The Prospector News

Capstone Copper Announces First Saleable Copper Concentrate at MVDP in Chile

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Capstone Copper Announces First Saleable Copper Concentrate at MVDP in Chile

 

 

 

 

 

Capstone Copper Corp. (TSX:CS) (ASX:CSC) is pleased to announce that first saleable copper concentrate was produced at its Mantoverde Development Project in Chile, as the mine advances commissioning and ramps up to full production levels.

 

The unchanged key commissioning milestones at the MVDP include:

  • First ore to the primary crusher – completed in Q4 2023
  • First ore to the grinding circuit – completed in Q1 2024
  • First saleable concentrate – completed in Q2 2024
  • Achievement of nameplate operating rates – expected during Q3 2024

 

“First saleable copper concentrate production at MVDP is a significant milestone for Capstone. This achievement is a testament to our dedicated and skilled teams, who continue to work towards a safe and efficient ramp-up to nameplate operating rates. MVDP remains on track and on budget with our guidance previously disclosed,” John MacKenzie, Capstone’s Chief Executive Officer, commented. “In July, we plan to release an updated feasibility study for our Santo Domingo project, followed by a feasibility study for our Mantoverde Optimized project later in the quarter, which will define the next phases of our value-accretive production growth in the district.”

 

For a virtual tour of the Mantoverde Development Project please visit: https://vrify.com/decks/12698-mantoverde-development-project

 

About MVDP

 

MVDP is expected to enable the mine to process 236 million tonnes of copper sulphide reserves (which represent approximately 20% of total sulphide resources) over a 20-year expected mine life, in addition to existing oxide reserves. The MVDP involves the addition of a sulphide concentrator (nominal 32,000 ore tonnes per day) and tailings storage facility, and the expansion of the existing desalination plant and other minor infrastructure.

 

About Capstone Copper Corp.

 

Capstone Copper Corp. is an Americas-focused copper mining company headquartered in Vancouver, Canada. We own and operate the Pinto Valley copper mine located in Arizona, USA, the Cozamin copper-silver mine located in Zacatecas, Mexico, the Mantos Blancos copper-silver mine located in the Antofagasta region, Chile, and 70% of the Mantoverde copper-gold mine, located in the Atacama region, Chile. In addition, we own the fully permitted Santo Domingo copper-iron-gold project, located approximately 30 kilometres northeast of Mantoverde in the Atacama region, Chile, as well as a portfolio of exploration properties in the Americas.

 

Capstone Copper’s strategy is to unlock transformational copper production growth while executing on cost and operational improvements through innovation, optimization and safe and responsible production throughout our portfolio of assets. We focus on profitability and disciplined capital allocation to surface stakeholder value. We are committed to creating a positive impact in the lives of our people and local communities, while delivering compelling returns to investors by responsibly producing copper to meet the world’s growing needs.

 

Posted June 26, 2024

Share this news article

MORE or "UNCATEGORIZED"


Bunker Hill Announces Final Tranche of Silver Loan Facility

Bunker Hill Mining Corp. (TSX-V:BNKR) (OTCQB:BHLL) announces that... READ MORE

February 2, 2026

NexGold Intersects 3.31 g/t Gold over 20.0 Metres at the Goldlund Deposit, and Announces Change in Board of Directors

NexGold Mining Corp. (TSX-V: NEXG) (OTCQX: NXGCF) is pleased to p... READ MORE

February 2, 2026

Trident Announces Full Exercise of Over-Allotment Option and Expected Proceeds of $18.6 Million to Fully Fund Expanded 2026 Drilling at Saskatchewan Gold Projects

Trident Resources Corp. (TSX-V: ROCK) (OTCQB: TRDTF) is pleased ... READ MORE

February 2, 2026

Capitan Silver Intersects 1,130.1 g/t Silver Equivalent over 1.5 Metres, Within a Wider Zone of 240.5 g/t Silver Equivalent over 25.9 Metres at the Cruz De Plata Project

Capitan Silver Corp. (TSX-V: CAPT)  is pleased to report assay ... READ MORE

February 2, 2026

Equinox Gold Announces Significant New AI-Supported Gold Discovery 8 km from Valentine Mill and Additional High-Grade Gold Mineralization Outside of Resources at The Valentine Gold Mine, Canada

Highlight intercepts include 2.68 g/t gold over 32 metres, 22.10 ... READ MORE

February 2, 2026

Copyright 2026 The Prospector News