The Prospector News

Frontier Lithium Closes $3.35 Million Convertible Loan and Completes Land Acquisition in Thunder Bay

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Frontier Lithium Closes $3.35 Million Convertible Loan and Completes Land Acquisition in Thunder Bay

Frontier Lithium (TSX-V: FL) is pleased to announce that, further to its press release dated February 25, 2025, the Company has closed (i) the previously disclosed unsecured convertible loan for aggregate proceeds of $3,350,000 and (ii) the acquisition of a vacant industrial site on Mission Island in Thunder Bay, Ontario . The Mission Island Lands, located at 1900 108th Street in Thunder Bay, Ontario, were formerly home to a coal-fired electricity generating station operated by Ontario Power Generation.

Image: “Aerial view of the Mission Island Lands, a 183-acre industrial property in Thunder Bay, Ontario.” (CNW Group/Frontier Lithium Inc.)

 

Mission Island Lands

The Mission Island Lands comprise 183 acres of heavy industrial property, including a 50-acre water lot, making it an ideal site for the Company’s proposed lithium conversion facility. The site boasts existing high-voltage infrastructure, proximity to utilities, rail and access to water transportation networks, ensuring connectivity to provincial, national, and international markets.

“Securing land for Frontier Lithium’s future plans in the City of Thunder Bay marks a pivotal moment for Northern Ontario,” said Trevor Walker, Chief Executive Officer of Frontier Lithium. “This investment reinforces Ontario’s strength as a critical hub for Canada’s battery materials sector and the global clean energy transition. In addition to housing our planned lithium processing facility, regional office, and innovation centre, Thunder Bay is ideally positioned to support the broader regional lithium supply chain as new resources come online.”

“Thunder Bay has long been a hub for Ontario’s mining industry. With Frontier as an anchor, we believe Thunder Bay will become a center for critical mineral processing,” said Ken Boshcoff, Mayor of Thunder Bay. “We’re excited about what Frontier is planning and for the economic opportunities they’ll help create.”

As part of its commitment to sustainable resource development, Frontier Lithium is working closely with community partners, industry stakeholders, and government agencies to ensure the successful execution of this transformative project in Thunder Bay—reinforcing Canada’s position as a global leader in battery materials production.

 

Financing

The Financing has closed on the terms disclosed in the press release dated February 25, 2025. It was provided by a lender that is a related party to the Company under Multilateral Instrument 61-101 and TSXV Policies due to its affiliation with Mr. Reginald (Rick) F. Walker, Chairman of the Board of Directors.

The net proceeds from the Financing were used to purchase the Mission Island Lands. The convertibility of the Loan into common shares of the Company remains subject to receipt of final approval from the TSX Venture Exchange.

 

About Frontier Lithium

Frontier Lithium Inc. is a pre-production mining company with an objective to become a strategic and integrated supplier of premium spodumene concentrates as well as battery-grade lithium salts to the growing electric vehicle, and energy storage markets in North America. The Company’s PAK Lithium project maintains the largest land position and resource in a premium lithium mineral district located in Ontario’s Great Lakes region.

 

About the PAK Lithium Project

The PAK Lithium Project is a fully integrated lithium development initiative, developing North America’s highest-grade lithium reserves. A joint venture between Frontier Lithium Inc. (92.5%) and Mitsubishi Corporation (7.5%), the project involves the extraction of lithium ore, advanced processing to produce high-purity lithium concentrates, and downstream refining facility to manufacture battery-grade lithium salts. A 2023 Pre-Feasibility Study by BBA E&C Inc., titled “National Instrument 43-101 Technical Report PFS PAK Lithium Project”, estimates a 24-year project life with a post-tax NPV (8%) of US$1.74 billion and an IRR of 24.1%. These results were disclosed in a May 31, 2023, press release and filed on SEDAR+ (www.sedarplus.ca).

Posted March 3, 2025

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News