The Prospector News

Calibre Intercepts High Grade Gold Mineralization at the Limon Mine Complex, Proximal to the Limon Processing Plant; Drilling Intersects Include 68.72 g/t Gold Over 2.0 Metres and 18.68 g/t Gold Over 6.0 Metres

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Calibre Intercepts High Grade Gold Mineralization at the Limon Mine Complex, Proximal to the Limon Processing Plant; Drilling Intersects Include 68.72 g/t Gold Over 2.0 Metres and 18.68 g/t Gold Over 6.0 Metres

 

 

 

 

 

Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) is pleased to announce exciting drill results from its 2023 resource expansion and infill program at the Tigra, Limon Norte and Pozo Bono open pit deposits located next to the Limon processing plant. These high-grade intercepts combined with the recent positive news from the Panteon VTEM Gold Corridor, demonstrate that the entire Limon district remains open for expansion and discovery.

 

Drill intercept highlights from the Tigra, Limon Norte and Pozo Bono targets include:

  • 68.72 g/t Au over 2.0 metres Estimated True Width and 16.49 g/t Au over 5.9 metres ETW including 26.71 g/t Au over 3.5 metres ETW in Hole LIM-23-4875;
  • 18.68 g/t Au over 5.9 metres ETW including 55.68 g/t Au over 2.0 metres ETW in Hole LIM-23-4876;
  • 9.26 g/t Au over 5.0 metres ETW including 17.10 g/t Au over 2.6 metres ETW in Hole LIM-23-4858;
  • 12.85 g/t Au over 4.2 metres ETW including 14.00 g/t Au over 3.8 metres ETW in Hole LIM-23-4793;
  • 11.91 g/t Au over 3.1 metres ETW including 15.22 g/t Au over 2.2 metres ETW in Hole LIM-23-4798;
  • 8.95 g/t Au over 11.3 metres ETW including 21.96 g/t Au over 4.2 metres ETW in Hole LIM-23-4812;
  • 7.36 g/t Au over 8.4 metres ETW including 11.80 g/t Au over 4.9 metres ETW in Hole LIM-23-4805.

 

Note: Estimated True Widths for reported vein intercepts are based on 3D models of the individual veins. Estimates are determined in cross-section by measuring the modelled vein thickness perpendicular to the vein margins and through the midpoint of the drill hole intercept. Percentage based differences between individual ETWs and down-hole interval lengths will vary between drill holes depending on drill hole inclination, variations in vein strike and dip, and overall geometries of the different vein systems.

 

Darren Hall, President and Chief Executive Officer of Calibre, stated: “I am excited by these exceptionally high-grade drill results from numerous targets at our Limon Gold Mine. Drilling efforts have not only instilled confidence at the yet-to-be-developed Pozo Bono open pit project but have also identified underground potential along the Limon trend. These results, coupled with the continuous high-grade drill results from the Panteon VTEM Gold Corridor, put us in a solid position to replace reserves for year-end 2023. The Limon district has produced over 4.5 million ounces of gold, and continues to demonstrate its significant value, reinforcing our confidence that resource conversion and high-grade additions will drive production and extend mine life. With multiple rigs active, 2024 is proving to be another exciting and productive year, with drilling operations underway at numerous targets.”

 

“The Valentine Gold Mine construction team remains focused, with overall progress at 55% and on track for production in H1 2025. SAG and ball mill motors arrived into Newfoundland on February 21, and the mills are scheduled to arrive in the next few days.”

 

Link 1Figures

Link 2Drilling Tables

 

Quality Assurance/Quality Control

Calibre maintains a Quality Assurance/Quality Control program for all its exploration projects using industry best practices. Key elements of the QA/QC program include verifiable chain of custody for samples, regular insertion of certified reference standards and blanks, and duplicate check assays. Drill core is halved and shipped in sealed bags to Bureau Veritas in Managua, Nicaragua, an independent analytical services provider with global certifications for Quality Management Systems ISO 9001:2008, Environmental Management: ISO14001 and Safety Management OH SAS 18001 and AS4801. Prior to analysis, samples are prepared at Veritas’ Managua facility and then shipped to its analytical facility in Vancouver, Canada. Gold analyses are routinely performed via fire assay/AA finish methods. For greater precision of high-grade material, samples assaying 10 g/t Au or higher are re-assayed by fire assay with gravimetric finish. Analyses for silver and other elements of interest are performed via Induction Coupled Plasma (ICP).

 

Qualified Person

The scientific and technical information contained in this news release was approved by David Schonfeldt P.GEO, Calibre Mining’s Corporate Chief Geologist and a “Qualified Person” under National Instrument 43-101.

 

About Calibre

Calibre is a Canadian-listed, Americas focused, growing mid-tier gold producer with a strong pipeline of development and exploration opportunities across Newfoundland & Labrador in Canada, Nevada and Washington in the USA, and Nicaragua. Calibre is focused on delivering sustainable value for shareholders, local communities and all stakeholders through responsible operations and a disciplined approach to growth. With a strong balance sheet, a proven management team, strong operating cash flow, accretive development projects and district-scale exploration opportunities Calibre will unlock significant value.

Posted February 26, 2024

Share this news article

MORE or "UNCATEGORIZED"


URANIUM ENERGY CORP ANNOUNCES THE CLOSING OF $203 MILLION PUBLIC OFFERING

Proceeds to be Used to Accelerate the Development of the United ... READ MORE

October 6, 2025

Barrick Announces Sale of Interest in Tongon for Up To $305 Million

Barrick Mining Corporation (NYSE:B) (TSX:ABX) announced that it h... READ MORE

October 6, 2025

Aquitaine Metals Drills Broad High-Grade Gold Mineralization: 16.45 g/t gold over 20.00 metres at Limousin Project

Aquitaine Metals Corp. is pleased to announce the first drill res... READ MORE

October 6, 2025

B2Gold Achieves Commercial Production at the Goose Mine

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) is pleased to announce th... READ MORE

October 6, 2025

Osisko Development Provides Infill Drilling Update on Its 13,000-Meter Lowhee Program at Cariboo Gold Project; Intercepts Include 45.24 G/T Gold Over 3.0 Meters, Including 233.92 G/T Gold Over 0.5 Meters

HIGHLIGHTS 2,279 m of infill drilling completed on 10-m dr... READ MORE

October 6, 2025

Copyright 2025 The Prospector News