The Prospector News

Equinox Gold Announces Commercial Production at the Santa Luz Gold Mine

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Equinox Gold Announces Commercial Production at the Santa Luz Gold Mine

 

 

 

 

 

Equinox Gold Corp. (TSX: EQX) (NYSE American: EQX) is pleased to announce that commercial production has been achieved at the Company’s Santa Luz Gold Mine in Brazil effective October 1, 2022.

 

The Santa Luz mill is operating at approximately 90% of design capacity of 7,400 tonnes per day, with recoveries consistently above 70% and ranging up to 85%. Approximately 23,000 ounces of gold have been produced to September 30, 2022, and gold production is expected to continue to increase through the fourth quarter of 2022.

 

Greg Smith, President & CEO of Equinox Gold, commented: “Santa Luz is our fourth operating mine in Brazil and represents 100,000 ounces of average annual production with mine life extension potential from near-mine surface targets, an underground deposit, and additional opportunities in the 70-km-long mineralized greenstone belt that hosts our Santa Luz and Fazenda mines. We thank the Santa Luz team for their dedication and hard work to achieve this commercial production milestone and celebrate their exemplary safety record, working more than 4.3 million hours since the start of construction with no lost-time injuries.”

 

About Equinox Gold

 

Equinox Gold is a Canadian mining company operating entirely in the Americas, with seven operating gold mines and a clear path to achieve more than one million ounces of annual gold production from a pipeline of development and expansion projects.

 

Posted October 4, 2022

Share this news article

MORE or "UNCATEGORIZED"


Tectonic Metals Drills 2.41 g/t Au Over 59.44 Metres, Including 11.82 g/t Au Over 10.67 Metres and 39.96 g/t Au Over 3.05 Metres at Alpha Bowl, Flat Gold Project, Alaska

Broad Gold Mineralization Starts at Surface, Returning 1.86 g/t A... READ MORE

October 15, 2026

Lithium Africa Intersects 8.0 m at 1.70% Li2O, including 4.0 m at 2.59% Li2O, Extending High-Grade Mineralization at Norrabees I

Lithium Africa Corp. (TSX-V: LAF) (FSE: 6MQ) (OTCQB: LTAFF) is pl... READ MORE

October 15, 2026

Tower Intersects 20.3 m of 3.13 g/t Au, Including 8.0 m of 7.16 g/t Au, at Rabbit North's Blue Sky Zone

Drilling also returns 134.0 m of 0.65 g/t Au in the Lower Domain;... READ MORE

October 15, 2026

Copper Road Signs Exploration Agreement with the Matachewan First Nation on the Ben Nevis Volcanic Complex Project

Copper Road Resources Inc. (TSX-V: CRD) is pleased to announce th... READ MORE

October 15, 2026

Brunswick Exploration Announces 302 Metre-Wide Spodumene-Bearing Pegmatite Interval at the Anatacau Main Project

Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) (FRANKFUR... READ MORE

October 15, 2026

Copyright 2026 The Prospector News