The Prospector News

Barrick On Track to Achieve 2023 Targets

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Barrick On Track to Achieve 2023 Targets

 

 

 

 

 

All amounts expressed in US Dollars

 

Barrick Gold Corporation (TSX:ABX) (NYSE:GOLD) reported preliminary Q1 sales of 0.95 million ounces of gold and 89 million pounds of copper, as well as preliminary Q1 production of 0.95 million ounces of gold and 88 million pounds of copper. As previously guided, Barrick’s gold production in 2023 is expected to increase through the year with the first quarter being the lowest, while copper production is expected to be higher in the second half of the year. We remain on track to achieve our full year gold and copper guidance1.

 

The average market price for gold in Q1 was $1,890 per ounce while the average market price for copper in Q1 was $4.05 per pound.

 

As previously guided, preliminary Q1 gold production was lower than Q4 2022 primarily as a result of lower production at Carlin, mainly due to annual roaster maintenance resulting in lower throughput at Goldstrike, the conversion of the Goldstrike autoclave to a conventional carbon-in-leach process and a harsh winter in northern Nevada impacting operations. This was combined with lower grades at Kibali due to mine sequencin Compared to Q4 2022, Q1 gold cost of sales per ounce2 is expected to be 3% to 5% higher, total cash costs per ounce3 are expected to be 13% to 15% higher and all-in sustaining costs per ounce3 are expected to be 9% to 11% higher. The higher total cash costs per ounce3 reflects the lower ounces produced and sold relative to the prior quarter, while the increase in all-in sustaining costs per ounce3 was also driven by lower sales volumes partially offset by lower sustaining capital expenditures.

 

Preliminary Q1 copper production was lower than Q4 2022, driven by lower production at Lumwana and Zaldívar, as expected. Compared to Q4 2022, Q1 copper cost of sales per pound2 is expected to be up to 2% higher and C1 cash costs per pound3 are expected to be 19% to 21% higher, mainly due to lower mining rates as the new fleet at Lumwana continues to ramp up, as well as higher labor costs at Zaldívar. All-in sustaining costs per pound3 are expected to be 14% to 16% lower, as lower sustaining capital expenditures more than offset the increase in C1 cash costs per pound3.

 

Barrick will provide additional discussion and analysis regarding its first quarter 2023 production and sales when the Company reports its quarterly results before North American markets open on May 3, 2023.

 

The following table includes preliminary gold and copper production and sales results from Barrick’s operations:

 

  Three months ended
March 31, 2023
  Production Sales
Gold (attributable ounces (000))    
Carlin (61.5%) 166 164
Cortez (61.5%) 140 137
Turquoise Ridge (61.5%) 81 82
Phoenix (61.5%) 27 26
Long Canyon (61.5%) 2 2
Nevada Gold Mines (61.5%) 416 411
Loulo-Gounkoto (80%) 137 134
Pueblo Viejo (60%) 89 90
North Mara (84%) 68 70
Kibali (45%) 64 67
Tongon (89.7%) 50 52
Bulyanhulu (84%) 44 46
Veladero (50%) 43 44
Hemlo 41 40
Total Gold 952 954
     
     
Copper (attributable pounds (millions))    
Lumwana 48 49
Zaldívar (50%) 22 23
Jabal Sayid (50%) 18 17
Total Copper 88 89

 

Technical Information

 

The scientific and technical information contained in this news release has been reviewed and approved by: Craig Fiddes, SME-RM, Lead, Resource Modeling, Nevada Gold Mines; Chad Yuhasz, P.Geo, Mineral Resource Manager, Latin America & Asia Pacific; and Richard Peattie, MPhil, FAusIMM, Mineral Resources Manager, Africa and Middle East — each a “Qualified Person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

 

Endnote 1

 

Porgera has been on temporary care and maintenance since April 2020 and is not currently included in our full year 2023 guidance. On April 9, 2021, the Government of Papua New Guinea (“PNG”) and Barrick Niugini Limited (“BNL”), the operator of the Porgera joint venture, signed a Framework Agreement in which they agreed on a partnership for Porgera’s future ownership and operation. On February 3, 2022, the Framework Agreement was replaced by the more detailed Porgera Project Commencement Agreement (the “Commencement Agreement”). On March 31, 2023, PNG, BNL, and New Porgera Limited, the new Porgera joint venture company, entered into the New Porgera Progress Agreement, which confirmed that all parties are committed to reopening the mine, in line with the terms of the Commencement Agreement and the Shareholders Agreement both concluded in 2022. We expect to update our guidance to include Porgera following the execution of all of the definitive agreements to implement the binding Commencement Agreement, the satisfaction of all other conditions precedent to reopening, and the finalization of a timeline for the resumption of full mine operations.

 

Endnote 2

 

Gold cost of sales per ounce is calculated as cost of sales across our gold operations (excluding sites in care and maintenance) divided by ounces sold (both on an attributable basis based on Barrick’s ownership share). Copper cost of sales per pound is calculated as cost of sales across our copper operations divided by pounds sold (both on an attributable basis based on Barrick’s ownership share).

 

References to attributable basis means our 100% share of Hemlo and Lumwana, our 89.7% share of Tongon, our 84% share of North Mara and Bulyanhulu, our 80% share of Loulo-Gounkoto, our 61.5% share of Nevada Gold Mines, our 60% share of Pueblo Viejo, our 50% share of Veladero, Zaldívar and Jabal Sayid and our 45% share of Kibali.

 

Endnote 3

 

Total cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce are non-GAAP financial measures which are calculated based on the definition published by the World Gold Council (‘WGC’) (a market development organization for the gold industry comprised of and funded by gold mining companies from around the world, including Barrick). The WGC is not a regulatory organization. Management uses these measures to monitor the performance of our gold mining operations and its ability to generate positive cash flow, both on an individual site basis and an overall company basis.

 

Total cash costs start with our cost of sales related to gold production and removes depreciation, the non-controlling interest of cost of sales and includes by-product credits. All-in sustaining costs start with total cash costs and include sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs and reclamation cost accretion and amortization. These additional costs reflect the expenditures made to maintain current production levels.

 

We believe that our use of total cash costs, all-in sustaining costs and all-in costs will assist analysts, investors and other stakeholders of Barrick in understanding the costs associated with producing gold, understanding the economics of gold mining, assessing our operating performance and also our ability to generate free cash flow from current operations and to generate free cash flow on an overall company basis. Due to the capital-intensive nature of the industry and the long useful lives over which these items are depreciated, there can be a significant timing difference between net earnings calculated in accordance with IFRS and the amount of free cash flow that is being generated by a mine and therefore we believe these measures are useful non-GAAP operating metrics and supplement our IFRS disclosures. These measures are not representative of all of our cash expenditures as they do not include income tax payments, interest costs or dividend payments. These measures do not include depreciation or amortization.

 

Total cash costs per ounce, all-in sustaining costs and all-in costs are intended to provide additional information only and do not have standardized definitions under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures are not equivalent to net income or cash flow from operations as determined under IFRS. Although the WGC has published a standardized definition, other companies may calculate these measures differently.

 

C1 cash costs per pound and all-in sustaining costs per pound are non-GAAP financial measures related to our copper mine operations. We believe that C1 cash costs per pound enables investors to better understand the performance of our copper operations in comparison to other copper producers who present results on a similar basis. C1 cash costs per pound excludes royalties and production taxes and non-routine charges as they are not direct production costs. All-in sustaining costs per pound is similar to the gold all-in sustaining costs metric and management uses this to better evaluate the costs of copper production. We believe this measure enables investors to better understand the operating performance of our copper mines as this measure reflects all of the sustaining expenditures incurred in order to produce copper. All-in sustaining costs per pound includes C1 cash costs, sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs, royalties and production taxes, reclamation cost accretion and amortization and write-downs taken on inventory to net realizable value.

 

Barrick will provide a full reconciliation of these non-GAAP financial measures when the Company reports its quarterly results on May 3, 2023.

 

Posted April 13, 2023

Share this news article

MORE or "UNCATEGORIZED"


New report charts a fast-track to energy, critical minerals and infrastructure development that could generate $1.1 trillion in GDP growth by 2035

The Public Policy Forum (PPF) released a landmark report that out... READ MORE

May 15, 2025

Goldshore Expands the Superion Zone with 9.45m of 6.02 g/t Au in Follow Up Drilling at the Moss Deposit

Goldshore Resources Inc. (TSX-V: GSHR) (OTCQB: GSHRF) (FWB: 8X00)... READ MORE

May 15, 2025

Kobo Resources Reports Strong Gold Intercepts of 8.0 m at 2.07 g/t Au and 8.0 m at 2.16 g/t Au and Improves Structural Understanding at Kossou

Latest diamond drill results confirm strong gold continuity acros... READ MORE

May 15, 2025

G Mining Ventures Reports First Quarter 2025 Results

G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) is pleased to ... READ MORE

May 15, 2025

Firefly Metals Ltd. - Green Bay Copper-Gold Project, Canada

FireFly’s first drilling in new area hits high-grade VMS mi... READ MORE

May 15, 2025

Copyright 2025 The Prospector News