The Prospector News

Garibaldi Expands on E&L Drill Data

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Garibaldi Expands on E&L Drill Data

 

 

 

 

 

As a result of a review by the British Columbia Securities Commission, Garibaldi Resources (TSX-V: GGI) is issuing the following news release to clarify the disclosure in its news release of November 20, 2017.

 

 

In Garibaldi’s November 20, 2017, news release, the Company provided accurate assay results for the first four holes of the E&L Nickel Mountain drill program and information pertaining to a 16.7-meter nickel-copper-rich massive sulphide intercept (closely approximately true width) east of the historic E&L deposit in a new discovery zone unique to the Eskay Camp.

 

 

A map showing cross sections for those holes has already been posted to the home page of the Garibaldi web site (http://www.garibaldiresources.com/i/maps/GGI-Drill-Map-Nov-27-2017.jpg). Below are tables for drill hole coordinates as well as significant intervals that were reported November 20.

 

 

Garibaldi eagerly anticipates providing another update on the E&L Nickel Mountain program within the next several days.

 

 

Table 1: Drill hole co-ordinates for holes 1 to 4 and 14 (as per Nov. 20 NR)

 

 

 

Hole Zone Easting* Northing* Elevation (mASL) Azimuth Dip Length (m)
EL-17-01 Central 396103 6271502 1892 109 -80 441
EL-17-02 Central 396103 6271502 1892 92 -60 429
EL-17-03 Northwest 396119 6271498 1887 267 -70 252
EL-17-04 Discovery 396103 6271502 1892 111 -46 345
EL-17-14 Discovery 396292 6271502 1846 257 -47.5 252

 

*UTM Zone 9N WGS 1984

 

 

Table 2: Composite grade intervals of Ni+Cu >1% – holes 1 to 4 (as per Nov. 20 NR)

 

 

 

Hole # Interval width (from – to) Ni % Cu % Co
 %
Pt
(g/t)
Pd
(g/t)
Au
(g/t)
Ag
(g/t)
*Ni+Cu
(%)
EL-17-01 over 60.5m (51.0 – 111.5m) 0.54 0.53 0.016 0.217 0.343 0.201 2.6 1.07
Including over 1.0m (102.0 – 103.0m) 1.37 2.13 0.033 1.048 1.345 1.087 9.6 3.50
EL-17-01 over 5.23m (118 – 123.23m) 0.51 0.63 0.016 0.274 0.515 0.277 4.0 1.14
EL-17-01 over 9.68m (129 – 138.68m) 0.72 0.62 0.022 0.188 0.290 0.142 3.2 1.34
EL-17-01 over 4.5m (279.5 – 284.0m) 0.29 0.80 0.012 0.603 1.261 0.602 6.3 1.10
                   
EL-17-02 over 7.5m (117.0 – 124.5m) 0.57 0.52 0.019 0.158 0.282 0.100 3.4 1.08
EL-17-02 over 6.0m (136.5 – 142.5m) 0.37 0.74 0.014 0.483 0.602 0.470 4.6 1.12
EL-17-02 over 3.0m (150.0 – 153.0m) 0.54 0.56 0.023 0.240 0.750 0.251 2.5 1.10
EL-17-02 over 24.0m (171.0 – 195.0m) 0.56 0.65 0.020 0.282 0.597 0.264 3.3 1.21
Including over 4.5m (175.5 – 180.0m) 0.97 1.19 0.030 0.643 1.020 0.639 6.7 2.16
                   
EL-17-03 over 39.0m (42.0 – 81.0m) 0.91 0.74 0.028 0.266 0.437 0.224 3.2 1.65
Including over 13.5m (49.5 – 63.0m) 1.05 1.00 0.027 0.492 0.836 0.383 4.7 2.06
And over 3.0m (70.5 – 73.5m) 1.00 1.09 0.031 0.190 0.281 0.250 5.5 2.09
**And over 1.5m (79.1 – 80.6m) 5.72 2.12 0.205 0.470 0.696 0.209 4.4 7.84
                   
EL-17-04 over 48.2m (108.4 – 156.6m) 1.09 0.69 0.032 0.231 0.379 0.162 3.1 1.78
Including over 4.8m (150.3 – 155.1m) 7.17 3.40 0.195 0.785 0.824 0.400 10.0 10.57
EL-17-04 over 12.0m (189.0 – 201.0m) 1.08 0.68 0.034 0.260 0.487 0.183 3.5 1.75
**Including over 0.3m (195.7 – 196.0m) 3.75 1.24 0.100 0.920 1.550 0.563 4.7 4.99
**And over 0.4m (197.1 – 197.5m) 5.88 1.70 0.160 0.770 1.100 0.249 5.4 7.58

 

* combined 1% nickel-copper is a minimum threshold for comparative analysis of composites.

 

** denotes interval of massive sulphides (75-100%).

 

 

Quality Assurance/Quality Control

 

 

Garibaldi Resources has applied a rigorous quality assurance/quality control program at the E&L Nickel Mountain Project using best industry practice. All core was logged by a professional geoscientist and selected intervals were sampled. NQ2 drill core was sawn in half and each sample half was placed in a marked sample bag with a corresponding sample tag then sealed. The remaining half core is retained in core boxes that are stored at a secure facility in Smithers, British Columbia. Chain of custody of samples was recorded and maintained for all samples from the drill to the laboratory.

 

 

All diamond drilling sample batches included 5% QA/QC samples consisting of certified blanks, standards and field duplicates. Two certified ore assay laboratory standards and one blank standard were used in the process and were supplied by CDN Resource Laboratories Ltd., an independent laboratory located in Langley, British Columbia. Samples were submitted to SGS Canada Inc. in Vancouver, British Columbia, an ISO 9001: 2008 certified lab, for base metal, sulphur and precious metal analysis using Inductivity Coupled Plasma (ICP), Fire Assay (FA) and Leco methods.

 

 

Samples were prepared by crushing the entire sample to 75% passing 2mm, riffle splitting 250g and pulverizing the split to better than 85% passing 75 microns. Gold, platinum and palladium were analyzed using a 30 gram fire assay and ICP-AES. Total sulfur and total carbon were analyzed using a Leco method. Nickel, copper, cobalt, silver and base metals were analyzed by sodium peroxide fusion and ICP-MS.

 

 

The performance on the blind standards, blanks and duplicates achieved high levels of accuracy and reproducibility and has been verified by Everett Makela, a Qualified Person as defined by NI-43-101.

 

 

Qualified Person Data Verification

 

 

Mr. Everett F. Makela, P.Geo., Director/VP Exploration Canada for the Company, and a Qualified Person as defined by NI-43-101, has supervised the preparation of, reviewed and approved of, the disclosure of information in this news release. Mr. Makela has verified the data, including drilling, sampling, test and recovery data by supervising all of such procedures on site. There are no known factors that could materially affect the reliability of data collected and verified under his onsite supervision. No quality assurance/quality control issues have been identified to date.

 

 

About Garibaldi

 

 

Garibaldi Resources Corp. is an active Canadian-based junior exploration company focused on creating shareholder value through discoveries and strategic development of its assets in some of the most prolific mining regions in Mexico and British Columbia.

 

Posted November 30, 2017

Share this news article

MORE or "UNCATEGORIZED"


Koryx Copper Intersects 338.61 Meters At 0.38% Cu Eq Including 230.61 Meters At 0.45% Cu Eq and Multiple 2 Meters Intersections Over 1.00% Cu Eq

Significant copper and molybdenum intersections include: HM09: 13... READ MORE

May 15, 2024

Aya Gold & Silver Reports Q1-2024 Results; Maintains Guidance; Zgounder Expansion on Track

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

May 15, 2024

Silver Mountain Delivers Positive Preliminary Economic Assessment For Its Reliquias Project, Peru; Pre-Tax NPV 5% Of C$107 million, Pre-Tax IRR Of 57%, And Payback Of 1.8 Years

Key Highlights – Preliminary Economic Assessment Pre-Tax Net Pr... READ MORE

May 15, 2024

ARIS MINING REPORTS Q1 2024 RESULTS WITH SEGOVIA GENERATING $13.8 MILLION IN OPERATING CASH FLOW

Aris Mining Corporation (TSX: ARIS) (NYSE-A: ARMN) announces its ... READ MORE

May 15, 2024

Orla Mining Reports First Quarter 2024 Results

Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) announces the results fo... READ MORE

May 15, 2024

Copyright 2024 The Prospector News