The Prospector News

Globex Reports First Drill Results from Rouyn-Merger

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Globex Reports First Drill Results from Rouyn-Merger

 

 

 

 

 

GLOBEX MINING ENTERPRISES INC. (TSX:GMX) (FRA:G1MN)  (OTCQX:GLBXF) is pleased to provide shareholders with the assay results from the first two drill holes of our six-hole initial drill program in the area of the East O’Neil gold occurrence on the 100% owned Rouyn-Merger property, located east of Rouyn-Noranda Quebec, adjoining the gold localizing Cadillac Fault.

 

Hole Number RM-25-01 was drilled at an azimuth of 122o with a dip of 46o.

 

The first hole intersected 3.44 g/t Au over a 38.7 m (126.9 ft) core length of gold mineralization from 54.3 m to 93.0 m. (estimated horizontal width 32.6 m). The highest-grade mineralized intersections within the 38.7 m intersection are as follows:

 

From – To Core Length (m) & Grade (g/t Au)
54.3 m – 61.0 m 6.7 m grading 12.60 g/t Au
66.4 m – 72.7 m 6.3 m grading 4.59 g/t Au
88.0 m – 93.0 m 5.0 m grading 2.87 g/t Au

Hole Number RM-25-02 was drilled from the same setup at an azimuth of 122o but with a dip of 65o.

 

The second hole intersected 3.47 g/t Au over 26.4 m (86.6 ft) from 75.3 m to 101.7 m (estimated horizontal width 17.1 m) within 37.4 m (122.7 ft) grading 2.58 g/t Au from 75.3 m to 112.7 m (estimated horizontal width 24.0 m). The highest-grade mineralized intersections within the 26.4 m intersection are as follows:

 

From – To Core Length (m) & Grade (g/t Au)
75.3 m – 82.5 m 7.2 m grading 1.95 g/t Au
85.6 m – 89.0 m 3.4 m grading 1.34 g/t Au
95.6 m – 101.7 m 6.1 m grading 11.67 g/t Au

The vertical midpoint distance between the intersections in Hole RM-25-01 and RM-25-02 is 33 m.

 

Assaying was done by MSALABS located at 1020 Rue Léo-Fournier, Val-d’Or, QC, J9P 6X8

 

The reported assays are from the first two holes of the six-hole, 1095 m drill program completed on the Rouyn-Merger property. We are awaiting assay results from the additional four holes which we expect to receive prior to the Holidays. Once the Rouyn-Merger drill program was completed the drill was moved to Globex’s Lyndhurst Copper property north of Rouyn-Noranda to drill test a deep Titan 25 electromagnetic anomaly. Drilling is underway on the first Lyndhurst hole.

 

This press release was written by Jack Stoch, P. Geo., Executive Chairman and CEO of Globex in his capacity as a Qualified Person (Q.P.) under NI 43-101 and Pierre Riopel, P. Geo., Globex Chief Geologist in his capacity as a Qualified Person (Q.P.) under NI 43-101.

 

Posted December 9, 2025

Share this news article

MORE or "UNCATEGORIZED"


Leviathan Metals Announces Closing of $10 Million LIFE Offering

Leviathan Metals Corp. (TSX-V: LVX) (OTCQB: LVXFF) (FSE: 0GP) is pleased to announce that it has clo... READ MORE

May 20, 2026

Orezone Reports First Set Of Drill Results From Casa Berardi Mine Including16.10g/T Au Over 6.7m And 6.47g/T Au Over 21.5m

Orezone Gold Corporation (TSX: ORE) (ASX: ORE) (OTCQX: ORZCF) is pleased to announce the first set o... READ MORE

May 20, 2026

Valhalla Metals Announces Closing of First Tranche of Over-Subscribed Private Placement

Valhalla Metals Inc. (TSX-V: VMXX) (OTCQB: VMXXF) is pleased to announce that the Company has comple... READ MORE

May 20, 2026

Azimut Continues to Expand the Fortin Antimony-Gold Zone, Wabamisk Property, James Bay Region, Québec

Azimut Exploration Inc. (TSX-V: AZM) (OTCQX: AZMTF) is pleased to report the complete results of it... READ MORE

May 20, 2026

DPM Metals Reports New High-Grade Intercepts from the Chelopech Wedge Zone Deep Prospect; Expects Mineral Resource Estimate by Year-End 2026

DPM Metals Inc. (TSX: DPM) (ASX: DPM) is pleased to report results from delineation drilling at the ... READ MORE

May 20, 2026

Copyright 2026 The Prospector News