The Prospector News

Graycliff Expands the Width and Breadth of the Mineralized Zone at Shakespeare

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Graycliff Expands the Width and Breadth of the Mineralized Zone at Shakespeare

 

 

 

Graycliff Exploration Limited  (CSE: GRAY) (OTCQB: GRYCF) (FSE: GE0) is pleased to release the next batch of assay results from the Phase Four drilling program at the Shakespeare Gold Project located on the Canadian Shield near Sudbury, Ontario. Phase Four drilling focused on testing the boundaries of the mineralized zone, both along strike and at depth.

 

Drill Hole J-52 intersected 14.39 grams per tonne of gold over 3.0 metres, including 41.00 g/t Au over 1.0 m. Additionally, J-53 intersected 5.35 g/t Au over 5.0 m, including 21.40 g/t Au over 1.0 m. Significant intervals for Holes J-52 to J-53 are detailed below.

 

Table 1 – Highlighted Gold Assay Results from Holes J-52 to J-53

 

Drill Hole From (m) To (m) Width (m)1 Au (g/t) 2
J-52 175.0 178.0 3.00 14.39
including
176.0 177.0 1.00 41.00
J-53 173.0 174.0 1.00 1.31
180.0 185.0 5.00 5.35
including
180.0 181.0 1.00 21.40
196.0 197.0 1.00 1.58

 

1 Reported intervals are down-hole lengths and not true thicknesses. True width of the mineralization cannot be determined due to the early-stage nature of the current program.
2 Length-weighted average grades are calculated using un-capped gold assay data.

 

James Macintosh, Graycliff’s President and CEO, stated: “Drill Hole J-52 was drilled to the northeast and expanded the width and breadth of the mineralization zone. Hole J-53 intersected three anomalous intervals at depth of over 150 m from surface within a 25 m section of the hole. Given the intersection of high grades over the strike as well as depth drilled to date, we feel it’s time for us to initiate preliminary metallurgical sample test work. Our team will complete one or several drill holes of large diameter to collect material for the anticipated work. This should become an important step in moving the Shakespeare Project forward.”

 

Qualified Person

 

Bruce Durham, P.Geo., is a Qualified Person, as that term is defined by Canadian regulatory guidelines under NI 43-101, and has read and approved the technical information contained in this press release.

 

About Graycliff Exploration Limited

 

Graycliff Exploration is a mineral exploration company focused on its 1,025 hectares of prospective ground, located roughly 80 kilometres west of Sudbury on the prolific Canadian Shield. The Company’s Shakespeare Project consists of one crown patented lease, two crown leases and 40 claims on a property associated with the historic Shakespeare Gold Mine, which operated from 1903 to 1907. Graycliff’s Baldwin Project is adjacent to the east and is comprised of 68 claims covering 1,500 hectares.

 

 

 

Posted October 11, 2022

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News