The Prospector News

Ellis Martin Report – “Skyharbour Resources Plans 10,000 Meter Program at Russell Lake Uranium Project” (Audio)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ellis Martin Report – “Skyharbour Resources Plans 10,000 Meter Program at Russell Lake Uranium Project” (Audio)

 

 

 

https://youtu.be/NENKLUkhL8w

 

Ellis Martin Report: Skyharbour Resources to Carry Out Multiple Phases of Diamond Drilling Totalling 10,000 Metres at the Russell Lake Uranium Project, Saskatchewan. Join Ellis Martin for a conversation with Jordan Trimble, the President and Chief Executive Officer of Skyharbour Resources (TSX-V:SYH) (OTCQB:SYHBF) a preeminent uranium and thorium exploration Company with projects located in the prolific Athabasca Basin of Saskatchewan, Canada. In this segment Mr. Trimble reviews the upcoming drill program for 2023 at the Russell Lake Uranium Project in the high-grade Athabasca Basin of Saskatchewan, Canada.

 

Skyharbour Resources Ltd. is pleased to announce plans for a multi-phased drill campaign at its recently optioned 73,294 hectare Russell Lake Uranium Project strategically located in the central core of the Eastern Athabasca Basin of northern Saskatchewan. Skyharbour is planning 10,000 metres of diamond drilling over three phases to be completed by September of next year and is fully funded for the drill campaign.

 

Jordan Trimble, President and CEO of Skyharbour, stated: “We are very excited to be announcing plans for our multi-phased, 10,000 m drill campaign at the Russell Lake Uranium Project. This is a key milestone for Skyharbour and will provide consistent news flow for the next year. Uranium properties with the pedigree and potential of Russell Lake are rare given the high-grade mineralization in historical drill holes coupled with the many highly prospective exploration targets that offer the potential to generate new discoveries scattered across the large project area.”

 

“Furthermore, Skyharbour continues to grow its prospect generator business with several new partner companies optioning the South Falcon East, Wallee and Usam Projects. Over the next year, the Company is anticipating the largest combined drilling and exploration campaigns at its core projects of Russell and Moore, as well as at its partner-funded projects of East Preston, Hook Lake, Mann Lake, Yurchison, South Falcon East, Wallee and Usam.”

 

http://www.skyharbourltd.com

 

Courtesy of the Ellis Martin Report

 

Posted November 27, 2022

Share this news article

MORE or "UNCATEGORIZED"


Updated Kiniero Feasibility Study Achieves Increase +46% in Gold Reserves and +89% NPV to US$322M

HIGHLIGHTS: Increased Reserves Life Of Mine: Mineral Reserves inc... READ MORE

January 14, 2025

Asante Announces Bibiani Underground Feasibility Study Results

Asante Gold Corporation (CSE:ASE) (GSE:ASG) (FRANKFURT:1A9) (U.S.... READ MORE

January 14, 2025

Vital Battery Metals Drills 20.5m of 1.21% Cu Including 5.0m of 2.22% Cu at Sting Copper Project

Highlights Strong copper grades from maiden fall 2024 drill progr... READ MORE

January 14, 2025

Lithium Ionic Reports 32% Growth in Updated Mineral Resource Estimate at Baixa Grande - Salinas, Minas Gerais, Brazil

Lithium Ionic Corp. (TSX-V: LTH) (OTCQB: LTHCF) (FSE: H3N) is ple... READ MORE

January 14, 2025

TRX Gold Reports More High-Grade Intercepts at Stamford Bridge

Zone extended another 25 meters   TRX Gold Corporation (TSX: TRX... READ MORE

January 14, 2025

Copyright 2025 The Prospector News