The Prospector News

Calibre’s Marathon Pit Ore Control Drilling at the Valentine Gold Mine Yields 44% Additional Gold on 47% Higher Grades Than Modelled in the 2022 Mineral Reserve

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Calibre’s Marathon Pit Ore Control Drilling at the Valentine Gold Mine Yields 44% Additional Gold on 47% Higher Grades Than Modelled in the 2022 Mineral Reserve

 

 

 

 

 

Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) is pleased to announce partial ore control reverse circulation infill drill results from the Marathon Pit, one of three open pits comprising the Valentine Gold Mine in Newfoundland & Labrador, Canada. The current 14-year life of mine plan, which includes the Leprechaun, Berry and Marathon open pits, hosts 2022 Mineral Reserves of 51.6 million tonnes grading 1.62 g/t gold containing 2.7 million ounces1. At the Marathon pit, the Company drilled 196 RC holes totaling 4,915 metres in three benches slated for mining in 2025. When comparing approximately the same tonnage to the 2022 Mineral Reserve model over three planned mining benches, the Ore Control Block model yields significantly more gold than the 2022 Mineral Reserve model due to 47% higher grades. These results coupled with the Leprechaun ore control results (see news release dated February 14, 2024) substantiate the 2022 Mineral Reserve and increase confidence.

 

Darren Hall, President and Chief Executive Officer of Calibre, stated: “The results from the initial Marathon pit ore control drilling are very encouraging with 47% higher gold grades resulting in 44% additional ounces vs the 2022 Mineral Reserve in the same area. Given these results, and construction at 77%, our confidence continues to increase as we responsibly advance towards first gold at Valentine during Q2, 2025.

 

Diamond drilling is also underway as part of our expanded, 100,000 metre program (see news release dated July 15, 2024) with three rigs targeting new gold mineralization along the Valentine Lake Shear Zone. We look forward to the first results expected in the coming weeks as we remain excited about the vast potential to yield further significant gold discoveries within the Valentine land package.”

 

Comparison of the Marathon Pit Ore Control Block Model to 2022 Mineral Reserve

 

Bench Ore Control Block Model 2022 Mineral Reserve Percent Difference
  Tonnes Grade (g/t Au) Ounces Tonnes Grade (g/t Au) Ounces Tonnes Grade (g/t Au) Ounces
344 36,065 1.32 1,526 36,441 1.06 1,245 -1 % +24 % +23 %
338 81,608 2.40 6,298 82,789 1.76 4,675 -1 % +37 % +35 %
332 73,237 2.37 5,591 75,718 1.40 3,410 -3 % +69 % +64 %
Total 190,901 2.19 13,415 194,948 1.49 9,330 -2 % +47 % +44 %

 

Quality Assurance/Quality Control

 

QA/QC protocols followed at the Valentine Gold Project for the RC ore control drilling include the insertion of blanks and standards at regular intervals in each sample batch. RC drillhole cuttings are cone split at the rig to nominally 2.5 kg samples, shipped to the SGS facility in Grand Falls-Windsor for preparation, split to 1 kg, and then shipped to SGS Burnaby, BC. for gold analysis by the LeachWELL method.

 

Qualified Person

 

The scientific and technical information contained in this news release was approved by David Schonfeldt P.GEO, Calibre Mining’s Corporate Chief Geologist and a “Qualified Person” under National Instrument 43-101.

 

About Calibre

 

Calibre is a Canadian-listed, Americas focused, growing mid-tier gold producer with a strong pipeline of development and exploration opportunities across Newfoundland & Labrador in Canada, Nevada and Washington in the USA, and Nicaragua. Calibre is focused on delivering sustainable value for shareholders, local communities and all stakeholders through responsible operations and a disciplined approach to growth. With a strong balance sheet, a proven management team, strong operating cash flow, accretive development projects and district-scale exploration opportunities Calibre will unlock significant value.

 

Posted September 3, 2024

Share this news article

MORE or "UNCATEGORIZED"


ATEX Announces Closing of Strategic Investment by Agnico Eagle and Final Settlement of Credit Facility

ATEX Resources Inc. (TSX-V: ATX) is pleased to announce the closi... READ MORE

November 4, 2024

Summa Silver Announces Closing of $6.5 Million Brokered Financing

Summa Silver Corp. (TSX-V: SSVR) (OTCQX: SSVRF) (FSE: 48X) is ple... READ MORE

November 4, 2024

Search Minerals Inc. Completes $1M Convertible Note Financing with Closing of Second Tranche in the Amount of $700,000

Search Minerals Inc. (TSX-V: SMY)  is pleased to announce that i... READ MORE

November 1, 2024

NEW FOUND REPORTS POSITIVE PHASE II METALLURGICAL TEST RESULTS DEMONSTRATING 97% GOLD EXTRACTION AT ICEBERG AND ICEBERG EAST

New Found Gold Corp. (TSX-V: NFG) (NYSE-A: NFGC) is pleased to re... READ MORE

November 1, 2024

GoldHaven Enters into Definitive Agreement to Acquire BC Gold & Copper Assets

GoldHaven Resources Corp. (CSE: GOH) (OTCQB: GHVNF) (FSE: 4QS0) ... READ MORE

November 1, 2024

Copyright 2024 The Prospector News