a return to steady-state production. Heavy stripping activity over the last number of quarters has prepared numerous pits for increased production of ore in the second half of the year, which we believe will result in improving production results in the quarters to come.”

 

Consolidated Operating Results

 

Consolidated Operating Results Q2 2022 Q1 2022 Change Q2 2022 Q2 2021 Change
Ore processed (tonnes) 887,435 889,365 0 % 887,435 929,430 -5 %
Gold eq production (oz) (1) 20,187 17,913 13 % 20,187 27,722 -27 %
Gold production (oz) 16,889 14,319 18 % 16,889 22,804 -26 %
Silver production (oz) 159,529 173,698 -8 % 159,529 334,423 -52 %
(1) Gold equivalent ounces for 2022 were calculated using a 1:75 Au:Ag ratio, and ratios of 1:0.0005 and 1:0.0007 for the price/ounce of gold to price/pound of lead and zinc, respectively, consistent with the Company’s guidance for the year. Gold equivalent ounces for 2021 were calculated using a 1:85 Au:Ag ratio, and ratios of 1:0.0005 and 1:0.0006 for the price/ounce of gold to price/pound of lead and zinc, respectively, consistent with the Company’s guidance for the year.

 

The Company’s operations are on track to meet previously announced consolidated production guidance for 2022 of 100,000 to 119,000 Au eq oz. The mine plan for Tucano reflects more stripping in the first half of 2022 with the second half of 2022 expected to account for at least 65% of annual gold production guidance. Annual consolidated production guidance is subject to the sale of the Mexican silver assets and will be revisited once the transaction is complete.

 

Tucano

 

Tucano Operating Results Q2 2022 Q1 2022 Change Q2 2022 Q2 2021 Change
Total material mined (tonnes) 7,716,376 4,372,726 76 % 7,716,376 5,678,601 36 %
Total waste mined (tonnes) 7,425,215 4,004,733 85 % 7,425,215 5,466,688 36 %
Ore mined (tonnes) 291,160 232,213 25 % 291,160 211,913 37 %
Ore processed (tonnes milled) 870,199 873,133 0 % 870,199 873,433 0 %
Au grade (g/t) 0.69 0.57 21 % 0.69 0.81 -15 %
Au recovery (%) 86 % 87 % -1 % 86 % 89 % -3 %
Gold production (oz) 16,629 14,037 18 % 16,629 20,284 -18 %
Carbon fines gold recovery nil% 412 -100 %
Total gold production (oz) 16,629 14,037 18 % 16,629 20,696 -20 %

 

Total mined tonnage increased by 76% compared to Q1 2022 and 36% compared to Q2 2021 due to having two mining contractors, U&M and MINAX, operating in parallel throughout different pits. Mined ore tonnage and gold grades during the second quarter were higher compared to the first quarter of 2022. This improvement is related to ore lenses in the different pits being already accessed as per mine sequence.

 

Production from Tucano during this second quarter was in line with expectations as stripping continued to advance in preparation for accessing main ore lenses and consequently better grades in the second half of 2022. Gold production in Q2 2022 was 16,629 oz compared with 14,037 Au oz in Q1 2022, an increase of 18%, and 20,696 Au oz in Q2 2021, a decrease of 20%.

 

Topia

 

Topia Operating Results Q2 2022 Q1 2022 Change Q2 2022 Q2 2021 Change
Ore mined (tonnes) 17,022 16,258 5 % 17,022 15,533 10 %
Ore milled (tonnes) 17,236 16,232 6 % 17,236 15,520 11 %
Ag grade (g/t) 315 362 -13 % 315 432 -27 %
Au grade (g/t) 0.74 0.84 -12 % 0.74 1.07 -31 %
Ag recovery (%) 92 % 92 % 0 % 92 % 94 % -2 %
Au recovery (%) 64 % 64 % 0 % 64 % 60 % 7 %
Silver eq production (oz) (1) 266,893 290,694 -8 % 266,893 312,259 -15 %
Silver production (ounces) 159,529 173,698 -8 % 159,529 201,339 -21 %
Gold production (ounces) 260 282 -8 % 260 321 -19 %
Lead production (tonnes) 336 365 -8 % 336 357 -6 %
Zinc production (tonnes) 480 525 -9 % 480 478 0 %
Gold eq production (oz) (2) 3,559 3,876 -8 % 3,559 3,674 -3 %
(1) Silver equivalent ounces for 2022 were calculated using an 75:1 Ag:Au ratio, and ratios of 1:0.041 and 1:0.056 for the price/ounce of silver to price/pound of lead and zinc, respectively, consistent with the Company’s guidance for the year. Silver equivalent ounces for 2021 were calculated using an 85:1 Ag:Au ratio, and ratios of 1:0.041 and 1:0.049 for the price/ounce of silver to price/pound of lead and zinc, respectively, consistent with the Company’s guidance for the year.
(2) See footnote (1) under the heading Consolidated Operating Results above for information on the calculation of gold equivalent ounces for 2022 and 2021, respectively.

 

Silver equivalent production at Topia in Q2 2022 was 266,893 Ag eq oz compared with 312,259 Ag eq oz in Q2 2021, a decrease of 15%, and 290,694 Ag eq oz in Q1 2022, a decrease of 8%, primarily due to lower gold and silver grades. These factors were partly offset by higher gold recovery and the increase in production attributed to the change in metal equivalency ratios for zinc.

 

Guanajuato Mine Complex

 

The Guanajuato Mine Complex is currently on care and maintenance. Consequently, there was no production at the GMC during Q2 2022.

 

On June 29, 2022, the Company announced that it has entered into a Share Purchase Agreement to sell 100% of the Company’s Mexican subsidiary Minera Mexicana El Rosario S.A. de C.V. which holds the GMC, the Topia mine, and the El Horcón and Santa Rosa projects, all located in Mexico. The sale of MMR is expected to close in the third quarter of 2022.

 

Tucano Exploration Update

 

During the quarter, the resource conversion drill program for the Urucum North underground project was completed and an updated resource estimate is currently being developed. In parallel, the Company has started trade-off studies for ramp development and mining methods in parallel with engineering and metallurgical project work while planning activities are underway. The permitting process has also started with the State Environmental Agency, SEMA. Project development including the update of mineral resources and reserves is on track to be completed by the fourth quarter of this year.

 

Regional target definition, validation and subsequent prioritization is currently underway in consultation with GoldSpot Discoveries Corp. This project commenced in June and results are expected in early August. Portable drills have been contracted and drilling is expected to begin in August upon completion of the GoldSpot study. The Company expects to drill between 2,500 to 3,500 metres as part of the regional program.

 

Technical Disclosure

 

The technical information contained in this news release has been reviewed and approved by Fernando A. Cornejo, P. Eng., Chief Operating Officer, a non-independent Qualified Person for the purposes of National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

 

ABOUT GREAT PANTHER

 

Great Panther is a growth-oriented precious metals producer focused on the Americas. The Company owns a portfolio of assets in Brazil, Mexico and Peru that includes three gold and silver mines, an advanced development project and a large land package with district-scale potential. Great Panther is focused on creating long-term stakeholder value through safe and sustainable production, reinvesting into exploration and pursuing acquisition opportunities to complement its existing portfolio.

 

Posted July 21, 2022

Share this news article

MORE or "UNCATEGORIZED"


Flying Nickel Enters Into an Amended and Restated Arrangement Agreement to Sell Its Minago Assets

Flying Nickel Mining Corp. (TSX-V: FLYN) (OTCQB: FLYNF) is please... READ MORE

September 18, 2024

Big Ridge Gold Corp Closes $1.5 Million Private Placement, Announces Michael Gentile Increases Holdings to 9.9%

Big Ridge Gold Corp. (TSX-V: BRAU) (OTCQB: ALVLF) is pleased to a... READ MORE

September 18, 2024

First Phosphate Reports Initial Mineral Resource Estimate on its Bégin-Lamarche Phosphate Deposit in the Saguenay-Lac-Saint-Jean Region of Québec, Canada

First Phosphate Corp (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is pleas... READ MORE

September 18, 2024

LaFleur Minerals Completes Mineral Resource Estimate for the Swanson Property in the Abitibi Greenstone Belt, Québec

LaFleur Minerals Inc. (CSE: LFLR) (OTC Pink: WPNNF) is pleased to... READ MORE

September 18, 2024

Foran Closes Second Tranche of $360M Private Placement for Additional Gross Proceeds of $71M

Foran Mining Corporation (TSX: FOM) (OTCQX: FMCXF) is pleased to ... READ MORE

September 17, 2024

Copyright 2024 The Prospector News