Cadillac Mines Corporation (TSX: CADY), is pleased to announce additional assay results from diamond drilling at the Chesterville East Extension, at Kerr-Addison, located in Virginiatown, Ontario. Drilling reported today continues to increase drill density within that area, in ground not included in the 2026 Mineral Resource Estimate. These results continue to support the potential extension of the 2026 mineral resource pit to the northeast.
Additionally, infill drilling within the resource pit also continues to intersect significant mineralization in material classified as waste in the 2026 MRE. These infill results not only continue to better define inferred areas within the pit that are expected to convert to higher confidence resources going forward but will also reduce the overall strip.
Results are reported for 34 drill holes totalling 14,104 metres: 17 at CVE Extension and 17 within the resource pit. All assay results in this release were received after the cut-off date for the 2026 MRE and were not used in that estimate.
Chesterville East Extension Drilling Highlights
Selected highlight results include:
Infill Drilling Highlights
Selected highlight results include:
Rick Howes, Chief Executive Officer of Cadillac Mines, stated, “At CVE the work is now about continuing to increase quality and confidence. These holes fill in the area we reported in September and continue to return mineralization in ground that is not within our current resource.” Mr. Howes continued. “Along with continued results at CVE and both inside and immediately below the pit, this drilling shows Kerr still has room to grow on several fronts.”
Geology and Context of Results
The Kerr-Addison Deposit is an Archean orogenic gold system located in the Abitibi Greenstone Belt. It is spatially associated with the Larder Lake Cadillac Deformation Zone, a major crustal fault that acted as a conduit for hydrothermal fluids and controlled the emplacement of gold mineralization. The Kerr Fault, a steeply north dipping subsidiary splay of the LLCDZ, strikes eastward across the property and is taken as the boundary between the hangingwall to the north and the footwall panels to the south. There are five main mineralized domains that host the Kerr mineralization: Green Carbonate and Flow domains, which constitute the Main Break mineralization that accounted for over 10 million ounces of historical gold production, and the Footwall (Chesterville or CVE), Albitic and Graphitic domains which accounted for under 0.5 Moz of historic production.
Chesterville East Extension
Expansion drilling at CVE continued following the results reported on September 21, 2026. Drilling during this period continued to test the CVE zone along strike and at depth, and increased drill density in the area previously reported.
Infill Drilling
Drilling within and below the 2026 MRE resource pit continues to test areas not included in the 2026 MRE that the Company has interpreted as mineralized from existing drilling and warranting further testing.
Infill drilling within the resource pit continues to test material treated as waste in the 2026 MRE, including areas the Company has interpreted as mineralized from existing drilling. Subject to an updated mineral resource estimate, these results are expected to support the conversion of this material to new mineral resources, with the potential to reduce the overall strip ratio.
CVE Extension and Infill drilling will continue through the end of the year and into Q1 2027 to increase drill density in more sparsely drilled areas, ahead of the next MRE update in mid-2027
Figure 1

Plan Map of selected highlight drill hole section locations with recently modelled Au grade shells.
Figure 2

Plan Map of all drill hole locations from this release, surface projection of 2026 Mineral Resource Estimate with MRE pit outline at surface. Areas shown as interpreted mineralization represent the Company’s geological interpretation of mineralization intersected in drilling. They are not included in the 2026 Mineral Resource Estimate, as drill spacing in these areas is currently insufficient. They are not Mineral Resources and there is no certainty that further drilling will result in their inclusion in a Mineral Resource.
Figure 3

Longitudinal section A-A’ looking northwest, showing highlighted 2026 drill hole intersections from this release in full colour, with black outlines, previous drilling in semi-transparent. Intersections are sized by Au grade multiplied by metres. Intersection points with a black border and label correspond to the selected highlights presented in this release. Previously released and historical drill holes not shown.
Figure 4

Cross section B-B’ looking northeast, showing drill hole KAD26-515 with 2026 MRE Block Model and interpreted mineralization. Note that the 2026 MRE Resource Pit Shell does not extend this far east. Previously released and historical drill holes as well as intersections from this release that did not meet the highlight section criteria are shown in grey. Reported intervals are estimated true width.
Figure 5

Cross section C-C’ looking northeast, showing drill holes KAD26-534 and KAD26-557 with 2026 MRE Block Model, interpreted mineralization and 2026 MRE Resource Pit Shell. Previously released and historical drill holes as well as intersections from this release that did not meet the highlight section criteria are shown in grey. Reported intervals are estimated true width. Areas shown as interpreted mineralization represent the Company’s geological interpretation of mineralization intersected in drilling. They are not included in the 2026 Mineral Resource Estimate, as drill spacing in these areas is currently insufficient. They are not Mineral Resources and there is no certainty that further drilling will result in their inclusion in a Mineral Resource.
Figure 6

Cross section D-D’ looking northeast, showing drill hole KAD26-460 with 2026 MRE Block Model, interpreted mineralization and 2026 MRE Resource Pit Shell. Note the within pit footwall interval of 1.46 g/t Au over 9.5 m which may add volume to the Inferred resource blocks as well as the 1.78 g/t Au over 6.3 m intersection within the hangingwall domain approximately 100 m below the Resource Pit. Previously released and historical drill holes as well as intersections from this release that did not meet the highlight section criteria are shown in grey. Reported intervals are estimated true width. Areas shown as interpreted mineralization represent the Company’s geological interpretation of mineralization intersected in drilling. They are not included in the 2026 Mineral Resource Estimate, as drill spacing in these areas is currently insufficient. They are not Mineral Resources and there is no certainty that further drilling will result in their inclusion in a Mineral Resource.
Figure 7

Cross section E-E’ looking northeast, showing drill hole KAD26-523A with 2026 MRE Block Model, interpreted mineralization and 2026 MRE Resource Pit Shell. The upper intersection sits within the resource pit in material not included in the 2026 MRE. Intersections approximately 50 to 75 metres below the resource pit sit below blocks classified as Inferred Mineral Resources. Previously released and historical drill holes as well as intersections from this release that did not meet the highlight section criteria are shown in grey. Reported intervals are estimated true width. Areas shown as interpreted mineralization represent the Company’s geological interpretation of mineralization intersected in drilling. They are not included in the 2026 Mineral Resource Estimate, as drill spacing in these areas is currently insufficient. They are not Mineral Resources and there is no certainty that further drilling will result in their inclusion in a Mineral Resource.
Figure 8

Cross section F-F’ looking northeast, showing drill hole KAD26-554 with hangingwall intersection well above the 2026 Resource Pit average grade. Previously released and historical drill holes as well as intersections from this release that did not meet the highlight section criteria are shown in grey. Reported intervals are estimated true width. Areas shown as interpreted mineralization represent the Company’s geological interpretation of mineralization intersected in drilling. They are not included in the 2026 Mineral Resource Estimate, as drill spacing in these areas is currently insufficient. They are not Mineral Resources and there is no certainty that further drilling will result in their inclusion in a Mineral Resource.
Table 1. Selected Significant Results
| Hole ID | From (m) |
To (m) |
Downhole Interval (m) |
ETW (m) |
Au (g/t) |
Zone | |
| KAD26-460 | 107.3 | 122.0 | 14.6 | 9.5 | 1.46 | KA Open Pit | |
| 231.9 | 241.1 | 9.1 | 6.3 | 1.78 | |||
| KAD26-489 | 19.0 | 26.0 | 7.0 | 3.8 | 7.96 | KA Open Pit | |
| Incl. | 23.9 | 26.0 | 2.1 | 1.2 | 22.50 | ||
| KAD26-499A | 150.0 | 158.5 | 8.5 | 5.4 | 2.76 | CVE Extension | |
| KAD26-515 | 277.6 | 313.0 | 35.4 | 18.4 | 1.50 | CVE Extension | |
| KAD26-523A | 465.4 | 472.6 | 7.2 | 5.9 | 2.30 | KA Open Pit | |
| KAD26-534 | 237.0 | 261.0 | 24.0 | 18.0 | 1.19 | CVE Extension | |
| 277.6 | 299.0 | 21.4 | 16.3 | 0.77 | |||
| KAD26-536 | 133.0 | 134.0 | 1.0 | 0.6 | 38.04 | KA Open Pit | |
| KAD26-540A | 290.0 | 296.9 | 7.0 | 4.2 | 2.55 | KA Open Pit | |
| KAD26-548 | 242.0 | 243.0 | 1.0 | 0.5 | 22.40 | KA Open Pit | |
| KAD26-549 | 319.9 | 320.9 | 1.0 | 0.7 | 61.09 | CVE Extension | |
| 328.2 | 350.2 | 22.0 | 16.2 | 0.68 | |||
| KAD26-550 | 77.6 | 86.9 | 9.4 | 6.0 | 1.90 | KA Open Pit | |
| KAD26-554 | 201.5 | 214.3 | 12.8 | 8.0 | 3.89 | KA Open Pit | |
| Incl. | 203.8 | 207.5 | 3.8 | 2.4 | 11.23 | ||
| KAD26-557 | 316.0 | 328.1 | 12.2 | 8.4 | 3.39 | CVE Extension | |
| Incl. | 316.0 | 316.8 | 0.8 | 0.6 | 46.17 | ||
Notes on Table 1:
Table 2. Drill hole locations.
| Drill Hole | Easting | Northing | Elevation (masl) |
Azimuth | Dip | Total Length (m) |
Zone |
| KAD26-456 | 605296 | 5332300 | 312.0 | 289 | -48 | 285 | KA Open Pit |
| KAD26-460 | 606321 | 5332973 | 332.3 | 326 | -46 | 270 | KA Open Pit |
| KAD26-464 | 605246 | 5332279 | 308.7 | 295 | -45 | 189 | KA Open Pit |
| KAD26-489 | 605686 | 5332625 | 321.6 | 151 | -62 | 579 | KA Open Pit |
| KAD26-490 | 605175 | 5332469 | 304.7 | 118 | -44 | 306 | KA Open Pit |
| KAD26-497 | 606216 | 5333212 | 329.9 | 126 | -68 | 590.25 | CVE Extension |
| KAD26-499³ | 606318 | 5333260 | 334.7 | 124 | -55 | 201.53 | CVE Extension |
| KAD26-499A | 606318 | 5333260 | 334.7 | 121 | -58 | 237 | CVE Extension |
| KAD26-499B | 606318 | 5333260 | 334.7 | 123 | -56 | 494 | CVE Extension |
| KAD26-510 | 606026 | 5333132 | 321.0 | 148 | -61 | 657 | KA Open Pit |
| KAD26-511 | 606352 | 5332896 | 316.3 | 149 | -70 | 180 | CVE Extension |
| KAD26-512 | 606216 | 5333212 | 329.9 | 123 | -66 | 567 | CVE Extension |
| KAD26-515 | 606318 | 5333260 | 334.7 | 122 | -73 | 600 | CVE Extension |
| KAD26-516 | 606482 | 5332943 | 306.3 | 317 | -77 | 252 | CVE Extension |
| KAD26-523³ | 606026 | 5333132 | 321.0 | 150 | -47 | 167 | KA Open Pit |
| KAD26-523A | 606026 | 5333133 | 320.9 | 150 | -47 | 590 | KA Open Pit |
| KAD26-524 | 606216 | 5333212 | 329.9 | 179 | -54 | 585 | CVE Extension |
| KAD26-528 | 606318 | 5333260 | 334.7 | 170 | -57 | 561 | CVE Extension |
| KAD26-534 | 606318 | 5333260 | 334.7 | 159 | -52 | 462 | CVE Extension |
| KAD26-536 | 605445 | 5332337 | 311.6 | 333 | -47 | 201 | KA Open Pit |
| KAD26-539 | 606216 | 5333212 | 329.9 | 182 | -59 | 621 | CVE Extension |
| KAD26-540³ | 605938 | 5333110 | 312.1 | 141 | -60 | 120 | KA Open Pit |
| KAD26-540A | 605938 | 5333110 | 312.1 | 138 | -62 | 399 | KA Open Pit |
| KAD26-544 | 606175 | 5333035 | 319.0 | 142 | -46 | 396 | KA Open Pit |
| KAD26-545 | 606318 | 5333260 | 334.7 | 131 | -70 | 645 | CVE Extension |
| KAD26-548 | 605937 | 5333111 | 312.1 | 138 | -67 | 588 | KA Open Pit |
| KAD26-549 | 606216 | 5333212 | 329.9 | 171 | -52 | 531 | CVE Extension |
| KAD26-550 | 606178 | 5333033 | 319.0 | 139 | -56 | 417 | KA Open Pit |
| KAD26-553 | 606318 | 5333260 | 334.7 | 138 | -56 | 467 | CVE Extension |
| KAD26-554 | 605937 | 5333109 | 312.0 | 154 | -57 | 399 | KA Open Pit |
| KAD26-555 | 606216 | 5333212 | 329.9 | 152 | -55 | 304 | CVE Extension |
| KAD26-557 | 606318 | 5333260 | 334.7 | 150 | -58 | 509 | CVE Extension |
| KAD26-559 | 605937 | 5333111 | 312.1 | 168 | -62 | 338 | KA Open Pit |
| KAD26-562 | 605938 | 5333109 | 312.0 | 136 | -56 | 396 | KA Open Pit |
Notes on Table 2:
2026 Exploration Summary and Outlook
Kerr-Addison is the flagship property of Cadillac Mines and is located along the historic Cadillac Larder Lake Break. In 2026, Cadillac is executing its largest ever annual drill campaign, targeting the completion of 145,000 meters of diamond drilling across its entire property portfolio, including Larder and Galloway, at a budgeted cost of approximately $65 million. Through the end of October 2026, Cadillac completed 122,927 metres of drilling, representing 85% of the full-year target. Currently Cadillac is operating 13 diamond drill rigs, with six focused on expanding mineralization and collecting preliminary geomechanical data at its newly acquired Larder Property, four testing mineralization extents on the Galloway property in Quebec, one currently testing below the known mineralization at the Geminid Nickel target, and two targeting infill and expansionary drilling at Kerr-Addison.
During the fourth quarter, Cadillac Mines initiated a property wide airborne geophysical survey covering the Larder, Galloway and Kerr properties and is planning a ground based deep penetrating MT geophysical survey. In addition, Cadillac has contracted Geologic AI to scan over 40,000 m of historic Galloway core from the 400-hole historical diamond drill database, collecting continuous XRF chemistry plus hyperspectral mineralogy to aid in the geologic interpretation and re-assaying of select intervals of core for Copper and Molybdenum.
Mineral Resource Estimate
The third MRE for the Kerr-Addison Deposit was prepared in accordance with the CIM Definition Standards (2014) and CIM Best Practice Guidelines (2019), as incorporated by reference in NI 43-101. The effective date of the latest MRE is February 27, 2026, and the estimate was completed under the supervision of Maxime Ménard, P.Geo., the Qualified Person responsible for the estimate.
Table 3. 2026 Mineral Resource Estimate
| Resource Category | Tonnage (Mt) |
Gold Grade (g/t) |
Metal Content (Moz Au) |
| Open Pit | |||
| Indicated | 74.3 | 1.3 | 3.0 |
| Inferred | 13.6 | 0.6 | 0.3 |
| Underground | |||
| Indicated | 4.1 | 2.6 | 0.4 |
| Inferred | 12.3 | 4.9 | 1.9 |
| Total | |||
| Indicated | 78.5 | 1.3 | 3.4 |
| Inferred | 25.9 | 2.7 | 2.2 |
Notes on Table 3:
Quality Assurance and Quality Control Procedures
Cadillac Mines maintains an internal quality assurance and quality control program at the Kerr-Addison Project to ensure sampling and analysis of all exploration work is conducted in accordance with industry-standard best practices.
Drill core is logged and sampled at core logging facilities in Virginiatown and Rouyn-Noranda under the supervision of a Qualified Geologist. Sample intervals are selected by a geologist based on geological observations, with sample numbers, certified reference materials, and blanks inserted into the sample sequence and recorded in the database. Drill core is cut in half using an automated core saw equipped with a diamond-tipped blade. One half of the core is placed in labelled plastic sample bags and then packaged in plastic shipping containers for shipment, while the remaining half is returned to the core box and retained for future reference. Saws and surrounding areas are thoroughly cleaned at the end of every shift and between each hole.
Core samples are transported by Manitoulin Transport to ALS Geochemistry in Thunder Bay and Rouyn-Noranda for sample preparation and gold analysis and then shipped to ALS Geochemistry in North Vancouver for multi-element analysis. Sample preparation includes crushing the sample to at least 70% passing 2 mm. A 500 g sub-sample is collected using a riffle splitter, transferred into a sealed and uniquely coded jar, and analyzed for gold by Photon Assay. A second sub-sample of up to 250 g is collected using a riffle splitter, pulverized to at least 85% passing 75 microns, and analyzed for multi-element chemistry using four-acid digestion of a 0.25 g analytical split with an ICP-AES finish.
Cadillac Mines inserts CRMs (5%), blanks (5%), and duplicate (5%) samples into the sample stream to monitor analytical accuracy, contamination, and sampling precision. ALS Laboratories are an ISO/IEC accredited laboratory and maintain internal quality control procedures, including the insertion of laboratory blanks, reference materials, and pulp duplicates.
Qualified Person
Mr. Kerry Sparkes, M.Sc. P.Geo. is Cadillac’s SVP Exploration and the Qualified Person who has approved the technical information disclosed in this release.
Messrs. Maxime Ménard, P.Geo. and Sunil Koppalkar, P.Eng., from G Mining Services Inc. are the Qualified Persons responsible for the preparation of the Kerr Addison Mineral Resource Estimate.
About Cadillac Mines
Cadillac Mines Corporation is a Canadian mineral exploration company advancing a growing portfolio of gold and critical mineral projects along the prolific Cadillac-Larder Lake Break in Ontario and Québec. Anchored by the historic Kerr-Addison Mine, the Company is focused on expanding its gold resource base, advancing the Geminid nickel deposit and unlocking the broader potential of its district-scale Abitibi land position. Through disciplined exploration, technical excellence and responsible development, Cadillac Mines is working to create lasting value for shareholders, communities and other stakeholders. For more information about the Company, please visit www.cadillacmines.com.
Additional Information
For further information, please contact:
Hannes Portmann, Chief Financial Officer
hportmann@cadillacmines.com
55 North Gold Inc. (CSE: FFF) (OTCQB: FFFNF) (FSE: 6YF) is pleased to announce that it has entered i... READ MORE
Sitka Gold Corp. (TSX-V: SIG) (FSE: 1RF) (OTCQX: SITKF) is pleased to announce a strategic partnersh... READ MORE
Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) (FRANKFURT:1XQ) is pleased to announce the cl... READ MORE
Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) is pleased to announce financial and... READ MORE