The Prospector News

Calibre Delivers First Ore From the Volcan Open Pit Located 5 Km From the Libertad Mill, Leading to a Stronger H2, 2024

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Calibre Delivers First Ore From the Volcan Open Pit Located 5 Km From the Libertad Mill, Leading to a Stronger H2, 2024

 

 

 

 

 

Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) is pleased to announce first ore delivery to the Libertad Mill from its 100% owned Volcan Deposit located 5 km south of the mill. Volcan is anticipated to be a meaningful contributor to the Company’s production profile during the second half of 2024.

 

Darren Hall, President and Chief Executive Officer of Calibre, stated: “I am pleased with the rapid progress at the Volcan open pit considering first ore delivery to the mill during July within a month of receiving environmental permits. Volcan will contribute to higher production in H2 given the initial open pit resource averages 2.0 g/t gold, and consequently we remain confident in delivering into our annual production guidance of 275,000 – 300,000 ounces. The addition of Volcan demonstrates the effectiveness of our hub and spoke operating strategy, with surplus capacity at the Libertad mill there remains strong potential for low cost, high return on investment growth.”

 

“Additionally, with engineering of the fully funded Valentine Gold Mine at 98%, and construction at 77% we are confident in delivering first gold during Q2 2025 establishing Calibre as a quality mid-tier gold producer.”

 

About Calibre

 

Calibre is a Canadian-listed, Americas focused, growing mid-tier gold producer with a strong pipeline of development and exploration opportunities across Newfoundland & Labrador in Canada, Nevada and Washington in the USA, and Nicaragua. Calibre is focused on delivering sustainable value for shareholders, local communities and all stakeholders through responsible operations and a disciplined approach to growth. With a strong balance sheet, a proven management team, strong operating cash flow, accretive development projects and district-scale exploration opportunities Calibre will unlock significant value.

 

Posted August 8, 2024

Share this news article

MORE or "UNCATEGORIZED"


Critical Metals Corp Reports Extremely High-Grade Drilling Results From its 2024 Program: 103 PPM Gallium & rare earth elements of 27.0% HREO & TREO Range 0.48% to 0.55% & Zirconium Oxide of 1.99% From Tanbreez in Greenland

Superior drilling results continue to exceed the Company’s expe... READ MORE

August 18, 2025

American Lithium Closes Oversubscribed Private Placement

American Lithium Corp. (TSX-V:LI) (OTCQX:AMLIF) (Frankfurt:5LA1) ... READ MORE

August 18, 2025

North Peak to Investigate Economic Potential of Historic Dumps at Prospect Mountain Mine Complex

North Peak Resources Ltd. (TSX-V: NPR) (OTCQB: NPRLF) announces t... READ MORE

August 18, 2025

InZinc Intersects 11.0% Zn, 2.3% Pb and 27.1 g/t Ag over 3.0 m within a 40% Extension of Sedex Mineralized Trend at Indy Project, Central BC

InZinc Mining Ltd. (TSX-V: IZN) is pleased to report the first re... READ MORE

August 18, 2025

Fortuna drills 4.5 g/t Au over 37.4 meters at Kingfisher and 11.2 g/t Au over 5.6 meters at Sunbird, Séguéla Mine, Côte d’Ivoire

Fortuna Mining Corp. (NYSE: FSM) (TSX: FVI) is pleased to report ... READ MORE

August 18, 2025

Copyright 2025 The Prospector News