The Prospector News

GoGold Reports Quarterly Production at Parral of 375,745 Silver Equivalent Ounces

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

GoGold Reports Quarterly Production at Parral of 375,745 Silver Equivalent Ounces

 

 

 

 

 

GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) is pleased to report production for the quarter ending March 31, 2024 of 375,745 silver equivalent ounces, consisting of 138,657 silver ounces, 2,184 gold ounces, 93 tonnes of copper, and 92 tonnes of zinc. With the SART Zinc circuit commissioning completed, this marks the first quarter where Parral produced a saleable zinc product.

 

“Now that the SART Zinc circuit’s commissioning has been completed and is operational, we are seeing an increase in the leaching of gold and silver, in addition to the production of a saleable zinc and copper product. We anticipate further increases in silver and gold production over the coming months as the extraction of zinc and copper from the heap leach solution improves the precious metal leachability in the heap,” Brad Langille, President and CEO stated. “At Los Ricos South, we continue to advance our definitive feasibility study, which we are anticipating completion this summer. With the gains realized from the SART plant at Parral, along with the significant metal price increase, Parral, as planned, is becoming a contributor to the future funding of the Los Ricos South project.”

 

Table 1: Quarterly Production Summary

 

Quarter Ended Dec 2022 Mar 2023 Jun 2023 Sep 2023 Dec 2023 Mar 2024
Silver Production (oz) 159,838 173,717 203,894 169,443 109,016 138,657
Gold Production (oz) 2,399 2,016 1,512 1,106 1,848 2,184
Copper Production (tonnes) 222 143 135 115 95 93
Zinc Production (tonnes) 92
Silver Equivalent Production (oz)1 441,217 400,145 375,112 300,789 300,260 375,745
1. “Silver equivalent production” include gold ounces and copper tons produced and converted to a silver equivalent based on a ratio of the average market metal price for each period. The gold:silver ratio for each of the periods presented was: Dec 2022 – 82, Mar 2023 – 84, Jun 2023 – 82, Sep 2023 – 83, Dec 2023 – 85, Mar 2024 – 93. The copper:silver ratios were: Dec 2022 – 377, Mar 2023 – 399, Jun 2023 – 352, Sep 2023 – 356, Dec 2023 – 356, Mar 2024 – 365. The zinc:silver ratios were: Mar 2024 – 104.

 

Mr. Robert Harris, P.Eng. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release related to Parral.

 

About GoGold Resources

GoGold Resources is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality projects in Mexico. The Company operates the Parral Tailings mine in the state of Chihuahua and has the Los Ricos South and Los Ricos North exploration projects in the state of Jalisco. Headquartered in Halifax, NS, GoGold is building a portfolio of low cost, high margin projects.

 

Posted April 10, 2024

Share this news article

MORE or "UNCATEGORIZED"


Hudbay Provides Annual Reserve and Resource Update with Mine Life Extensions and Improved Three-Year Production Outlook

Hudbay Minerals Inc. (TSX:HBM) (NYSE: HBM) today released its ann... READ MORE

March 27, 2026

OREZONE GOLD COMPLETES STRATEGIC ACQUISITION OF CASA BERARDI GOLD MINE AND QUEBEC EXPLORATION PORTFOLIO AND REPORTS FOURTH QUARTER 2025 RESULTS

Strategic acquisition of an established operating gold mine, loca... READ MORE

March 27, 2026

Cerro de Pasco Resources Secures Access Agreement Over Entire Quiulacocha Tailings Area, Enabling Next Phase of Project Development

Cerro de Pasco Resources Inc. (TSX-V: CDPR) (OTCQB: GPPRF) (FRA: ... READ MORE

March 26, 2026

SAGA Metals Acquires Strategic Titanium Assets from Rio Tinto in Quebec

The Garneau Titanium Project Features Ilmenite-Rich Boulder with ... READ MORE

March 26, 2026

ValOre Reports Positive Leaching Results from Ongoing Metallurgical Program for Pedra Branca PGM Project, Brazil; 73% Platinum and 74% Palladium Achieved Extraction from Weathered Material and 66% Platinum and 79% Palladium from Chromitite;

ValOre Metals Corp. (TSX‐V: VO) (OTCQB: KVLQF) (Frankfurt: KEQ0... READ MORE

March 26, 2026

Copyright 2026 The Prospector News